Skip to content
Home › Shows › Logistics › Breakbulk Middle East 2027
Dubai · DWTCLogistics

Breakbulk Middle East 2027 Exhibition Stand Design & Build (DWTC)

Full-service custom stands for Breakbulk Middle East 2027 at Dubai World Trade Centre — design, in-house build, the DWTC Permit to Build and H&S paperwork, install and on-stand support. Built for forwarders, ports and carriers meeting shippers and project owners.

Custom exhibition stand designed and built by SOL Dubai at Dubai World Trade Centre
★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★2–3 Feb 2027Next edition★LogisticsAudience★2 daysDuration★48 hoursQuote turnaround★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★2–3 Feb 2027Next edition★LogisticsAudience★2 daysDuration★48 hoursQuote turnaround

Breakbulk Middle East 2027 at a glance

Breakbulk Middle East is the region’s event for project cargo and breakbulk logistics, organised by Breakbulk Events & Media, part of Hyve Group. The 2027 edition runs for two days, 2–3 February 2027, at the Dubai World Trade Centre (DWTC), from 10am to 6pm on 2 February and 10am to 5pm on 3 February. Its theme is “Connecting the Middle East’s New Era of Project Opportunity”.

The show uses Halls 5, 6, 7 and 8 and the Pavilion, and for 2027 it expands into Hall 4, making it 21% larger. On its 2027 pages the organiser cites 250+ exhibitors and expects 13,000+ industry professionals from 125+ countries. Alongside the floor there is a conference programme, an Education Day, a Women in Breakbulk session and the Global Shipper Programme.

DWTC is our home venue, and our workshop in Al Quoz is a short drive from the halls. That matters on a two-day show, where build-up and breakdown are short and every hour on site counts. MRO Middle East and Aircraft Interiors Middle East are also scheduled at DWTC on the same dates, so the venue will be busy during build-up.

Who you are building for

Breakbulk Middle East brings cargo owners together with the companies that move their cargo. On one side are shippers, engineering, procurement and construction (EPC) contractors, energy companies, project owners and industrial manufacturers. On the other are freight forwarders, ports and terminals, carriers, heavy-lift and oversize transporters, rail operators and equipment and service providers. The show covers project cargo, breakbulk shipping, heavy-lift transport, forwarding, ports, rail, marine, offshore and subsea, and military and defence logistics.

The Global Shipper Programme brings cargo owners to the floor specifically to meet service providers, so many exhibitors arrive with meetings already booked. The stand has to support that: a place to host shippers properly, not just a counter to hand out brochures.

What a Breakbulk stand has to do

Almost everything sold at Breakbulk is a service, and the service is moving something very large, very heavy or very valuable from one place to another without problems. The stand has to make that capability visible quickly. Fleet, cranes, port berths, routes and past projects are the evidence buyers want. Large-format images of real lifts and moves, a map of your network, a screen running project films and scale models of vessels or equipment do that job better than general logistics imagery.

The second job is the meeting. Project cargo deals are complex, involve engineering and risk, and are usually discussed in detail. A stand needs comfortable seating, at least one closed or semi-closed meeting space and a screen for going through a project. A clear reception point near the aisle lets one person greet booked guests and qualify walk-ins while colleagues hold meetings further in.

Messaging matters as well. With hundreds of forwarders, ports and carriers in the same halls, many offering similar services, buyers need a reason to stop at yours. One clear statement, readable from the aisle, of what you move, where and what makes you different, such as a route, a specialist fleet or a port facility, works better than a long list of services. We help shape that message at the brief stage so the design is built around it.

Our Breakbulk stand build process

Every Dubai project runs through our eight-stage process, handled in-house from brief to dismantle:

  1. Discovery and brief — we agree your key message, the models, screens and displays you will use, your meeting schedule and budget, and confirm hall, stand number and dimensions at DWTC.
  2. Concept and 3D design — visuals and a floor plan that put your capability on show from the aisle and give meetings room behind.
  3. Costing and approval — a fixed, itemised quote covering structure, meeting rooms, AV, power and logistics.
  4. Venue approvals and technical drawings — structural, electrical and rigging submissions prepared for DWTC.
  5. Fabrication — walls, meeting rooms, model plinths, joinery and graphics built and checked in our own workshop.
  6. Pre-build and QA — trial assembly so fixings, screens, cases and graphics are proven before build-up.
  7. On-site installation — supervised build at DWTC within the official build-up window, handed over show-ready.
  8. Show-day support and dismantling — a standby team on call across both days, then fast, careful dismantling.

