Skip to content
Home › Shows › Technology › Dubai AI Festival 2027
Dubai · DWTCTechnology

Dubai AI Festival 2027 Exhibition Stand Design & Build (DWTC)

Full-service stands for Dubai AI Festival 2027 at Dubai World Trade Centre — design, in-house build, the DWTC Permit to Build and H&S paperwork, install and on-stand support. Built for AI companies that need to show a working product and get in front of investors fast.

Custom exhibition stand designed and built by SOL Dubai at Dubai World Trade Centre
★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★2027 — dates TBCNext edition★TechnologyAudience★2 days (2026)Duration★48 hoursQuote turnaround★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★2027 — dates TBCNext edition★TechnologyAudience★2 days (2026)Duration★48 hoursQuote turnaround

Dubai AI Festival 2027 at a glance

Dubai AI Festival is a two-day event on artificial intelligence, organised by Dubai AI Campus at the Dubai International Financial Centre (DIFC) in partnership with the Office of the UAE Minister of State for Artificial Intelligence, Digital Economy and Remote Work Applications. The third edition, first announced for April 2026 as part of Dubai AI Week, ran on 26–27 October 2026 at Dubai World Trade Centre (DWTC), after moving from Madinat Jumeirah to make room for more participants. The organisers have not yet announced dates for 2027, so this page will be updated as soon as they are confirmed.

The second edition in 2025 drew more than 10,000 visitors. For 2026, under the theme “Where Intelligence Meets Opportunity”, the organisers expected participants from more than 100 countries, over 150 speakers, around 500 investors and around 200 exhibitors, with names such as Amazon Web Services, Alibaba Cloud, Mistral AI, Mubadala, Snowflake and Dubai’s RTA taking part. Sessions covered AI governance, agentic AI, enterprise transformation, computing infrastructure, investment trends, ethics, AI literacy and the future of work, with applications in financial services, government, healthcare and industry.

The audience is a mix of policymakers, technology leaders, investors and founders. As a Dubai-based stand builder working at DWTC as our home venue, SOL Dubai knows these halls well.

A conference-led festival: what that means for exhibitors

Dubai AI Festival is led by its programme. The main draw is the stages, roundtables and workshops, and many visitors spend most of their time in sessions and investor meetings. The exhibition is real — around 200 exhibitors were expected in 2026 — but it is smaller than a large technology trade show, and stands tend to be smaller too. A typical mix is sponsor booths for cloud, model and infrastructure companies, a few larger partner spaces, government and DIFC-linked showcases, and a startup area; a third-party event listing put the 2026 startup pods at 4 sqm.

That is good news for budgets, but it raises the bar for design. On a small footprint every square metre has to work: a live demo, a clear one-line claim and somewhere to talk. If you are planning a large presence with deep product zones and big hospitality areas, a show such as GITEX GLOBAL is built for that. At Dubai AI Festival, a compact, well-made stand next to the right stage often does more.

What an AI stand has to do

AI is hard to show on a wall. Visitors at this festival have heard every claim already, so the stand has to prove something in under a minute. The most effective stands run a live demo on a large screen at aisle height — a model answering real questions, an agent completing a task, a dashboard on real data — with a member of the team ready to explain what is happening. A single clear line above it says what the product does and for whom.

The second job is the follow-up conversation. Investors want traction figures and a short pitch; enterprise and government buyers want to know about deployment, data handling and cost. That means at least one seated meeting point, even on a small stand, and a fast way to capture contacts, such as a QR code or a tablet linked to your CRM. Because sessions end in waves, the stand should be able to handle a sudden crowd and then a quiet half-hour of meetings.

Our Dubai AI Festival stand build process

Every Dubai project runs through our eight-stage process, handled start to finish in-house:

  1. Discovery and brief — we agree what you will demo, the screens and computing hardware you need, your meeting goals and budget, and confirm the stand number and dimensions at DWTC once the 2027 floor plan is out.
  2. Concept and 3D design — visuals and a floor plan built around a live demo point, a clear brand statement and a meeting space.
  3. Costing and approval — a fixed, fully itemised quotation covering structure, screens, power, data cabling, furniture and logistics.
  4. Venue approvals and technical drawings — structural and electrical submissions prepared for DWTC approval.
  5. Fabrication — walls, demo counters, joinery and graphics built and quality-checked in our own workshop.
  6. Pre-build and QA — trial assembly with your screens and hardware mounted, so cable routes, ventilation and finishes are proven before build-up.
  7. On-site installation — supervised build at DWTC during the official build-up window, which is short for a two-day event.
  8. Show-day support and dismantling — standby team on call, then dismantling and storage of reusable elements for your next event.

