Skip to content
Home › Shows › Construction & Industrial › Dubai WoodShow 2027
Dubai · DWTCConstruction & Industrial

Dubai WoodShow 2027 Exhibition Stand Design & Build (DWTC)

Full-service custom stands for Dubai WoodShow 2027 at Dubai World Trade Centre — design, in-house build, the DWTC Permit to Build and H&S paperwork, install and on-stand support. Built for timber, panel and machinery brands selling to furniture makers and fit-out firms.

Custom exhibition stand designed and built by SOL Dubai at Dubai World Trade Centre
★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★6–8 Apr 2027Next edition★Construction & IndustrialAudience★3 daysDuration★48 hoursQuote turnaround★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★6–8 Apr 2027Next edition★Construction & IndustrialAudience★3 daysDuration★48 hoursQuote turnaround

Dubai WoodShow 2027 at a glance

Dubai WoodShow (the Dubai International Wood & Wood Machinery Show) describes itself as the Middle East and North Africa’s only dedicated business-to-business exhibition for wood and woodworking machinery. It was established in 2005 and returns to the Dubai World Trade Centre (DWTC) for its 23rd edition from 6 to 8 April 2027.

The show covers more than 200 product categories, from raw timber and panels through woodworking machinery and tools to finishes, surface coatings, furniture fittings and interior solutions. It is organised with country pavilions, live machinery demonstrations and a conference programme of more than 40 sessions on market outlooks, technology and sustainable practice. IFAC Dubai runs alongside it.

The 2026 edition was moved from April to June, and on its opening day alone organisers reported more than AED 250 million in deals. For 2027 the organisers are targeting 700 exhibitors, 17,000 visitors from 140 countries and 15 national pavilions. As a Dubai-based stand builder with our own joinery workshop in Al Quoz, SOL Dubai builds at DWTC as our home venue.

Who visits and what your stand must do

The visitors are trade buyers and professionals from timber trading, woodworking, furniture production and interior fit-out. Many come with a specific job in mind: a furniture factory looking to replace a CNC router or edge-bander, a fit-out contractor sourcing veneered panels for a hotel project, or a distributor looking for a new hardware line. They judge quickly, and they judge on the product in front of them.

That means your stand has to show material and machines as they really are. Panel and veneer suppliers need large-format samples that buyers can touch, with edges and backs visible so the core and finish can be checked. Hardware and fittings brands need working displays — drawers that open, hinges that close, sliding systems that slide. Machinery brands need space for the machine, a safe viewing distance and somewhere to talk numbers afterwards. A good WoodShow stand separates those three jobs clearly: see it, try it, discuss it.

Machinery demonstrations: power, weight and safety

Live machinery demonstrations are one of the reasons buyers come to Dubai WoodShow, and they need more planning than any other part of the stand. Industrial machines often need three-phase power, compressed air and dust extraction, and each of these must be ordered or arranged through the venue well before build-up. We check the electrical load of every machine, request the right supply from DWTC’s official electrical contractor at the advance rate, and route the cables under a raised floor so the stand stays safe to walk.

Weight is the second issue. A heavy machine and the panels it is cutting can put real load on one part of the floor, so we check floor-loading limits at the design stage and schedule machine delivery into the build-up timetable before the stand walls go up around it. For safety, we mark a clear exclusion zone around moving parts, add barriers or acrylic screens where needed, and keep the visitor viewing line at a sensible distance. Noise matters too: a stand with a running saw needs its meeting area at the far side, or behind a closed wall.

Our Dubai WoodShow stand build process

Every Dubai project runs through our eight-stage process, handled start to finish in-house:

  1. Discovery and brief — we list the machines and samples you will show, their sizes, weights and power needs, your meeting requirements and budget, and confirm hall, stand number and dimensions at DWTC.
  2. Concept and 3D design — photorealistic visuals and a floor plan with demonstration zones, sample walls and meeting space.
  3. Costing and approval — a fixed, fully itemised quotation covering structure, sample mounting, power, AV and logistics.
  4. Venue approvals and technical drawings — structural, electrical and floor-loading submissions prepared for DWTC approval.
  5. Fabrication — walls, display structures, joinery and graphics built and quality-checked in our own workshop.
  6. Pre-build and QA — trial assembly with your samples and fittings mounted, so fixings and finishes are proven before build-up.
  7. On-site installation — supervised build at DWTC during official build-up, coordinated with your machinery delivery, and handed over show-ready.
  8. Show-day support and dismantling — standby team on call, then careful dismantling and return or storage of your samples.

