Skip to content
Home › Shows › Automotive › EV World 2026
Dubai · DWTCAutomotive

EV World 2026 Exhibition Stand Design & Build (DWTC)

Full-service custom stands for EV World 2026, the Dubai International Electric Vehicle Exhibition & Conference at Dubai World Trade Centre — design, in-house build, the DWTC Permit to Build and H&S paperwork, vehicle and charger display, install and on-stand support.

Custom exhibition stand designed and built by SOL Dubai at Dubai World Trade Centre
★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★10–12 Nov 2026Next edition★AutomotiveAudience★3 daysDuration★48 hoursQuote turnaround★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★10–12 Nov 2026Next edition★AutomotiveAudience★3 daysDuration★48 hoursQuote turnaround

EV World 2026 at a glance

EV World 2026 is the first edition of the Dubai International Electric Vehicle Exhibition & Conference, organised by Dubai’s Roads and Transport Authority (RTA) at Dubai World Trade Centre (DWTC). It runs for three days, 10–12 November 2026, under the theme “Driving a Smart and Sustainable Mobility Future”, and is held under the patronage of Sheikh Hamdan bin Mohammed bin Rashid Al Maktoum. The DWTC calendar lists it as EV World Show.

The exhibition covers electric vehicle manufacturing and operation, smart and fast charging infrastructure, battery management and EV battery recycling, hydrogen fuel cells, autonomous vehicles and software, eVTOL aircraft and drones, solar and sustainable energy systems, and electric and hydrogen marine transport. Alongside it run the EV World Conference, with panel discussions and technical workshops, live demonstrations and a hackathon.

Because this is a first edition there are no past results yet. The RTA expects more than 300 companies, authorities and organisations to take part and more than 10,000 specialist visitors, with around 70 speakers. The audience is EV and mobility companies, government authorities, decision-makers, investors and specialists. As a Dubai-based stand builder working at DWTC as our home venue, SOL Dubai builds in these halls every season.

What an EV World stand has to do

With the RTA as organiser, EV World is a show where the buyers include the people who plan Dubai’s transport networks, alongside fleet operators, developers and investors. A stand has to show two things at once: the product itself, and how it fits into a city system. A vehicle on a platform tells part of the story; a charger beside it, a screen showing the network it connects to and a clear statement of what it means for an operator tell the rest.

Being a first edition also matters. Visitors will be forming their view of who leads in this market, and exhibitors who look established and well organised from day one gain from that. The stand should be easy to read from the aisle, with one clear message about what you offer, and should give space for the longer technical and commercial conversations that government and fleet buyers want. A meeting area with screens for data and drawings is as important as the vehicle.

Our EV World stand build process

Every Dubai project runs through our eight-stage process, handled start to finish in-house:

  1. Discovery and brief — we list the vehicles, chargers and equipment you will show, with their dimensions, weights and power needs, your meeting requirements and budget, and confirm hall, stand number and dimensions at DWTC.
  2. Concept and 3D design — photorealistic visuals and a floor plan placing hero vehicles and charging units where they read from the aisle.
  3. Costing and approval — a fixed, fully itemised quotation covering structure, vehicle platforms, power, AV and logistics.
  4. Venue approvals and technical drawings — structural, electrical, floor-loading and rigging submissions prepared for DWTC approval.
  5. Fabrication — platforms, walls, counters, joinery and graphics built and quality-checked in our own workshop.
  6. Pre-build and QA — trial assembly with screens and lighting fitted, so the hall build is assembly, not fabrication.
  7. On-site installation — supervised build at DWTC during official build-up, with vehicle move-in scheduled into the timetable.
  8. Show-day support and dismantling — standby team on call, then dismantling and coordinated vehicle move-out.

Showing vehicles, chargers and batteries

Vehicles bring weight and access questions that most stands do not. We check every vehicle’s dimensions against the hall doors and the build-up route, plan the order in which cars, buses, bikes or other units arrive, and leave the stand open on the side they will be driven or pushed in from until they are in place. Vehicle platforms are built in our workshop with ramps or low edges, and floor-loading limits are checked for the heaviest items.

