Skip to content
Home › Shows › Aviation › MRO Middle East & AIME 2027
Dubai · DWTCAviation

MRO Middle East & AIME 2027 Exhibition Stand Design & Build (DWTC)

Full-service custom stands for MRO Middle East and Aircraft Interiors Middle East 2027 at Dubai World Trade Centre — design, in-house build, the DWTC Permit to Build and H&S paperwork, install and on-stand support. Built to win airline, lessor and MRO buyers.

Custom exhibition stand designed and built by SOL Dubai at Dubai World Trade Centre
★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★2–3 Feb 2027Next edition★AviationAudience★2 daysDuration★48 hoursQuote turnaround★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★2–3 Feb 2027Next edition★AviationAudience★2 daysDuration★48 hoursQuote turnaround

MRO Middle East & AIME 2027 at a glance

MRO Middle East is the region’s aviation maintenance, repair and overhaul event, organised by Aviation Week Network, part of Informa Markets. It is held together with Aircraft Interiors Middle East (AIME), which covers cabin design, passenger comfort and inflight entertainment. The 2027 edition runs for two days, 2–3 February 2027, at the Dubai World Trade Centre (DWTC).

The 2026 edition, held in an expanded hall, brought together 330 exhibitors and 8,937 attendees from 102 countries, including 900 airline and lessor buyers. The organisers described it as a record edition. Those buyer numbers are what make the show worth the stand: a large share of the people walking the aisles sign off maintenance contracts, parts purchases and cabin programmes.

DWTC is our home venue, and our workshop in Al Quoz is a short drive from the halls, which matters on a two-day show where build-up and breakdown windows are tight. Breakbulk Middle East is also scheduled at DWTC on the same dates, so build-up will be busy across the venue and delivery slots are worth booking early.

Who walks the halls

MRO Middle East connects airlines, lessors, MRO providers, original equipment manufacturers (OEMs) and aftermarket suppliers. Visitors include engineering and maintenance directors, technical procurement teams, fleet managers and lessor asset managers, alongside the MRO shops and parts distributors who serve them. AIME adds airline product and cabin teams, interiors specialists and inflight entertainment buyers.

These are technical buyers with long purchasing cycles. A maintenance contract or a cabin retrofit is not signed on the stand, but the shortlist often starts there. A stand at this show is a place to start and continue relationships, show capability and hold meetings that have been booked in advance.

What an MRO or AIME stand has to do

Most MRO exhibitors sell a service: hangar capacity, component repair, engine work, parts supply or engineering support. Services are hard to display, so the stand has to show capability in a few clear signals. A well-chosen component on a plinth, a short film of your hangar or shop floor, the approvals and certifications you hold, and the aircraft types and engines you support tell a technical buyer more than a slogan.

AIME exhibitors are different. Cabin products sell on touch and feel, so seat mock-ups, galley inserts, lighting systems and inflight entertainment screens need to be on the stand at full scale, set out as they would be in an aircraft. Visitors should be able to sit in the seat, use the screen and see the finish under cabin-like lighting. For both audiences, the stand also needs private meeting space, because conversations with airlines and lessors often involve commercial details that cannot be discussed in an open aisle.

One more point is worth planning for. Because MRO Middle East and AIME run together, many visitors move between maintenance and cabin exhibitors in the same visit. A supplier that serves both markets, such as a company that repairs seats as well as supplying cabin parts, can use one stand with two clearly signed zones, so each audience finds its part of the business without confusion.

Our stand build process

Every Dubai project runs through our eight-stage process, handled in-house from brief to dismantle:

  1. Discovery and brief — we list the components, mock-ups or screens you will show, with sizes, weights and power needs, plus your meeting schedule, and confirm hall, stand number and dimensions at DWTC.
  2. Concept and 3D design — visuals and a floor plan that balance product display with closed meeting rooms.
  3. Costing and approval — a fixed, itemised quote covering structure, meeting rooms, AV, power and logistics.
  4. Venue approvals and technical drawings — structural, electrical and floor-loading submissions prepared for DWTC.
  5. Fabrication — walls, plinths, meeting rooms, joinery and graphics built and checked in our own workshop.
  6. Pre-build and QA — trial assembly with your mock-ups and components in position, so fixings, finishes and lighting are proven.
  7. On-site installation — supervised build at DWTC during official build-up, handed over show-ready.
  8. Show-day support and dismantling — a standby team on call across both days, then careful dismantling and return of your hardware.