Hosting meetings and hospitality

On a two-day show with a shipper programme, meeting space is the most valuable part of the stand. We build meeting rooms with doors and good acoustic separation, an open lounge for shorter conversations and a coffee point so you can host guests without leaving the stand. A small storage room keeps literature, give-aways and personal items out of sight.

Ports, carriers and large forwarders often choose a double-decker stand, with meeting rooms or a hospitality deck upstairs and an open display floor below. At DWTC a two-storey stand needs certified structural calculations, a displayed maximum-occupancy figure and code-compliant staircases, and the structural file must clear the DWTC engineer before the Permit to Build is released. We prepare and submit all of it in-house.

Models, screens and showing scale

Scale models of ships, cranes, trailers and terminals are a fixture at Breakbulk, and they deserve a proper setting. We build plinths and clear cases sized to each model, with lighting that shows detail and a viewing height that lets visitors look along a vessel rather than down on it. Large LED walls work well for project films and route maps; they need structure, power and, where hung from the hall, rigging approval. Mains power at DWTC is supplied by the venue’s official electrical contractor, and banners and suspended elements are subject to DWTC approval and load limits, so we order both in advance.

Port authorities and free zones often exhibit with partner companies on one stand. A shared stand needs a clear main identity, individual desks or pods for each partner and a common meeting area. We build these as one project with one set of approvals, and we can treat the largest of them as a pavilion.

Booking lead times

For a custom stand at DWTC we recommend starting 8–14 weeks before the show, and earlier for a double-decker or a large pavilion, because the venue’s technical approval and permits come before any building starts. A modular stand with custom graphics needs less lead time. Send us your hall, stand size and show dates and we will set out a build timeline that fits them.

The steps are the same for every show. We agree the brief and budget, then send 3D concepts and a costed quote. Once the design is approved we prepare the structural drawings and submit them to the organiser and DWTC for approval. Fabrication runs in our workshop alongside that approval, so the stand is built and checked before move-in. On site we handle the build, power and furniture, stay on call through the open days, and take everything down and clear the space at the end.

Stand options and pricing

We build every format at this show. Modular stands, from AED 950 per square metre, suit smaller forwarders and first-time exhibitors who need clean branding, a reception point and a meeting area. Custom stands, from AED 1,650 per square metre, give you a bespoke layout with meeting rooms, models and screens. Premium builds start from AED 2,400 and double-decker and pavilion builds from AED 3,200.

The final figure depends on stand size, the number of meeting rooms, AV, models and branding. Every quote is fixed and itemised, so the price you approve is the price you pay.

Why logistics companies choose SOL Dubai

We are a Dubai-based stand builder with our own workshop in Al Quoz, and DWTC is the venue we work in most. We handle Breakbulk stands from start to finish: design, fabrication, venue approvals, power and rigging orders, on-site installation and dismantling. Meeting-led stands, double-deckers and shared partner stands are work our in-house team does every season.

Clients get workshop-built quality, one accountable team and a price that holds from quote to final invoice. If you also exhibit at Saudi Warehousing & Logistics Expo in Riyadh, we can carry your stand design across both shows.

Building at Dubai World Trade Centre: the rules that shape your Breakbulk Middle East 2027 stand

Breakbulk Middle East 2027 is governed by the Dubai World Trade Centre’s own technical regulations. Get them right and your stand goes up cleanly; miss a submission and you lose build time, not just money. We design to all of this from the first sketch and file the paperwork for you.

Permit to Build

Every stand needs a DWTC Stand Permit to Build (PTB) before construction. We prepare and submit it so your build is cleared to start on day one of build-up.

Height & “complex” structures

Standard custom builds work to around 4m. Taller builds and anything DWTC classes as complex — double-deckers, long spans, or stands where the travel distance to an exit exceeds 10m — trigger structural-engineer clearance through DWTC’s Organiser+ portal before the Permit to Build is released, and the engineer can halt an unsafe build on site.

Double-deckers

A two-storey stand needs certified structural calculations, a Double-Deck health-and-safety declaration, a displayed maximum-occupancy figure and code-compliant staircases — at least 1m wide with handrails, and a second staircase once an upper deck passes ~200 sqm or sits over 25m from the stairs.

