Skip to content
Home › Shows › Construction & Build › Big 5 Global 2026
Dubai · DWTCConstruction & Build

Big 5 Global 2026 Exhibition Stand Design & Build (DWTC)

Full-service custom stands for Big 5 Global 2026 at Dubai World Trade Centre — design, in-house build, the DWTC Permit to Build and H&S paperwork, install and on-stand support. Built to win contractors, consultants and developers.

Custom exhibition stand designed and built by SOL Dubai for a construction show at Dubai World Trade Centre
★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★23–26 Nov 2026Next edition★Construction & BuildAudience★4 daysDuration★48 hoursQuote turnaround★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★23–26 Nov 2026Next edition★Construction & BuildAudience★4 daysDuration★48 hoursQuote turnaround

Big 5 Global 2026 at a glance

Big 5 Global is the largest construction event in the Middle East, organised by dmg events at the Dubai World Trade Centre (DWTC). The 2026 edition runs for four days, 23–26 November 2026. The 2025 edition brought together 2,866 exhibitors and 85,093 attendees from 169 countries, with 70 exhibiting countries and 24 country pavilions, plus a summit programme with more than 1,800 delegates.

It is not one show but a week of them. Alongside the main Big 5 floor, the same halls host HVACR World, Heavy, Totally Concrete, Marble & Stone World, Urban Design & Landscape, GeoWorld and Future FM. Between them they cover the whole life of a building: materials and products, machinery, concrete and stone, mechanical systems, landscaping, surveying and the facility management that runs a building once it is handed over.

The audience is the people who specify and buy: contractors, consultants, architects, developers, procurement teams and government project owners from across the GCC, Africa and South Asia. As a Dubai-based stand builder, SOL Dubai works at DWTC as our home venue, so Big 5 is a show we know from the hall floor up.

What a Big 5 stand has to do

Big 5 is a product show first. Buyers walk the halls looking for materials and systems they can specify on real projects, so the stand has to put the product in front of them at full size: cladding and façade panels on real walls, flooring you can stand on, sanitaryware and fittings installed the way they will be on site, and machinery or equipment with room to walk around it. A brochure rack does not sell a façade system.

The second job is the conversation that follows. A consultant who likes a product wants technical data, certifications and project references, and a contractor wants pricing and lead times. That means a stand needs a clear product zone at the front and a quieter area further in for drawings, samples and meetings. With thousands of exhibitors across many halls, the stand also has to be readable from the aisle: one clear statement of what you make and who it is for, visible from a distance.

Our Big 5 stand build process

Every Dubai project runs through our eight-stage process, handled start to finish in-house:

  1. Discovery and brief — we list the products you will show, their sizes and weights, any power or water they need, your meeting requirements and budget, and confirm hall, stand number and dimensions at DWTC.
  2. Concept and 3D design — photorealistic visuals and a floor plan that place full-size product displays at the front and meeting space behind.
  3. Costing and approval — a fixed, fully itemised quotation covering structure, product mounting, power, AV and logistics.
  4. Venue approvals and technical drawings — structural, electrical and floor-loading submissions prepared for DWTC approval.
  5. Fabrication — walls, display structures, joinery and graphics built and quality-checked in our own workshop.
  6. Pre-build and QA — trial assembly with your sample products mounted, so fixings and finishes are proven before build-up.
  7. On-site installation — supervised build at DWTC during official build-up, handed over show-ready.
  8. Show-day support and dismantling — standby team on call, then careful dismantling and return or storage of your samples.

Materials and construction for product-heavy stands

Construction stands carry weight. Stone, tile, glass, timber and metal samples are heavy, so we build display walls with internal framing sized for the load and fix every sample mechanically rather than with adhesive alone. Where you want visitors to walk on your flooring or decking, we lay it as a working floor over a raised platform, which also hides the cabling for lighting and screens.

Lighting is planned around the product, not just the logo. Natural stone, ceramics and metal finishes look very different under poor light, so we use colour-accurate fittings aimed at the samples. Graphics are kept short and technical: product names, key performance figures and certifications that a specifier can photograph and take back to the office. All materials are fire-retardant to DWTC rules, and finishes are completed in our workshop so the hall build is assembly, not fabrication.

Planning around the co-located shows

Because Big 5 Global shares the week with HVACR World, Totally Concrete, Marble & Stone World, Heavy, Urban Design & Landscape, GeoWorld and Future FM, many companies exhibit in more than one hall or have sister brands in different shows. We can design and build several stands for the same group as one project, with consistent branding and one accountable team handling approvals and logistics for all of them.