Meeting rooms and hospitality

On a two-day show with pre-booked meetings, the meeting area often decides how much business a stand can handle. We build closed meeting rooms with doors, good acoustic separation and screens for presentations, plus an open lounge for shorter conversations. A small storage room keeps literature, give-aways and personal items out of sight, and a coffee point lets you host airline guests properly without leaving the stand.

Larger MROs and OEMs often choose a double-decker stand, putting meeting rooms on the upper floor and keeping the ground floor open for display and walk-in visitors. At DWTC a two-storey stand needs certified structural calculations, a displayed maximum-occupancy figure and code-compliant staircases, and the structural file must clear the DWTC engineer before the Permit to Build is released. We prepare and submit all of it in-house.

Showing hardware and cabin products

Components, landing gear parts, engine modules and cabin mock-ups can be heavy and awkward. We check each item’s weight against the hall’s floor-loading limits, schedule its delivery before the stand walls close and build plinths sized and fixed for the load. Clear barriers protect sensitive hardware while keeping it visible, and lighting is aimed at the product so finishes and detail read well.

For AIME, seats and monuments need floor space and room to walk around them. We plan sightlines from the aisle so a passing visitor sees the cabin product first, then lay out the stand so they can step in, sit down and try it. Inflight entertainment demonstrations need reliable power and, often, network connections; mains power at DWTC is supplied by the venue’s official electrical contractor and ordered in advance, so we order it early at the advance rate.

Booking lead times

For a custom stand at DWTC we recommend starting 8–14 weeks before the show, and earlier for a double-decker or a large pavilion, because the venue’s technical approval and permits come before any building starts. A modular stand with custom graphics needs less lead time. Send us your hall, stand size and show dates and we will set out a build timeline that fits them.

The steps are the same for every show. We agree the brief and budget, then send 3D concepts and a costed quote. Once the design is approved we prepare the structural drawings and submit them to the organiser and DWTC for approval. Fabrication runs in our workshop alongside that approval, so the stand is built and checked before move-in. On site we handle the build, power and furniture, stay on call through the open days, and take everything down and clear the space at the end.

Stand options and pricing

We build every format at this show. Modular stands, from AED 950 per square metre, suit smaller suppliers and first-time exhibitors who need clean branding, a display and a meeting point. Custom stands, from AED 1,650 per square metre, give you a bespoke layout with meeting rooms and full-size product displays. Premium builds start from AED 2,400 and double-decker and pavilion builds from AED 3,200.

The final figure depends on stand size, the hardware on display, the number of meeting rooms, AV and branding. Every quote is fixed and itemised, so the price you approve is the price you pay.

Why aviation companies choose SOL Dubai

We are a Dubai-based stand builder with our own workshop in Al Quoz, and DWTC is the venue we work in most. We handle MRO Middle East and AIME stands from start to finish: design, fabrication, venue approvals, power and floor-loading planning, on-site installation and dismantling. Stands with closed meeting rooms, heavy hardware and double-decker structures are work our in-house team does every season.

Clients get workshop-built quality, one accountable team and a price that holds from quote to final invoice. If you also exhibit at the Airport Show in Dubai, we can carry your stand design across both events.

Building at Dubai World Trade Centre: the rules that shape your MRO Middle East & AIME 2027 stand

MRO Middle East & AIME 2027 is governed by the Dubai World Trade Centre’s own technical regulations. Get them right and your stand goes up cleanly; miss a submission and you lose build time, not just money. We design to all of this from the first sketch and file the paperwork for you.

Permit to Build

Every stand needs a DWTC Stand Permit to Build (PTB) before construction. We prepare and submit it so your build is cleared to start on day one of build-up.

Height & “complex” structures

Standard custom builds work to around 4m. Taller builds and anything DWTC classes as complex — double-deckers, long spans, or stands where the travel distance to an exit exceeds 10m — trigger structural-engineer clearance through DWTC’s Organiser+ portal before the Permit to Build is released, and the engineer can halt an unsafe build on site.

Double-deckers

A two-storey stand needs certified structural calculations, a Double-Deck health-and-safety declaration, a displayed maximum-occupancy figure and code-compliant staircases — at least 1m wide with handrails, and a second staircase once an upper deck passes ~200 sqm or sits over 25m from the stairs.