Screens, power and connectivity for live demos

A demo that fails on the first morning costs more than the stand. We plan the technical side early: screen sizes and mounting heights so a demo can be read from the aisle, hidden cable routes, lockable and ventilated cabinets for laptops or small servers, and enough sockets for every device the team will bring. Mains power at DWTC is supplied by the venue’s official electrical contractor and ordered in advance, and we place the order at the advance rate with a margin for extra kit.

We also recommend a backup for the network. Hall Wi-Fi can slow down when thousands of people are connected, so we plan for a wired internet line ordered through the venue, and suggest a recorded version of the demo that can run if the live connection drops. Lighting is set so screens stay readable — no strong lights pointing straight at the display — and the counter is deep enough for a laptop and a keyboard.

Small stands that still stand out

On a compact footprint the design has to be disciplined. We use one strong colour field and a large, simple brand line rather than many small messages, keep the floor open so two or three people can gather at the screen, and build a slim back wall with storage behind it for bags, giveaways and spare hardware. Fabric light boxes give a bright, even surface that photographs well, which matters at an event where many visitors post from the floor.

For startups, a pod can be upgraded with a branded fascia, a better counter and a mounted screen without changing the footprint. For sponsors and partners with larger spaces, we add a semi-private meeting area or a small presentation corner where your team can run short talks between sessions. In both cases the stand is designed to be reused at other technology events in the region.

Booking lead times

For a custom stand at DWTC we recommend starting 8–14 weeks before the show, and earlier for a double-decker or a large pavilion, because the venue’s technical approval and permits come before any building starts. A modular stand with custom graphics needs less lead time. Send us your hall, stand size and show dates and we will set out a build timeline that fits them.

The steps are the same for every show. We agree the brief and budget, then send 3D concepts and a costed quote. Once the design is approved we prepare the structural drawings and submit them to the organiser and DWTC for approval. Fabrication runs in our workshop alongside that approval, so the stand is built and checked before move-in. On site we handle the build, power and furniture, stay on call through the open days, and take everything down and clear the space at the end.

Stand options and pricing

We build every format the festival uses: upgraded startup pods, modular stands that can be reused across the tech calendar, custom sponsor booths with demo walls and meeting space, and premium partner builds. Double-decker stands are possible but rarely needed at an event of this size.

Indicative starting prices are from AED 950/sqm for modular, from AED 1,650/sqm for custom, from AED 2,400/sqm for premium builds and from AED 3,200/sqm for double-decker and pavilion builds. The final figure depends on size, structure, screens, furniture and branding. Every quotation is fixed and itemised, so the price you approve is the price you pay.

Why technology companies choose SOL Dubai

We are a Dubai-based exhibition stand builder with our own workshop in Al Quoz, working at DWTC as our home venue. We handle Dubai AI Festival stands start to finish: design, fabrication, the venue approvals, screen and hardware mounting and on-site installation, with storage between events.

Clients get workshop-built quality, a single accountable team and a price that holds from quotation to final invoice.

Building at Dubai World Trade Centre: the rules that shape your Dubai AI Festival 2027 stand

Dubai AI Festival 2027 is governed by the Dubai World Trade Centre’s own technical regulations. Get them right and your stand goes up cleanly; miss a submission and you lose build time, not just money. We design to all of this from the first sketch and file the paperwork for you.

Permit to Build

Every stand needs a DWTC Stand Permit to Build (PTB) before construction. We prepare and submit it so your build is cleared to start on day one of build-up.

Height & “complex” structures

Standard custom builds work to around 4m. Taller builds and anything DWTC classes as complex — double-deckers, long spans, or stands where the travel distance to an exit exceeds 10m — trigger structural-engineer clearance through DWTC’s Organiser+ portal before the Permit to Build is released, and the engineer can halt an unsafe build on site.

Double-deckers

A two-storey stand needs certified structural calculations, a Double-Deck health-and-safety declaration, a displayed maximum-occupancy figure and code-compliant staircases — at least 1m wide with handrails, and a second staircase once an upper deck passes ~200 sqm or sits over 25m from the stairs.