Charging hardware and battery systems have their own needs. Chargers look best installed as they would be in a car park or depot, at the right height and with a vehicle plugged in, but any live connection must go through the venue’s electrical rules, so we agree early whether units will be powered or shown as static displays. Battery packs and cutaway components work well on lit plinths with short technical labels. Lighting is chosen to show paint, glass and metal finishes without hard reflections.

Software, autonomy and infrastructure exhibitors

Not every EV World exhibitor brings hardware. Companies working on autonomous-vehicle software, fleet management, smart charging platforms, energy systems or mobility services need to make an invisible product visible. We usually build these stands around large screens or LED walls showing live dashboards, maps and simulations, with a demo counter where a visitor can try the software and see real data rather than a loop of marketing video.

Exhibitors in eVTOL, drones, hydrogen and marine transport often show scale models or single components. We build plinths and display cases for them, with backdrops that place the model in context, such as a skyline for an air taxi or a waterfront for an electric ferry. Where several partners present one system, for example a vehicle maker, a charging provider and an energy company together, we can design a shared stand that shows how the parts connect while keeping each brand clear.

Working with the conference, demonstrations and hackathon

The EV World programme includes panel discussions, technical workshops, live demonstrations and a hackathon, and these will shape where visitors go and when. If your company has a speaker, a demonstration slot or a hackathon challenge, the stand should support it: a screen previewing your session, a meeting point for people who saw it and a clear follow-up route such as a QR code to technical material.

Government and authority visitors often come in delegations with tight schedules. A stand that can host a short, structured walk-through, with a clear route past the key products and a seated area at the end for questions, makes those visits count. We plan these routes into the layout from the first sketch, and can add a private meeting room for commercial discussions that should not happen at the counter.

Booking lead times

For a custom stand at DWTC we recommend starting 8–14 weeks before the show, and earlier for a double-decker or a large pavilion, because the venue’s technical approval and permits come before any building starts. A modular stand with custom graphics needs less lead time. Send us your hall, stand size and show dates and we will set out a build timeline that fits them.

The steps are the same for every show. We agree the brief and budget, then send 3D concepts and a costed quote. Once the design is approved we prepare the structural drawings and submit them to the organiser and DWTC for approval. Fabrication runs in our workshop alongside that approval, so the stand is built and checked before move-in. On site we handle the build, power and furniture, stay on call through the open days, and take everything down and clear the space at the end.

Stand options and pricing

We build every EV World format. Modular stands suit startups, service providers and software companies who need clean branding, screens and a meeting point. Custom stands give vehicle makers and charging providers a bespoke layout with platforms, product displays and meeting space. Double-decker stands let larger manufacturers put an upstairs hospitality or meeting floor above an open vehicle display.

Indicative starting prices are from AED 950/sqm for modular, from AED 1,650/sqm for custom, from AED 2,400/sqm for premium builds and from AED 3,200/sqm for double-decker and pavilion builds. The final figure depends on size, vehicle platforms, power, AV, structure and branding. Every quotation is fixed and itemised, so the price you approve is the price you pay.

Why mobility brands choose SOL Dubai

We are a Dubai-based exhibition stand builder with our own workshop in Al Quoz, working at DWTC as our home venue. We handle EV World stands start to finish: design, fabrication, the venue approvals, vehicle and equipment logistics, AV and on-site installation. Product-heavy stands with screens and meeting space are exactly the kind of work our in-house team is set up for.

Clients get workshop-built quality, a single accountable team and a price that holds from quotation to final invoice. If you also exhibit at energy or automotive shows elsewhere in the Gulf, we can carry your stand design across them.