Electrical power

All mains power is supplied by DWTC’s official Electrical Contractor and ordered in advance — you can’t self-wire mains. We design the scheme and order it, including 24-hour power where your stand needs it.

Rigging & suspended elements

Banners and lighting rigs hung from the hall are subject to DWTC approval and load limits and ordered ahead of tenancy. We prepare and file the rigging submission on time.

Fixings & fire-safe materials

Nothing may be fixed to the floors, walls, ceilings or structural steel, and all materials must be fire-retardant — Perspex is prohibited (Lexan and Macralon are accepted). We complete and inspect finishes in our workshop, so the on-site crew assembles an approved build.

Accreditation & deadlines

Every contractor needs a DWTC Contractor+ digital badge and PPE is mandatory. Structural, rigging and electrical submissions run weeks ahead of build-up, and late orders attract surcharges — we manage the badges and the deadlines.

Recent Builds

Recent builds from our workshop

Real stands designed and built by our in-house team. Every stand is pre-built and inspected before it ships to Dubai World Trade Centre.

SOL Dubai custom stand, built in our Dubai workshop
Custom stand · SOL Dubai
SOL Dubai island stand, built in our Dubai workshop
Island stand · SOL Dubai
SOL Dubai double-decker, built in our Dubai workshop
Double-decker · SOL Dubai
SOL Dubai feature-lit, built in our Dubai workshop
Feature-lit · SOL Dubai
SOL Dubai bespoke build, built in our Dubai workshop
Bespoke build · SOL Dubai
SOL Dubai country pavilion, built in our Dubai workshop
Country pavilion · SOL Dubai
View our full portfolio
Transparent Pricing

Breakbulk Middle East 2027 stand pricing — all-inclusive

One quote covers design, in-house build, graphics, delivery, install, dismantle and venue paperwork — fixed and itemised, with a free 3D concept before you commit.

Modular
9–18 sqm
From
AED 950 / sqm
Best for: first-time and value-focused exhibitors
  • Reusable system structure
  • Custom-printed graphics
  • LED lighting & furniture
  • Delivery, install & dismantle
  • Venue paperwork handled
Get a quote
Premium
50–100 sqm
From
AED 2,400 / sqm
Best for: large, high-impact stands with demo space
  • Everything in Custom, plus:
  • Large-scale custom build
  • Double-height feature elements
  • Full AV & feature lighting
  • Demo / hospitality area
  • Priority in-house build slot
Get a quote
Double-Decker / Pavilion
100+ sqm
From
AED 3,200 / sqm
Best for: flagship presence and country pavilions
  • Everything in Premium, plus:
  • Two-storey engineered build
  • VIP lounge & meeting rooms
  • Certified structural sign-off
  • Country-pavilion capable to 1,500 sqm
Get a quote

Not included: venue space rental (paid to the organiser), and venue electrical & rigging orders (we place these at the advance rate on your behalf and bill at cost). Bespoke add-ons are quoted line by line, so the number you sign is the number you pay.

Case Studies

Real briefs. Real results.

See how brands turn raw floor space into a working show presence — every project handed over to a documented client sign-off.

Explore all case studies →
Field Notes

Build notes for Dubai World Trade Centre

The detail that isn’t in the exhibitor manual — from the people who build here.

CD
Carlos Dalè
General Manager, SOL Dubai · oversees stand design and build to venue rules across Dubai, Abu Dhabi and Riyadh
01

Permit to Build gates everything — file the structural calcs early

At DWTC nothing gets built without a Permit to Build, and for any complex or double-deck stand that permit depends on structural calculations clearing the DWTC engineer. We submit on Organiser+ the week the design is signed off — a late structural file, not the build, is what most often delays a stand.

02

Mains power is DWTC’s to supply — order it, don’t wire it

All mains electrical comes from DWTC’s official contractor and is ordered in advance. We book power — including 24-hour supply where a stand needs it — at the advance rate so nothing is sitting dead on opening morning.

03

Finish in the workshop — Perspex won’t pass

Only fire-retardant materials are allowed and Perspex is specifically prohibited (we use Lexan or Macralon). We complete and inspect every finish at our workshop, so the on-site crew assembles an approved build instead of fabricating in the hall.

04

Lock the slot early

DWTC’s calendar is packed, so build-up slots, rigging and power book out and late orders cost more. We secure your space-only window and order services at the advance rate.

