Skip to content
Home › Shows › Aviation › Airport Show 2027
Dubai · DWTCAviation

Airport Show 2027 Exhibition Stand Design & Build (DWTC)

Full-service custom stands for the Airport Show 2027 at Dubai World Trade Centre — design, in-house build, the DWTC Permit to Build and H&S paperwork, equipment and power planning, install and on-stand support. Built to win airport operators and aviation authorities.

Custom exhibition stand designed and built by SOL Dubai at Dubai World Trade Centre
★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★11–13 May 2027Next edition★AviationAudience★3 daysDuration★48 hoursQuote turnaround★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★11–13 May 2027Next edition★AviationAudience★3 daysDuration★48 hoursQuote turnaround

Airport Show 2027 at a glance

The Airport Show is a B2B exhibition for the airport industry, organised by RX at the Dubai World Trade Centre (DWTC) under the patronage of HH Sheikh Ahmed bin Saeed Al Maktoum, President of the Dubai Civil Aviation Authority. The organiser describes it as an entry point to the Middle East, Africa and South Asia (MEASA) aviation market. The 2027 edition runs for three days, 11–13 May 2027, from 10am to 5pm on 11 and 12 May and 10am to 4pm on 13 May.

The 2026 edition, the show’s 25th, was moved from May to 12–14 October 2026 and has now taken place. For that edition the organiser cites 150+ airport solution providers and 6,000+ decision-makers. Running alongside the exhibition are the Global Airport Leaders’ Forum, the Women in Aviation Middle East Conference and Awards and a Business Connect Programme of arranged meetings.

DWTC is our home venue, and our workshop in Al Quoz is a short drive from the halls, so we can support a stand at this show from first sketch to final breakdown, and handle any late changes from our own workshop rather than waiting on suppliers.

Who you are building for

The visitors are the people who build, run and regulate airports: airport operators and their engineering, operations and IT teams, aviation regulators and authorities, airlines and service providers, and the consultants who advise them. Many are working on new terminals, expansions or technology upgrades, and they come to compare suppliers and meet them face to face.

The show covers airport build and installations, airfield construction, airport operations, airport technology and IT, ground support equipment and services, airport security and air traffic control. That range means stands at this show look very different from one another: a baggage-handling system, a passenger screening lane, a ground power unit and an air traffic control software suite all need a different approach.

What an Airport Show stand has to do

Airport buyers make long-term, high-value decisions, and they want evidence. A stand has to show the product working, the airports where it already works and the capability behind it. For hardware, that means the real equipment at full scale where possible: a self-service kiosk visitors can use, a boarding gate they can walk through, a lighting fixture on a section of airfield surface, a screening system with a live demonstration.

For software and services, it means screens and control-room-style setups that let a visitor see the system in use, with someone on hand to walk them through it. Behind the demonstration, the stand needs meeting space for the conversations with operators and authorities that follow. With a Business Connect Programme arranging meetings on the floor, that space will be in use from the first hour.

References carry a lot of weight with this audience. An airport operator wants to know which airports already run your system, how long it took to install and how it has performed. A wall or screen of project references, with airport names and short facts where your clients allow it, often starts more conversations than the product itself. We design that space into the layout from the first sketch, close to the aisle where visitors can read it while they wait to talk to your team.

Our Airport Show stand build process

Every Dubai project runs through our eight-stage process, handled in-house from brief to dismantle:

  1. Discovery and brief — we list each piece of equipment and every demonstration, with sizes, weights, power and data needs, and confirm hall, stand number and dimensions at DWTC.
  2. Concept and 3D design — visuals and a floor plan that let visitors use or walk through your product, with meeting space set apart.
  3. Costing and approval — a fixed, itemised quote covering structure, flooring, demonstration areas, AV, power and logistics.
  4. Venue approvals and technical drawings — structural, electrical and floor-loading submissions prepared for DWTC.
  5. Fabrication — walls, platforms, plinths, meeting rooms and graphics built and checked in our own workshop.
  6. Pre-build and QA — trial assembly so fixings, cable routes and equipment positions are proven before build-up.
  7. On-site installation — supervised build at DWTC, coordinated with your equipment delivery and technicians.
  8. Show-day support and dismantling — a standby team on call for all three days, then dismantling and handover of equipment to your logistics agent.