Heavy equipment and large samples need extra planning. Machinery delivery is scheduled into the build-up timetable, floor-loading limits are checked against the weight on each square metre, and any item that needs power, water or drainage for a live demonstration is ordered through the venue in advance. We work these details out at the design stage, so the build-up week is spent assembling the stand rather than solving logistics.

Making four show days count

Big 5 runs for four days and the busiest hours are long, so the stand has to work for the team as well as the visitors. We plan a small storage room for samples, literature and personal items, a power point for charging tablets and phones, and enough seating in the meeting area for the conversations that run past twenty minutes. A counter near the aisle lets one person greet and qualify visitors while colleagues hold meetings further in.

Think too about what a specifier needs to take away. Sample boards, swatch cards and technical sheets should be easy to pick up without asking, and a screen showing completed projects gives consultants the references they look for. We design these touchpoints into the layout from the first sketch, rather than adding them on site.

Booking lead times

For a custom stand at DWTC we recommend starting 8–14 weeks before the show, and earlier for a double-decker or a large pavilion, because the venue’s technical approval and permits come before any building starts. A modular stand with custom graphics needs less lead time. Send us your hall, stand size and show dates and we will set out a build timeline that fits them.

The steps are the same for every show. We agree the brief and budget, then send 3D concepts and a costed quote. Once the design is approved we prepare the structural drawings and submit them to the organiser and DWTC for approval. Fabrication runs in our workshop alongside that approval, so the stand is built and checked before move-in. On site we handle the build, power and furniture, stay on call through the open days, and take everything down and clear the space at the end.

Stand options and pricing

We build every Big 5 format. Upgraded shell-scheme and modular packages suit smaller exhibitors and first-time exhibitors who need clean branding, a product wall and a meeting point. Custom single-storey stands give you a bespoke layout with full-size product displays, demonstration areas and meeting space. Double-decker stands let larger manufacturers and distributors add an upstairs meeting or hospitality floor above an open product area, which is valuable for hosting consultants and developers during a busy four-day show.

Custom Big 5 stand design and build starts from AED 1,650 per square metre. The final figure depends on the size of the stand, the weight and number of products on display, structure, meeting space and branding. Every quotation is fixed and itemised, so the price you approve is the price you pay.

Why construction brands choose SOL Dubai

We are a Dubai-based exhibition stand builder with our own workshop in Al Quoz, working at DWTC as our home venue. We handle Big 5 stands start to finish: design, fabrication, the venue approvals, product mounting and on-site installation. Heavy, product-led stands with meeting space are exactly the kind of work our in-house team is set up for.

Clients get workshop-built quality, a single accountable team and a price that holds from quotation to final invoice. If you also exhibit at Big 5 Construct Saudi in Riyadh, we can carry your stand design across both shows.

Building at Dubai World Trade Centre: the rules that shape your Big 5 Global 2026 stand

Big 5 Global 2026 is governed by the Dubai World Trade Centre’s own technical regulations. Get them right and your stand goes up cleanly; miss a submission and you lose build time, not just money. We design to all of this from the first sketch and file the paperwork for you.

Permit to Build

Every stand needs a DWTC Stand Permit to Build (PTB) before construction. We prepare and submit it so your build is cleared to start on day one of build-up.

Height & “complex” structures

Standard custom builds work to around 4m. Taller builds and anything DWTC classes as complex — double-deckers, long spans, or stands where the travel distance to an exit exceeds 10m — trigger structural-engineer clearance through DWTC’s Organiser+ portal before the Permit to Build is released, and the engineer can halt an unsafe build on site.

Double-deckers

A two-storey stand needs certified structural calculations, a Double-Deck health-and-safety declaration, a displayed maximum-occupancy figure and code-compliant staircases — at least 1m wide with handrails, and a second staircase once an upper deck passes ~200 sqm or sits over 25m from the stairs.

Electrical power

All mains power is supplied by DWTC’s official Electrical Contractor and ordered in advance — you can’t self-wire mains. We design the scheme and order it, including 24-hour power where your stand needs it.

Rigging & suspended elements

Banners and lighting rigs hung from the hall are subject to DWTC approval and load limits and ordered ahead of tenancy. We prepare and file the rigging submission on time.