Electrical power

All mains power is supplied by DWTC’s official Electrical Contractor and ordered in advance — you can’t self-wire mains. We design the scheme and order it, including 24-hour power where your stand needs it.

Rigging & suspended elements

Banners and lighting rigs hung from the hall are subject to DWTC approval and load limits and ordered ahead of tenancy. We prepare and file the rigging submission on time.

Fixings & fire-safe materials

Nothing may be fixed to the floors, walls, ceilings or structural steel, and all materials must be fire-retardant — Perspex is prohibited (Lexan and Macralon are accepted). We complete and inspect finishes in our workshop, so the on-site crew assembles an approved build.

Accreditation & deadlines

Every contractor needs a DWTC Contractor+ digital badge and PPE is mandatory. Structural, rigging and electrical submissions run weeks ahead of build-up, and late orders attract surcharges — we manage the badges and the deadlines.

Recent Builds

Recent builds from our workshop

Real stands designed and built by our in-house team. Every stand is pre-built and inspected before it ships to Dubai World Trade Centre.

SOL Dubai custom stand, built in our Dubai workshop
Custom stand · SOL Dubai
SOL Dubai island stand, built in our Dubai workshop
Island stand · SOL Dubai
SOL Dubai double-decker, built in our Dubai workshop
Double-decker · SOL Dubai
SOL Dubai feature-lit, built in our Dubai workshop
Feature-lit · SOL Dubai
SOL Dubai bespoke build, built in our Dubai workshop
Bespoke build · SOL Dubai
SOL Dubai country pavilion, built in our Dubai workshop
Country pavilion · SOL Dubai
View our full portfolio
Transparent Pricing

Dubai AI Festival 2027 stand pricing — all-inclusive

One quote covers design, in-house build, graphics, delivery, install, dismantle and venue paperwork — fixed and itemised, with a free 3D concept before you commit.

Modular
9–18 sqm
From
AED 950 / sqm
Best for: first-time and value-focused exhibitors
  • Reusable system structure
  • Custom-printed graphics
  • LED lighting & furniture
  • Delivery, install & dismantle
  • Venue paperwork handled
Get a quote
Premium
50–100 sqm
From
AED 2,400 / sqm
Best for: large, high-impact stands with demo space
  • Everything in Custom, plus:
  • Large-scale custom build
  • Double-height feature elements
  • Full AV & feature lighting
  • Demo / hospitality area
  • Priority in-house build slot
Get a quote
Double-Decker / Pavilion
100+ sqm
From
AED 3,200 / sqm
Best for: flagship presence and country pavilions
  • Everything in Premium, plus:
  • Two-storey engineered build
  • VIP lounge & meeting rooms
  • Certified structural sign-off
  • Country-pavilion capable to 1,500 sqm
Get a quote

Not included: venue space rental (paid to the organiser), and venue electrical & rigging orders (we place these at the advance rate on your behalf and bill at cost). Bespoke add-ons are quoted line by line, so the number you sign is the number you pay.

Case Studies

Real briefs. Real results.

See how brands turn raw floor space into a working show presence — every project handed over to a documented client sign-off.

Explore all case studies →
Field Notes

Build notes for Dubai World Trade Centre

The detail that isn’t in the exhibitor manual — from the people who build here.

CD
Carlos Dalè
General Manager, SOL Dubai · oversees stand design and build to venue rules across Dubai, Abu Dhabi and Riyadh
01

Permit to Build gates everything — file the structural calcs early

At DWTC nothing gets built without a Permit to Build, and for any complex or double-deck stand that permit depends on structural calculations clearing the DWTC engineer. We submit on Organiser+ the week the design is signed off — a late structural file, not the build, is what most often delays a stand.

02

Mains power is DWTC’s to supply — order it, don’t wire it

All mains electrical comes from DWTC’s official contractor and is ordered in advance. We book power — including 24-hour supply where a stand needs it — at the advance rate so nothing is sitting dead on opening morning.

03

Finish in the workshop — Perspex won’t pass

Only fire-retardant materials are allowed and Perspex is specifically prohibited (we use Lexan or Macralon). We complete and inspect every finish at our workshop, so the on-site crew assembles an approved build instead of fabricating in the hall.

04

Lock the slot early

DWTC’s calendar is packed, so build-up slots, rigging and power book out and late orders cost more. We secure your space-only window and order services at the advance rate.