A wood stand has to be built properly

At a wood show, the stand itself is judged as a piece of work. Visitors are joiners, furniture makers and fit-out managers, and they will notice a badly finished edge, an uneven veneer joint or a laminate that does not match. We build the joinery for WoodShow stands in our own workshop, so the finishes are done under controlled conditions rather than in the hall, and the stand can be used as a showcase for your own product.

If you supply panels, veneers, flooring or surface finishes, we can build your stand from your own material: wall cladding in your panels, a counter faced with your veneer, a floor laid in your boards. Visitors then see the product at full scale, used the way a client would use it. Lighting is chosen to show grain and colour accurately, because wood looks very different under cold or poorly aimed light. All materials used are fire-retardant to DWTC rules.

Country pavilions and group stands

Dubai WoodShow has a strong country-pavilion element, with national groups bringing several manufacturers under one flag. A pavilion has to do two jobs at once: present a clear national identity from the aisle, and give each company inside it a fair, well-lit space of its own with storage and a place to meet. We design pavilions as one structure with a common visual language, then fit out each exhibitor’s unit to the same standard.

For a trade body or export agency, we handle the approvals, logistics and build for the whole pavilion as one project with one point of contact. See our country pavilion design work for how we approach multi-exhibitor builds at DWTC.

Booking lead times

For a custom stand at DWTC we recommend starting 8–14 weeks before the show, and earlier for a double-decker or a large pavilion, because the venue’s technical approval and permits come before any building starts. A modular stand with custom graphics needs less lead time. Send us your hall, stand size and show dates and we will set out a build timeline that fits them.

The steps are the same for every show. We agree the brief and budget, then send 3D concepts and a costed quote. Once the design is approved we prepare the structural drawings and submit them to the organiser and DWTC for approval. Fabrication runs in our workshop alongside that approval, so the stand is built and checked before move-in. On site we handle the build, power and furniture, stay on call through the open days, and take everything down and clear the space at the end.

Stand options and pricing

We build every WoodShow format. Upgraded shell-scheme and modular packages, from AED 950 per square metre, suit smaller exhibitors who need clean branding, a sample wall and a meeting point. Custom stands start from AED 1,650 per square metre and give you a bespoke layout with demonstration space, working displays and joinery built to show your material. Premium builds start from AED 2,400 per square metre, and double-decker and pavilion builds from AED 3,200 per square metre.

The final figure depends on stand size, the number and weight of machines and samples, power and compressed-air requirements, meeting space and branding. Every quotation is fixed and itemised, so the price you approve is the price you pay.

Why wood and machinery brands choose SOL Dubai

We are a Dubai-based exhibition stand builder with our own workshop in Al Quoz, working at DWTC as our home venue. We handle WoodShow stands start to finish: design, joinery and fabrication, venue approvals, machinery coordination and on-site installation. Clients get workshop-built quality, a single accountable team and a price that holds from quotation to final invoice.

Building at Dubai World Trade Centre: the rules that shape your Dubai WoodShow 2027 stand

Dubai WoodShow 2027 is governed by the Dubai World Trade Centre’s own technical regulations. Get them right and your stand goes up cleanly; miss a submission and you lose build time, not just money. We design to all of this from the first sketch and file the paperwork for you.

Permit to Build

Every stand needs a DWTC Stand Permit to Build (PTB) before construction. We prepare and submit it so your build is cleared to start on day one of build-up.

Height & “complex” structures

Standard custom builds work to around 4m. Taller builds and anything DWTC classes as complex — double-deckers, long spans, or stands where the travel distance to an exit exceeds 10m — trigger structural-engineer clearance through DWTC’s Organiser+ portal before the Permit to Build is released, and the engineer can halt an unsafe build on site.

Double-deckers

A two-storey stand needs certified structural calculations, a Double-Deck health-and-safety declaration, a displayed maximum-occupancy figure and code-compliant staircases — at least 1m wide with handrails, and a second staircase once an upper deck passes ~200 sqm or sits over 25m from the stairs.

Electrical power

All mains power is supplied by DWTC’s official Electrical Contractor and ordered in advance — you can’t self-wire mains. We design the scheme and order it, including 24-hour power where your stand needs it.