Electrical power

All mains power is supplied by DWTC’s official Electrical Contractor and ordered in advance — you can’t self-wire mains. We design the scheme and order it, including 24-hour power where your stand needs it.

Rigging & suspended elements

Banners and lighting rigs hung from the hall are subject to DWTC approval and load limits and ordered ahead of tenancy. We prepare and file the rigging submission on time.

Fixings & fire-safe materials

Nothing may be fixed to the floors, walls, ceilings or structural steel, and all materials must be fire-retardant — Perspex is prohibited (Lexan and Macralon are accepted). We complete and inspect finishes in our workshop, so the on-site crew assembles an approved build.

Accreditation & deadlines

Every contractor needs a DWTC Contractor+ digital badge and PPE is mandatory. Structural, rigging and electrical submissions run weeks ahead of build-up, and late orders attract surcharges — we manage the badges and the deadlines.

Recent Builds

Recent builds from our workshop

Real stands designed and built by our in-house team. Every stand is pre-built and inspected before it ships to Dubai World Trade Centre.

SOL Dubai custom stand, built in our Dubai workshop
Custom stand · SOL Dubai
SOL Dubai island stand, built in our Dubai workshop
Island stand · SOL Dubai
SOL Dubai double-decker, built in our Dubai workshop
Double-decker · SOL Dubai
SOL Dubai feature-lit, built in our Dubai workshop
Feature-lit · SOL Dubai
SOL Dubai bespoke build, built in our Dubai workshop
Bespoke build · SOL Dubai
SOL Dubai country pavilion, built in our Dubai workshop
Country pavilion · SOL Dubai
View our full portfolio
Transparent Pricing

MRO Middle East & AIME 2027 stand pricing — all-inclusive

One quote covers design, in-house build, graphics, delivery, install, dismantle and venue paperwork — fixed and itemised, with a free 3D concept before you commit.

Modular
9–18 sqm
From
AED 950 / sqm
Best for: first-time and value-focused exhibitors
  • Reusable system structure
  • Custom-printed graphics
  • LED lighting & furniture
  • Delivery, install & dismantle
  • Venue paperwork handled
Get a quote
Premium
50–100 sqm
From
AED 2,400 / sqm
Best for: large, high-impact stands with demo space
  • Everything in Custom, plus:
  • Large-scale custom build
  • Double-height feature elements
  • Full AV & feature lighting
  • Demo / hospitality area
  • Priority in-house build slot
Get a quote
Double-Decker / Pavilion
100+ sqm
From
AED 3,200 / sqm
Best for: flagship presence and country pavilions
  • Everything in Premium, plus:
  • Two-storey engineered build
  • VIP lounge & meeting rooms
  • Certified structural sign-off
  • Country-pavilion capable to 1,500 sqm
Get a quote

Not included: venue space rental (paid to the organiser), and venue electrical & rigging orders (we place these at the advance rate on your behalf and bill at cost). Bespoke add-ons are quoted line by line, so the number you sign is the number you pay.

Case Studies

Real briefs. Real results.

See how brands turn raw floor space into a working show presence — every project handed over to a documented client sign-off.

Explore all case studies →
Field Notes

Build notes for Dubai World Trade Centre

The detail that isn’t in the exhibitor manual — from the people who build here.

CD
Carlos Dalè
General Manager, SOL Dubai · oversees stand design and build to venue rules across Dubai, Abu Dhabi and Riyadh
01

Permit to Build gates everything — file the structural calcs early

At DWTC nothing gets built without a Permit to Build, and for any complex or double-deck stand that permit depends on structural calculations clearing the DWTC engineer. We submit on Organiser+ the week the design is signed off — a late structural file, not the build, is what most often delays a stand.

02

Mains power is DWTC’s to supply — order it, don’t wire it

All mains electrical comes from DWTC’s official contractor and is ordered in advance. We book power — including 24-hour supply where a stand needs it — at the advance rate so nothing is sitting dead on opening morning.

03

Finish in the workshop — Perspex won’t pass

Only fire-retardant materials are allowed and Perspex is specifically prohibited (we use Lexan or Macralon). We complete and inspect every finish at our workshop, so the on-site crew assembles an approved build instead of fabricating in the hall.

04

Lock the slot early

DWTC’s calendar is packed, so build-up slots, rigging and power book out and late orders cost more. We secure your space-only window and order services at the advance rate.