Fixings & fire-safe materials

Nothing may be fixed to the floors, walls, ceilings or structural steel, and all materials must be fire-retardant — Perspex is prohibited (Lexan and Macralon are accepted). We complete and inspect finishes in our workshop, so the on-site crew assembles an approved build.

Accreditation & deadlines

Every contractor needs a DWTC Contractor+ digital badge and PPE is mandatory. Structural, rigging and electrical submissions run weeks ahead of build-up, and late orders attract surcharges — we manage the badges and the deadlines.

Recent Builds

Recent builds from our workshop

Real stands designed and built by our in-house team. Every stand is pre-built and inspected before it ships to Dubai World Trade Centre.

SOL Dubai custom stand, built in our Dubai workshop
Custom stand · SOL Dubai
SOL Dubai island stand, built in our Dubai workshop
Island stand · SOL Dubai
SOL Dubai double-decker, built in our Dubai workshop
Double-decker · SOL Dubai
SOL Dubai feature-lit, built in our Dubai workshop
Feature-lit · SOL Dubai
SOL Dubai bespoke build, built in our Dubai workshop
Bespoke build · SOL Dubai
SOL Dubai country pavilion, built in our Dubai workshop
Country pavilion · SOL Dubai
View our full portfolio
Transparent Pricing

Big 5 Global 2026 stand pricing — all-inclusive

One quote covers design, in-house build, graphics, delivery, install, dismantle and venue paperwork — fixed and itemised, with a free 3D concept before you commit.

Modular
9–18 sqm
From
AED 950 / sqm
Best for: first-time and value-focused exhibitors
  • Reusable system structure
  • Custom-printed graphics
  • LED lighting & furniture
  • Delivery, install & dismantle
  • Venue paperwork handled
Get a quote
Premium
50–100 sqm
From
AED 2,400 / sqm
Best for: large, high-impact stands with demo space
  • Everything in Custom, plus:
  • Large-scale custom build
  • Double-height feature elements
  • Full AV & feature lighting
  • Demo / hospitality area
  • Priority in-house build slot
Get a quote
Double-Decker / Pavilion
100+ sqm
From
AED 3,200 / sqm
Best for: flagship presence and country pavilions
  • Everything in Premium, plus:
  • Two-storey engineered build
  • VIP lounge & meeting rooms
  • Certified structural sign-off
  • Country-pavilion capable to 1,500 sqm
Get a quote

Not included: venue space rental (paid to the organiser), and venue electrical & rigging orders (we place these at the advance rate on your behalf and bill at cost). Bespoke add-ons are quoted line by line, so the number you sign is the number you pay.

Case Studies

Real briefs. Real results.

See how brands turn raw floor space into a working show presence — every project handed over to a documented client sign-off.

Explore all case studies →
Field Notes

Build notes for Dubai World Trade Centre

The detail that isn’t in the exhibitor manual — from the people who build here.

CD
Carlos Dalè
General Manager, SOL Dubai · oversees stand design and build to venue rules across Dubai, Abu Dhabi and Riyadh
01

Permit to Build gates everything — file the structural calcs early

At DWTC nothing gets built without a Permit to Build, and for any complex or double-deck stand that permit depends on structural calculations clearing the DWTC engineer. We submit on Organiser+ the week the design is signed off — a late structural file, not the build, is what most often delays a stand.

02

Mains power is DWTC’s to supply — order it, don’t wire it

All mains electrical comes from DWTC’s official contractor and is ordered in advance. We book power — including 24-hour supply where a stand needs it — at the advance rate so nothing is sitting dead on opening morning.

03

Finish in the workshop — Perspex won’t pass

Only fire-retardant materials are allowed and Perspex is specifically prohibited (we use Lexan or Macralon). We complete and inspect every finish at our workshop, so the on-site crew assembles an approved build instead of fabricating in the hall.

04

Lock the slot early

DWTC’s calendar is packed, so build-up slots, rigging and power book out and late orders cost more. We secure your space-only window and order services at the advance rate.

Common mistakes, in order of frequency

  1. An oversized logo on the back wall that crowds out the one-line proposition a buyer reads in three seconds.
  2. The same graphic on the front and side panels of an inline stand — the aisle-facing side panel is your most wasted surface.
  3. A counter or sign at the very front that blocks the sightline into the stand and stops buyers stepping in.
  4. Under-ordering power — no 24-hour supply for fridges, screens or live demos, so the stand isn’t ready on opening morning.
  5. Leaving structural, rigging and electrical orders until after the venue deadlines and paying avoidable surcharges.
FAQ

Big 5 Global 2026 stand questions, answered

Real answers with real numbers — including the venue’s build rules. Click any question to expand.