Showing ground support equipment and heavy systems

Ground support equipment, airfield lighting and baggage systems are heavy and often large. We check each item’s weight against the hall’s floor-loading limits, schedule its delivery before the stand walls close and keep clear access routes for forklifts and vehicles during build-up and breakdown. Platforms and plinths are sized for the load, and barriers keep visitors at a safe distance from equipment that should not be touched, while leaving it in clear view.

Vehicles and large units need their arrival planned with the venue. We agree the sequence early, so heavy items go in first and the stand is built around them. Where a demonstration needs power, mains supply at DWTC comes from the venue’s official electrical contractor and is ordered in advance; we calculate the loads with your technicians and order at the advance rate.

Technology, security and control-room stands

Airport IT, passenger processing, security screening and air traffic control suppliers are selling systems that are easiest to understand in use. We build stands that recreate a slice of the airport: a check-in zone, a security lane, an operations room with large screens and workstations. Lighting is controlled so screens read well, cables run under raised floors and network points are planned with the venue in advance.

Some of these products are sensitive, and the people looking at them are often government and airport officials. A closed demonstration room lets you show detailed capability to invited guests only, while the open front of the stand handles general visitors. Our stand design team plans both zones together, so the move from public demonstration to private briefing feels natural for your guests.

Booking lead times

For a custom stand at DWTC we recommend starting 8–14 weeks before the show, and earlier for a double-decker or a large pavilion, because the venue’s technical approval and permits come before any building starts. A modular stand with custom graphics needs less lead time. Send us your hall, stand size and show dates and we will set out a build timeline that fits them.

The steps are the same for every show. We agree the brief and budget, then send 3D concepts and a costed quote. Once the design is approved we prepare the structural drawings and submit them to the organiser and DWTC for approval. Fabrication runs in our workshop alongside that approval, so the stand is built and checked before move-in. On site we handle the build, power and furniture, stay on call through the open days, and take everything down and clear the space at the end.

Stand options and pricing

We build every format at this show. Modular stands, from AED 950 per square metre, suit smaller suppliers and first-time exhibitors who need clean branding, a demonstration point and a meeting area. Custom stands, from AED 1,650 per square metre, give you a bespoke layout around your equipment and demonstrations. Premium builds start from AED 2,400, and double-decker and pavilion builds from AED 3,200, which suits larger suppliers who want meeting rooms upstairs above an open demonstration floor.

The final figure depends on stand size, the equipment and its power and loading needs, demonstration areas, meeting space and branding. Every quote is fixed and itemised, so the price you approve is the price you pay.

Why aviation suppliers choose SOL Dubai

We are a Dubai-based stand builder with our own workshop in Al Quoz, and DWTC is the venue we work in most. We handle Airport Show stands from start to finish: design, fabrication, venue approvals, power and floor-loading planning, on-site installation and dismantling. Stands with heavy equipment, live technology demonstrations and closed meeting rooms are work our in-house team does every season.

Clients get workshop-built quality, one accountable team and a price that holds from quote to final invoice. If you also exhibit at MRO Middle East & AIME in February, we can carry your stand design across both shows.

Building at Dubai World Trade Centre: the rules that shape your Airport Show 2027 stand

Airport Show 2027 is governed by the Dubai World Trade Centre’s own technical regulations. Get them right and your stand goes up cleanly; miss a submission and you lose build time, not just money. We design to all of this from the first sketch and file the paperwork for you.

Permit to Build

Every stand needs a DWTC Stand Permit to Build (PTB) before construction. We prepare and submit it so your build is cleared to start on day one of build-up.

Height & “complex” structures

Standard custom builds work to around 4m. Taller builds and anything DWTC classes as complex — double-deckers, long spans, or stands where the travel distance to an exit exceeds 10m — trigger structural-engineer clearance through DWTC’s Organiser+ portal before the Permit to Build is released, and the engineer can halt an unsafe build on site.

Double-deckers

A two-storey stand needs certified structural calculations, a Double-Deck health-and-safety declaration, a displayed maximum-occupancy figure and code-compliant staircases — at least 1m wide with handrails, and a second staircase once an upper deck passes ~200 sqm or sits over 25m from the stairs.