Rigging & suspended elements

Banners and lighting rigs hung from the hall are subject to DWTC approval and load limits and ordered ahead of tenancy. We prepare and file the rigging submission on time.

Fixings & fire-safe materials

Nothing may be fixed to the floors, walls, ceilings or structural steel, and all materials must be fire-retardant — Perspex is prohibited (Lexan and Macralon are accepted). We complete and inspect finishes in our workshop, so the on-site crew assembles an approved build.

Accreditation & deadlines

Every contractor needs a DWTC Contractor+ digital badge and PPE is mandatory. Structural, rigging and electrical submissions run weeks ahead of build-up, and late orders attract surcharges — we manage the badges and the deadlines.

Recent Builds

Recent builds from our workshop

Real stands designed and built by our in-house team. Every stand is pre-built and inspected before it ships to Dubai World Trade Centre.

SOL Dubai custom stand, built in our Dubai workshop
Custom stand · SOL Dubai
SOL Dubai island stand, built in our Dubai workshop
Island stand · SOL Dubai
SOL Dubai double-decker, built in our Dubai workshop
Double-decker · SOL Dubai
SOL Dubai feature-lit, built in our Dubai workshop
Feature-lit · SOL Dubai
SOL Dubai bespoke build, built in our Dubai workshop
Bespoke build · SOL Dubai
SOL Dubai country pavilion, built in our Dubai workshop
Country pavilion · SOL Dubai
View our full portfolio
Transparent Pricing

Dubai WoodShow 2027 stand pricing — all-inclusive

One quote covers design, in-house build, graphics, delivery, install, dismantle and venue paperwork — fixed and itemised, with a free 3D concept before you commit.

Modular
9–18 sqm
From
AED 950 / sqm
Best for: first-time and value-focused exhibitors
  • Reusable system structure
  • Custom-printed graphics
  • LED lighting & furniture
  • Delivery, install & dismantle
  • Venue paperwork handled
Get a quote
Premium
50–100 sqm
From
AED 2,400 / sqm
Best for: large, high-impact stands with demo space
  • Everything in Custom, plus:
  • Large-scale custom build
  • Double-height feature elements
  • Full AV & feature lighting
  • Demo / hospitality area
  • Priority in-house build slot
Get a quote
Double-Decker / Pavilion
100+ sqm
From
AED 3,200 / sqm
Best for: flagship presence and country pavilions
  • Everything in Premium, plus:
  • Two-storey engineered build
  • VIP lounge & meeting rooms
  • Certified structural sign-off
  • Country-pavilion capable to 1,500 sqm
Get a quote

Not included: venue space rental (paid to the organiser), and venue electrical & rigging orders (we place these at the advance rate on your behalf and bill at cost). Bespoke add-ons are quoted line by line, so the number you sign is the number you pay.

Case Studies

Real briefs. Real results.

See how brands turn raw floor space into a working show presence — every project handed over to a documented client sign-off.

Explore all case studies →
Field Notes

Build notes for Dubai World Trade Centre

The detail that isn’t in the exhibitor manual — from the people who build here.

CD
Carlos Dalè
General Manager, SOL Dubai · oversees stand design and build to venue rules across Dubai, Abu Dhabi and Riyadh
01

Permit to Build gates everything — file the structural calcs early

At DWTC nothing gets built without a Permit to Build, and for any complex or double-deck stand that permit depends on structural calculations clearing the DWTC engineer. We submit on Organiser+ the week the design is signed off — a late structural file, not the build, is what most often delays a stand.

02

Mains power is DWTC’s to supply — order it, don’t wire it

All mains electrical comes from DWTC’s official contractor and is ordered in advance. We book power — including 24-hour supply where a stand needs it — at the advance rate so nothing is sitting dead on opening morning.

03

Finish in the workshop — Perspex won’t pass

Only fire-retardant materials are allowed and Perspex is specifically prohibited (we use Lexan or Macralon). We complete and inspect every finish at our workshop, so the on-site crew assembles an approved build instead of fabricating in the hall.

04

Lock the slot early

DWTC’s calendar is packed, so build-up slots, rigging and power book out and late orders cost more. We secure your space-only window and order services at the advance rate.