When and where is Big 5 Global 2026?
Big 5 Global 2026 takes place from 23 to 26 November 2026 at the Dubai World Trade Centre (DWTC), organised by dmg events. Opening hours are 11am–6pm on Monday 23 November, 10am–6pm on 24 and 25 November, and 10am–5pm on Thursday 26 November.
How big is Big 5 Global?
The 2025 edition had 2,866 exhibitors and 85,093 attendees from 169 countries, with 70 exhibiting countries and 24 country pavilions. It is the largest construction event in the Middle East.
Which shows run alongside Big 5 Global?
The same week at DWTC includes HVACR World, Heavy, Totally Concrete, Marble & Stone World, Urban Design & Landscape, GeoWorld and Future FM. We can build stands in any of these halls and coordinate several stands for one company as a single project.
How much does a Big 5 Global stand cost?
A full-service Big 5 Global stand starts from AED 950/sqm for a modular build, AED 1,650/sqm for a bespoke custom stand, AED 2,400/sqm for large premium builds and AED 3,200/sqm for double-decker and pavilion builds. Prices are approximate starting points; every quote is fixed and itemised with a free 3D concept.
Can you display heavy products such as stone, tiles or machinery?
Yes. We size the wall framing for the weight of your samples, fix every piece mechanically, and check floor-loading limits for heavy items and machinery. Walk-on flooring and decking can be laid as a working floor over a raised platform.
How far ahead should we book a stand for Big 5 Global?
We recommend starting 8–14 weeks before the show for a custom stand, and earlier for a double-decker or pavilion, because the venue’s structural approval and permits come first. A modular stand with custom graphics needs less lead time. Send us your hall and stand size and we will set out a timeline that fits your dates.
How tall can my Big 5 Global stand be, and do I need structural approval?
Standard custom builds work to around 4m. Taller builds and complex structures — double-deckers, long spans, or stands where the travel distance to an exit exceeds 10m — need structural-engineer clearance through DWTC’s Organiser+ portal before your Permit to Build is released. We prepare and submit the full package in-house.
Who handles the Dubai World Trade Centre permits and approvals?
We do, start to finish. Every stand at DWTC needs a Stand Permit to Build, and complex or double-deck stands need structural calculations cleared by the DWTC engineer first. We prepare the drawings, submit them and manage the approval.
Can I get power, water or drainage for a live demonstration?
Mains power at DWTC is supplied by the venue’s official electrical contractor and ordered in advance, and any water or drainage for demonstrations is also ordered through the venue. We design what your stand needs and place the orders at the advance rate.
Do you build double-decker stands at Big 5 Global?
Yes. A two-storey stand adds an upstairs meeting or hospitality floor above an open product area. It needs certified structural calculations, a displayed maximum-occupancy figure and code-compliant staircases. We engineer, certify and build it in-house.
Can you build stands for several of our brands in different halls?
Yes. Many groups exhibit at Big 5 and one or more co-located shows. We design them as one family of stands, run the approvals and logistics together, and give you one project manager for all of them.
What’s included in a full-service Big 5 Global stand?
Custom 3D design, in-house fabrication and pre-build, full graphics, delivery to Dubai World Trade Centre, install and dismantle, the DWTC Permit to Build and H&S paperwork, electrical and rigging ordered on your behalf, and a dedicated project manager. Venue space rental is paid to the organiser and is not included.
Do you provide on-site support during Big 5 Global?
Yes. Our team is on call across all four show days for anything from a graphic touch-up to an electrical fix, and larger stands get a dedicated on-site project lead.
What happens to the stand and samples after the show?
We dismantle and clear the space, return your samples or hand them to your logistics agent, and can store reusable stand elements for your next edition so you are not paying to rebuild from scratch.
More Shows

More construction & build shows we build for

Other shows our in-house team designs and builds for, with the same full-service service and full venue handling.

See the full show calendar

Get your Big 5 Global 2026 stand quote in 48 hours

Custom 3D rendering and all-inclusive pricing, designed to Dubai World Trade Centre’s rules with structural sign-off built into the timeline. We build in-house and install on site — the stand you approve in the rendering is the stand that opens.

Request a free quote
Live now