Electrical power

All mains power is supplied by DWTC’s official Electrical Contractor and ordered in advance — you can’t self-wire mains. We design the scheme and order it, including 24-hour power where your stand needs it.

Rigging & suspended elements

Banners and lighting rigs hung from the hall are subject to DWTC approval and load limits and ordered ahead of tenancy. We prepare and file the rigging submission on time.

Fixings & fire-safe materials

Nothing may be fixed to the floors, walls, ceilings or structural steel, and all materials must be fire-retardant — Perspex is prohibited (Lexan and Macralon are accepted). We complete and inspect finishes in our workshop, so the on-site crew assembles an approved build.

Accreditation & deadlines

Every contractor needs a DWTC Contractor+ digital badge and PPE is mandatory. Structural, rigging and electrical submissions run weeks ahead of build-up, and late orders attract surcharges — we manage the badges and the deadlines.

Recent Builds

Recent builds from our workshop

Real stands designed and built by our in-house team. Every stand is pre-built and inspected before it ships to Dubai World Trade Centre.

SOL Dubai custom stand, built in our Dubai workshop
Custom stand · SOL Dubai
SOL Dubai island stand, built in our Dubai workshop
Island stand · SOL Dubai
SOL Dubai double-decker, built in our Dubai workshop
Double-decker · SOL Dubai
SOL Dubai feature-lit, built in our Dubai workshop
Feature-lit · SOL Dubai
SOL Dubai bespoke build, built in our Dubai workshop
Bespoke build · SOL Dubai
SOL Dubai country pavilion, built in our Dubai workshop
Country pavilion · SOL Dubai
View our full portfolio
Transparent Pricing

Airport Show 2027 stand pricing — all-inclusive

One quote covers design, in-house build, graphics, delivery, install, dismantle and venue paperwork — fixed and itemised, with a free 3D concept before you commit.

Modular
9–18 sqm
From
AED 950 / sqm
Best for: first-time and value-focused exhibitors
  • Reusable system structure
  • Custom-printed graphics
  • LED lighting & furniture
  • Delivery, install & dismantle
  • Venue paperwork handled
Get a quote
Premium
50–100 sqm
From
AED 2,400 / sqm
Best for: large, high-impact stands with demo space
  • Everything in Custom, plus:
  • Large-scale custom build
  • Double-height feature elements
  • Full AV & feature lighting
  • Demo / hospitality area
  • Priority in-house build slot
Get a quote
Double-Decker / Pavilion
100+ sqm
From
AED 3,200 / sqm
Best for: flagship presence and country pavilions
  • Everything in Premium, plus:
  • Two-storey engineered build
  • VIP lounge & meeting rooms
  • Certified structural sign-off
  • Country-pavilion capable to 1,500 sqm
Get a quote

Not included: venue space rental (paid to the organiser), and venue electrical & rigging orders (we place these at the advance rate on your behalf and bill at cost). Bespoke add-ons are quoted line by line, so the number you sign is the number you pay.

Case Studies

Real briefs. Real results.

See how brands turn raw floor space into a working show presence — every project handed over to a documented client sign-off.

Explore all case studies →
Field Notes

Build notes for Dubai World Trade Centre

The detail that isn’t in the exhibitor manual — from the people who build here.

CD
Carlos Dalè
General Manager, SOL Dubai · oversees stand design and build to venue rules across Dubai, Abu Dhabi and Riyadh
01

Permit to Build gates everything — file the structural calcs early

At DWTC nothing gets built without a Permit to Build, and for any complex or double-deck stand that permit depends on structural calculations clearing the DWTC engineer. We submit on Organiser+ the week the design is signed off — a late structural file, not the build, is what most often delays a stand.

02

Mains power is DWTC’s to supply — order it, don’t wire it

All mains electrical comes from DWTC’s official contractor and is ordered in advance. We book power — including 24-hour supply where a stand needs it — at the advance rate so nothing is sitting dead on opening morning.

03

Finish in the workshop — Perspex won’t pass

Only fire-retardant materials are allowed and Perspex is specifically prohibited (we use Lexan or Macralon). We complete and inspect every finish at our workshop, so the on-site crew assembles an approved build instead of fabricating in the hall.

04

Lock the slot early

DWTC’s calendar is packed, so build-up slots, rigging and power book out and late orders cost more. We secure your space-only window and order services at the advance rate.