Common mistakes, in order of frequency

  1. An oversized logo on the back wall that crowds out the one-line proposition a buyer reads in three seconds.
  2. The same graphic on the front and side panels of an inline stand — the aisle-facing side panel is your most wasted surface.
  3. A counter or sign at the very front that blocks the sightline into the stand and stops buyers stepping in.
  4. Under-ordering power — no 24-hour supply for fridges, screens or live demos, so the stand isn’t ready on opening morning.
  5. Leaving structural, rigging and electrical orders until after the venue deadlines and paying avoidable surcharges.
FAQ

Breakbulk Middle East 2027 stand questions, answered

Real answers with real numbers — including the venue’s build rules. Click any question to expand.

When and where is Breakbulk Middle East 2027?
Breakbulk Middle East 2027 takes place on 2 and 3 February 2027 at the Dubai World Trade Centre (DWTC), in Halls 5–8 and the Pavilion, expanding into Hall 4. Hours are 10am–6pm on 2 February and 10am–5pm on 3 February. It is organised by Breakbulk Events & Media, part of Hyve Group.
How much does a Breakbulk Middle East stand cost?
A full-service stand starts from about AED 950/sqm for a modular build, AED 1,650/sqm for a custom stand, AED 2,400/sqm for large premium builds and AED 3,200/sqm for double-decker and pavilion builds. These are approximate starting points; every quote is fixed and itemised, with a free 3D concept.
How far ahead should we book a stand for Breakbulk Middle East?
We recommend starting 8–14 weeks before the show for a custom stand, and earlier for a double-decker or pavilion, because the venue’s structural approval and permits come first. A modular stand with custom graphics needs less lead time. Send us your hall and stand size and we will set out a timeline that fits your dates.
Who handles the Dubai World Trade Centre permits and approvals?
We do. Every stand at DWTC needs a Stand Permit to Build, and complex or double-deck stands need structural calculations cleared by the DWTC engineer through the Organiser+ portal first. We prepare the drawings, submit them and manage the approval.
Can I get power for LED walls and screens?
Yes. Mains power at DWTC is supplied by the venue’s official electrical contractor and ordered in advance. We design the electrical plan, including any LED walls, and place the order at the advance rate.
Do you build double-decker stands at Breakbulk Middle East?
Yes. A two-storey stand puts meeting rooms or a hospitality deck upstairs above an open display floor. It needs certified structural calculations, a displayed maximum-occupancy figure and code-compliant staircases. We engineer, certify and build it in-house.
What’s included in a full-service Breakbulk stand?
Custom 3D design, in-house fabrication and pre-build, full graphics, delivery to Dubai World Trade Centre, install and dismantle, the DWTC Permit to Build and H&S paperwork, electrical and rigging ordered on your behalf, and a dedicated project manager. Venue space rental is paid to the organiser and is not included.
Do you provide on-site support during the show?
Yes. Our team is on call across both show days for anything from a graphic touch-up to an electrical fault, and larger stands get a dedicated on-site project lead.
What happens to the stand after the show?
We dismantle and clear the space, return your models and display items or hand them to your logistics agent, and can store reusable stand elements for your next edition.
How big is Breakbulk Middle East?
On its 2027 pages the organiser cites 250+ exhibitors and expects 13,000+ industry professionals from 125+ countries. The 2027 show expands into Hall 4 and is 21% larger.
Who visits Breakbulk Middle East?
Shippers, EPC contractors, energy companies, project owners and industrial manufacturers, alongside freight forwarders, ports, carriers, transporters and equipment and service providers. The Global Shipper Programme brings cargo owners to meet exhibitors.
Can you display scale models of vessels and equipment?
Yes. We build plinths and clear cases sized to each model, with lighting and viewing heights planned so visitors see the detail.
Can a port or free zone share a stand with partner companies?
Yes. We build shared stands with one main identity, individual desks or pods for each partner and a common meeting area, managed as one project.
Which other shows run at DWTC on the same dates?
MRO Middle East and Aircraft Interiors Middle East are also scheduled at DWTC on 2–3 February 2027. If your group exhibits at both, we can run the stands as one project.
More Shows

More logistics shows we build for

Other shows our in-house team designs and builds for, with the same full-service service and full venue handling.

See the full show calendar

Get your Breakbulk Middle East 2027 stand quote in 48 hours

Custom 3D rendering and all-inclusive pricing, designed to Dubai World Trade Centre’s rules with structural sign-off built into the timeline. We build in-house and install on site — the stand you approve in the rendering is the stand that opens.

Request a free quote
Live now