Common mistakes, in order of frequency

  1. An oversized logo on the back wall that crowds out the one-line proposition a buyer reads in three seconds.
  2. The same graphic on the front and side panels of an inline stand — the aisle-facing side panel is your most wasted surface.
  3. A counter or sign at the very front that blocks the sightline into the stand and stops buyers stepping in.
  4. Under-ordering power — no 24-hour supply for fridges, screens or live demos, so the stand isn’t ready on opening morning.
  5. Leaving structural, rigging and electrical orders until after the venue deadlines and paying avoidable surcharges.
FAQ

Dubai WoodShow 2027 stand questions, answered

Real answers with real numbers — including the venue’s build rules. Click any question to expand.

When and where is Dubai WoodShow 2027?
Dubai WoodShow 2027, the 23rd edition, takes place from 6 to 8 April 2027 at the Dubai World Trade Centre (DWTC). The 2026 edition was moved to June 2026; the 2027 edition returns to April.
How big is Dubai WoodShow?
For 2027 the organisers are targeting 700 exhibitors, 17,000 visitors from 140 countries and 15 national pavilions. On the opening day of the 2026 edition they reported more than AED 250 million in deals.
How much does a Dubai WoodShow stand cost?
A full-service Dubai WoodShow stand starts from AED 950/sqm for a modular build, AED 1,650/sqm for a bespoke custom stand, AED 2,400/sqm for large premium builds and AED 3,200/sqm for double-decker and pavilion builds. Prices are approximate starting points; every quote is fixed and itemised with a free 3D concept.
How far ahead should we book a stand for Dubai WoodShow?
We recommend starting 8–14 weeks before the show for a custom stand, and earlier for a double-decker or pavilion, because the venue’s structural approval and permits come first. A modular stand with custom graphics needs less lead time. Send us your hall and stand size and we will set out a timeline that fits your dates.
Can you build a stand that runs live woodworking machinery?
Yes. We plan demonstration zones with three-phase power, compressed air and dust extraction where needed, safe viewing distances, barriers or screens around moving parts, and a meeting area away from the noise.
Can heavy machines go on the stand floor?
Yes, with planning. We check DWTC floor-loading limits against the weight of each machine at the design stage, schedule the machinery delivery into build-up before the walls go up, and build any raised floor around it.
Can you build our stand from our own panels or veneers?
Yes. Panel, veneer, flooring and finish suppliers often want the stand built from their own material. Send us the product and we will build wall cladding, counters and floors from it in our workshop.
Do you build country pavilions at Dubai WoodShow?
Yes. We design and build national pavilions as one structure with a shared identity, fit out each exhibitor’s unit to the same standard, and run approvals and logistics as a single project.
Who handles the Dubai World Trade Centre permits and approvals?
We do, start to finish. Every stand at DWTC needs a Stand Permit to Build, and complex or double-deck stands need structural calculations cleared by the DWTC engineer first. We prepare the drawings, submit them and manage the approval.
How is power ordered for machinery and lighting?
Mains power at DWTC is supplied by the venue’s official electrical contractor and ordered in advance. We work out the load for your machines, lighting and screens and place the order at the advance rate.
Do you build double-decker stands at Dubai WoodShow?
Yes. A two-storey stand adds an upstairs meeting floor above an open demonstration area, which keeps sales conversations away from machine noise. It needs certified structural calculations, a displayed maximum-occupancy figure and code-compliant staircases. We engineer, certify and build it in-house.
What’s included in a full-service Dubai WoodShow stand?
Custom 3D design, in-house fabrication and pre-build, full graphics, delivery to Dubai World Trade Centre, install and dismantle, the DWTC Permit to Build and H&S paperwork, electrical and rigging ordered on your behalf, and a dedicated project manager. Venue space rental is paid to the organiser and is not included.
Do you provide on-site support during Dubai WoodShow?
Yes. Our team is on call across all three show days for anything from a graphic touch-up to an electrical fix, and larger stands get a dedicated on-site project lead.
What happens to the stand and samples after the show?
We dismantle and clear the space, return your samples or hand them to your logistics agent, and can store reusable stand elements for your next edition so you are not paying to rebuild from scratch.
More Shows

More construction & industrial shows we build for

Other shows our in-house team designs and builds for, with the same full-service service and full venue handling.

See the full show calendar

Get your Dubai WoodShow 2027 stand quote in 48 hours

Custom 3D rendering and all-inclusive pricing, designed to Dubai World Trade Centre’s rules with structural sign-off built into the timeline. We build in-house and install on site — the stand you approve in the rendering is the stand that opens.

Request a free quote
Live now