Building at Dubai World Trade Centre: the rules that shape your EV World 2026 stand

EV World 2026 is governed by the Dubai World Trade Centre’s own technical regulations. Get them right and your stand goes up cleanly; miss a submission and you lose build time, not just money. We design to all of this from the first sketch and file the paperwork for you.

Permit to Build

Every stand needs a DWTC Stand Permit to Build (PTB) before construction. We prepare and submit it so your build is cleared to start on day one of build-up.

Height & “complex” structures

Standard custom builds work to around 4m. Taller builds and anything DWTC classes as complex — double-deckers, long spans, or stands where the travel distance to an exit exceeds 10m — trigger structural-engineer clearance through DWTC’s Organiser+ portal before the Permit to Build is released, and the engineer can halt an unsafe build on site.

Double-deckers

A two-storey stand needs certified structural calculations, a Double-Deck health-and-safety declaration, a displayed maximum-occupancy figure and code-compliant staircases — at least 1m wide with handrails, and a second staircase once an upper deck passes ~200 sqm or sits over 25m from the stairs.

Electrical power

All mains power is supplied by DWTC’s official Electrical Contractor and ordered in advance — you can’t self-wire mains. We design the scheme and order it, including 24-hour power where your stand needs it.

Rigging & suspended elements

Banners and lighting rigs hung from the hall are subject to DWTC approval and load limits and ordered ahead of tenancy. We prepare and file the rigging submission on time.

Fixings & fire-safe materials

Nothing may be fixed to the floors, walls, ceilings or structural steel, and all materials must be fire-retardant — Perspex is prohibited (Lexan and Macralon are accepted). We complete and inspect finishes in our workshop, so the on-site crew assembles an approved build.

Accreditation & deadlines

Every contractor needs a DWTC Contractor+ digital badge and PPE is mandatory. Structural, rigging and electrical submissions run weeks ahead of build-up, and late orders attract surcharges — we manage the badges and the deadlines.

Recent Builds

Recent builds from our workshop

Real stands designed and built by our in-house team. Every stand is pre-built and inspected before it ships to Dubai World Trade Centre.

SOL Dubai custom stand, built in our Dubai workshop
Custom stand · SOL Dubai
SOL Dubai island stand, built in our Dubai workshop
Island stand · SOL Dubai
SOL Dubai double-decker, built in our Dubai workshop
Double-decker · SOL Dubai
SOL Dubai feature-lit, built in our Dubai workshop
Feature-lit · SOL Dubai
SOL Dubai bespoke build, built in our Dubai workshop
Bespoke build · SOL Dubai
SOL Dubai country pavilion, built in our Dubai workshop
Country pavilion · SOL Dubai
View our full portfolio
Transparent Pricing

EV World 2026 stand pricing — all-inclusive

One quote covers design, in-house build, graphics, delivery, install, dismantle and venue paperwork — fixed and itemised, with a free 3D concept before you commit.

Modular
9–18 sqm
From
AED 950 / sqm
Best for: first-time and value-focused exhibitors
  • Reusable system structure
  • Custom-printed graphics
  • LED lighting & furniture
  • Delivery, install & dismantle
  • Venue paperwork handled
Get a quote
Premium
50–100 sqm
From
AED 2,400 / sqm
Best for: large, high-impact stands with demo space
  • Everything in Custom, plus:
  • Large-scale custom build
  • Double-height feature elements
  • Full AV & feature lighting
  • Demo / hospitality area
  • Priority in-house build slot
Get a quote
Double-Decker / Pavilion
100+ sqm
From
AED 3,200 / sqm
Best for: flagship presence and country pavilions
  • Everything in Premium, plus:
  • Two-storey engineered build
  • VIP lounge & meeting rooms
  • Certified structural sign-off
  • Country-pavilion capable to 1,500 sqm
Get a quote

Not included: venue space rental (paid to the organiser), and venue electrical & rigging orders (we place these at the advance rate on your behalf and bill at cost). Bespoke add-ons are quoted line by line, so the number you sign is the number you pay.

Case Studies

Real briefs. Real results.