Common mistakes, in order of frequency

  1. An oversized logo on the back wall that crowds out the one-line proposition a buyer reads in three seconds.
  2. The same graphic on the front and side panels of an inline stand — the aisle-facing side panel is your most wasted surface.
  3. A counter or sign at the very front that blocks the sightline into the stand and stops buyers stepping in.
  4. Under-ordering power — no 24-hour supply for fridges, screens or live demos, so the stand isn’t ready on opening morning.
  5. Leaving structural, rigging and electrical orders until after the venue deadlines and paying avoidable surcharges.
FAQ

Airport Show 2027 stand questions, answered

Real answers with real numbers — including the venue’s build rules. Click any question to expand.

When and where is the Airport Show 2027?
The Airport Show 2027 takes place from 11 to 13 May 2027 at the Dubai World Trade Centre (DWTC), organised by RX. Hours are 10am–5pm on 11 and 12 May and 10am–4pm on 13 May.
How much does an Airport Show stand cost?
A full-service stand starts from about AED 950/sqm for a modular build, AED 1,650/sqm for a custom stand, AED 2,400/sqm for large premium builds and AED 3,200/sqm for double-decker and pavilion builds. These are approximate starting points; every quote is fixed and itemised, with a free 3D concept.
How far ahead should we book a stand for Airport Show?
We recommend starting 8–14 weeks before the show for a custom stand, and earlier for a double-decker or pavilion, because the venue’s structural approval and permits come first. A modular stand with custom graphics needs less lead time. Send us your hall and stand size and we will set out a timeline that fits your dates.
Who handles the Dubai World Trade Centre permits and approvals?
We do. Every stand at DWTC needs a Stand Permit to Build, and complex or double-deck stands need structural calculations cleared by the DWTC engineer through the Organiser+ portal first. We prepare the drawings, submit them and manage the approval.
Can I get power for equipment and live demonstrations?
Yes. Mains power at DWTC is supplied by the venue’s official electrical contractor and ordered in advance. We calculate the loads with your technicians and place the order at the advance rate.
Do you build double-decker stands at the Airport Show?
Yes. A two-storey stand puts meeting rooms upstairs above an open demonstration floor. It needs certified structural calculations, a displayed maximum-occupancy figure and code-compliant staircases. We engineer, certify and build it in-house.
What’s included in a full-service Airport Show stand?
Custom 3D design, in-house fabrication and pre-build, full graphics, delivery to Dubai World Trade Centre, install and dismantle, the DWTC Permit to Build and H&S paperwork, electrical and rigging ordered on your behalf, and a dedicated project manager. Venue space rental is paid to the organiser and is not included.
Do you provide on-site support during the show?
Yes. Our team is on call across all three show days for anything from a graphic touch-up to an electrical fault, and larger stands get a dedicated on-site project lead.
What happens to the stand and equipment after the show?
We dismantle and clear the space, coordinate with your logistics agent so equipment leaves safely, and can store reusable stand elements for your next edition.
What happened to the 2026 Airport Show?
The 2026 edition, the 25th, was moved from May to 12–14 October 2026 and has taken place. The next edition returns to May, on 11–13 May 2027.
How big is the Airport Show?
For the 2026 edition the organiser cites 150+ airport solution providers and 6,000+ decision-makers.
Can you display ground support equipment or vehicles?
Yes. We check weights against floor-loading limits, agree the delivery sequence with the venue so heavy items go in first, and build platforms and barriers around them.
Can we have a closed demonstration room?
Yes. We build closed rooms for showing sensitive systems to invited guests, alongside an open stand front for general visitors.
What runs alongside the Airport Show?
The Global Airport Leaders’ Forum, the Women in Aviation Middle East Conference and Awards and a Business Connect Programme of arranged meetings.
More Shows

More aviation shows we build for

Other shows our in-house team designs and builds for, with the same full-service service and full venue handling.

See the full show calendar

Get your Airport Show 2027 stand quote in 48 hours

Custom 3D rendering and all-inclusive pricing, designed to Dubai World Trade Centre’s rules with structural sign-off built into the timeline. We build in-house and install on site — the stand you approve in the rendering is the stand that opens.

Request a free quote
Live now