Common mistakes, in order of frequency

  1. An oversized logo on the back wall that crowds out the one-line proposition a buyer reads in three seconds.
  2. The same graphic on the front and side panels of an inline stand — the aisle-facing side panel is your most wasted surface.
  3. A counter or sign at the very front that blocks the sightline into the stand and stops buyers stepping in.
  4. Under-ordering power — no 24-hour supply for fridges, screens or live demos, so the stand isn’t ready on opening morning.
  5. Leaving structural, rigging and electrical orders until after the venue deadlines and paying avoidable surcharges.
FAQ

Dubai AI Festival 2027 stand questions, answered

Real answers with real numbers — including the venue’s build rules. Click any question to expand.

When and where is Dubai AI Festival 2027?
The organisers have not yet announced the 2027 dates. The third edition ran on 26–27 October 2026 at Dubai World Trade Centre, organised by Dubai AI Campus at DIFC. We will update this page when the 2027 dates are confirmed.
How big is Dubai AI Festival?
The 2025 edition drew more than 10,000 visitors. For 2026 the organisers expected participants from more than 100 countries, over 150 speakers, around 500 investors and around 200 exhibitors.
Is Dubai AI Festival mainly a conference or an exhibition?
It is conference-led, with stages, roundtables and workshops at its core and an exhibition alongside. Stands are generally smaller than at large technology trade shows, with sponsor booths, partner spaces and a startup area.
Who attends Dubai AI Festival?
Policymakers, technology leaders, investors and founders, with sessions covering AI governance, agentic AI, enterprise transformation, computing infrastructure, investment and the future of work.
How much does a Dubai AI Festival stand cost?
A full-service Dubai AI Festival stand starts from AED 950/sqm for a modular build, AED 1,650/sqm for a bespoke custom stand, AED 2,400/sqm for large premium builds and AED 3,200/sqm for double-decker and pavilion builds. Prices are approximate starting points; every quote is fixed and itemised with a free 3D concept.
How far ahead should we book a stand for Dubai AI Festival?
We recommend starting 8–14 weeks before the show for a custom stand, and earlier for a double-decker or pavilion, because the venue’s structural approval and permits come first. A modular stand with custom graphics needs less lead time. Send us your hall and stand size and we will set out a timeline that fits your dates.
Can you upgrade a startup pod?
Yes. Within the pod footprint we can add a branded fascia, a better counter, a mounted screen and storage, so a small space looks finished and works for demos.
How do you make a live AI demo reliable on the stand?
We plan screen sizes and heights, hidden cabling, ventilated cabinets for hardware, enough sockets, and a wired internet line ordered through the venue, and we recommend a recorded backup of the demo in case the connection drops.
Can you build a meeting area for investor conversations?
Yes. Even on a small stand we can fit a seated meeting point, and on larger spaces a semi-private meeting area with a screen for short pitches.
Who handles the Dubai World Trade Centre permits and approvals?
We do, start to finish. Every stand at DWTC needs a Stand Permit to Build, and complex structures need structural calculations cleared by the DWTC engineer first. We prepare the drawings, submit them and manage the approval.
How is power arranged for screens and computers?
Mains power at DWTC is supplied by the venue’s official electrical contractor and ordered in advance. We design what your stand needs, add a margin for extra devices and place the orders at the advance rate.
Do you build double-decker stands at Dubai AI Festival?
We can, but few stands at an event of this size need one. A two-storey stand needs certified structural calculations, a displayed maximum-occupancy figure and code-compliant staircases, and we engineer and build it in-house when a partner has the space.
What’s included in a full-service Dubai AI Festival stand?
Custom 3D design, in-house fabrication and pre-build, full graphics, delivery to Dubai World Trade Centre, install and dismantle, the DWTC Permit to Build and H&S paperwork, electrical and internet ordered on your behalf, and a dedicated project manager. Space or sponsorship fees are paid to the organiser and are not included. Our team is on call across both show days for any fixes.
What happens to the stand after the show?
We dismantle and clear the space, return your hardware, and can store reusable stand elements in our Al Quoz workshop for your next technology event, so you are not paying to rebuild from scratch.
More Shows

More technology shows we build for

Other shows our in-house team designs and builds for, with the same full-service service and full venue handling.

See the full show calendar

Get your Dubai AI Festival 2027 stand quote in 48 hours

Custom 3D rendering and all-inclusive pricing, designed to Dubai World Trade Centre’s rules with structural sign-off built into the timeline. We build in-house and install on site — the stand you approve in the rendering is the stand that opens.

Request a free quote
Live now