Common mistakes, in order of frequency

  1. An oversized logo on the back wall that crowds out the one-line proposition a buyer reads in three seconds.
  2. The same graphic on the front and side panels of an inline stand — the aisle-facing side panel is your most wasted surface.
  3. A counter or sign at the very front that blocks the sightline into the stand and stops buyers stepping in.
  4. Under-ordering power — no 24-hour supply for fridges, screens or live demos, so the stand isn’t ready on opening morning.
  5. Leaving structural, rigging and electrical orders until after the venue deadlines and paying avoidable surcharges.
FAQ

MRO Middle East & AIME 2027 stand questions, answered

Real answers with real numbers — including the venue’s build rules. Click any question to expand.

When and where is MRO Middle East & AIME 2027?
MRO Middle East and Aircraft Interiors Middle East 2027 take place together on 2 and 3 February 2027 at the Dubai World Trade Centre (DWTC), organised by Aviation Week Network, part of Informa Markets.
How much does an MRO Middle East or AIME stand cost?
A full-service stand starts from about AED 950/sqm for a modular build, AED 1,650/sqm for a custom stand, AED 2,400/sqm for large premium builds and AED 3,200/sqm for double-decker and pavilion builds. These are approximate starting points; every quote is fixed and itemised, with a free 3D concept.
How far ahead should we book a stand for MRO Middle East & AIME?
We recommend starting 8–14 weeks before the show for a custom stand, and earlier for a double-decker or pavilion, because the venue’s structural approval and permits come first. A modular stand with custom graphics needs less lead time. Send us your hall and stand size and we will set out a timeline that fits your dates.
Who handles the Dubai World Trade Centre permits and approvals?
We do. Every stand at DWTC needs a Stand Permit to Build, and complex or double-deck stands need structural calculations cleared by the DWTC engineer through the Organiser+ portal first. We prepare the drawings, submit them and manage the approval.
Can I get power for screens and inflight entertainment demos?
Yes. Mains power at DWTC is supplied by the venue’s official electrical contractor and ordered in advance. We design the electrical plan with your team and place the order at the advance rate.
Do you build double-decker stands at MRO Middle East?
Yes. A two-storey stand puts meeting rooms upstairs above an open display floor. It needs certified structural calculations, a displayed maximum-occupancy figure and code-compliant staircases. We engineer, certify and build it in-house.
What’s included in a full-service stand?
Custom 3D design, in-house fabrication and pre-build, full graphics, delivery to Dubai World Trade Centre, install and dismantle, the DWTC Permit to Build and H&S paperwork, electrical and rigging ordered on your behalf, and a dedicated project manager. Venue space rental is paid to the organiser and is not included.
Do you provide on-site support during the show?
Yes. Our team is on call across both show days for anything from a graphic touch-up to an electrical fault, and larger stands get a dedicated on-site project lead.
What happens to the stand and hardware after the show?
We dismantle and clear the space, return your components and mock-ups or hand them to your logistics agent, and can store reusable stand elements for your next edition.
How big is MRO Middle East?
The 2026 edition had 330 exhibitors and 8,937 attendees from 102 countries, including 900 airline and lessor buyers.
What is the difference between MRO Middle East and AIME?
MRO Middle East covers maintenance, repair and overhaul, the aviation aftermarket and OEM services. Aircraft Interiors Middle East covers cabin design, passenger comfort and inflight entertainment. They run together at the same venue on the same dates.
Can you display aircraft seats and cabin mock-ups?
Yes. We plan floor space and sightlines for seats and monuments, build plinths and platforms to carry them, and light them so visitors can see and try the finish.
Can we have closed meeting rooms on the stand?
Yes. We build meeting rooms with doors, acoustic separation and presentation screens, plus open lounge seating and a storage room, sized to your meeting schedule.
Which other shows run at DWTC on the same dates?
Breakbulk Middle East is also scheduled at DWTC on 2–3 February 2027. If your group exhibits at both, we can run the two stands as one project.
More Shows

More aviation shows we build for

Other shows our in-house team designs and builds for, with the same full-service service and full venue handling.

See the full show calendar

Get your MRO Middle East & AIME 2027 stand quote in 48 hours

Custom 3D rendering and all-inclusive pricing, designed to Dubai World Trade Centre’s rules with structural sign-off built into the timeline. We build in-house and install on site — the stand you approve in the rendering is the stand that opens.

Request a free quote
Live now