See how brands turn raw floor space into a working show presence — every project handed over to a documented client sign-off.

Explore all case studies →
Field Notes

Build notes for Dubai World Trade Centre

The detail that isn’t in the exhibitor manual — from the people who build here.

CD
Carlos Dalè
General Manager, SOL Dubai · oversees stand design and build to venue rules across Dubai, Abu Dhabi and Riyadh
01

Permit to Build gates everything — file the structural calcs early

At DWTC nothing gets built without a Permit to Build, and for any complex or double-deck stand that permit depends on structural calculations clearing the DWTC engineer. We submit on Organiser+ the week the design is signed off — a late structural file, not the build, is what most often delays a stand.

02

Mains power is DWTC’s to supply — order it, don’t wire it

All mains electrical comes from DWTC’s official contractor and is ordered in advance. We book power — including 24-hour supply where a stand needs it — at the advance rate so nothing is sitting dead on opening morning.

03

Finish in the workshop — Perspex won’t pass

Only fire-retardant materials are allowed and Perspex is specifically prohibited (we use Lexan or Macralon). We complete and inspect every finish at our workshop, so the on-site crew assembles an approved build instead of fabricating in the hall.

04

Lock the slot early

DWTC’s calendar is packed, so build-up slots, rigging and power book out and late orders cost more. We secure your space-only window and order services at the advance rate.

Common mistakes, in order of frequency

  1. An oversized logo on the back wall that crowds out the one-line proposition a buyer reads in three seconds.
  2. The same graphic on the front and side panels of an inline stand — the aisle-facing side panel is your most wasted surface.
  3. A counter or sign at the very front that blocks the sightline into the stand and stops buyers stepping in.
  4. Under-ordering power — no 24-hour supply for fridges, screens or live demos, so the stand isn’t ready on opening morning.
  5. Leaving structural, rigging and electrical orders until after the venue deadlines and paying avoidable surcharges.
FAQ

EV World 2026 stand questions, answered

Real answers with real numbers — including the venue’s build rules. Click any question to expand.

When and where is EV World 2026?
EV World 2026, the Dubai International Electric Vehicle Exhibition & Conference, takes place from 10 to 12 November 2026 at Dubai World Trade Centre. It is organised by Dubai’s Roads and Transport Authority (RTA).
Is this the first EV World?
Yes. The 2026 edition is the inaugural one. The RTA expects more than 300 companies, authorities and organisations and more than 10,000 specialist visitors; these are projections, not results.
What does EV World cover?
Electric vehicle manufacturing and operation, smart and fast charging, battery management and recycling, hydrogen fuel cells, autonomous vehicles and software, eVTOL aircraft and drones, solar and sustainable energy systems, and electric and hydrogen marine transport.
How much does an EV World stand cost?
A full-service EV World stand starts from AED 950/sqm for a modular build, AED 1,650/sqm for a bespoke custom stand, AED 2,400/sqm for large premium builds and AED 3,200/sqm for double-decker and pavilion builds. Prices are approximate starting points; every quote is fixed and itemised with a free 3D concept.
How far ahead should we book a stand for EV World?
We recommend starting 8–14 weeks before the show for a custom stand, and earlier for a double-decker or pavilion, because the venue’s structural approval and permits come first. A modular stand with custom graphics needs less lead time. Send us your hall and stand size and we will set out a timeline that fits your dates.
Can you put vehicles on our stand?
Yes. We check vehicle sizes against hall access, schedule move-in during build-up, build platforms with ramps or low edges in our workshop, and check floor-loading limits for the heaviest units.
Can we show a working charger?
Chargers can be shown live or as static displays. Any live connection must go through DWTC’s electrical rules and official contractor, so we agree the approach at the design stage and order the power needed.
How do you present software or autonomous-driving products?
Usually with large screens or LED walls showing live dashboards, maps and simulations, plus a demo counter where visitors can try the product with real data.
Can several partners share one stand?
Yes. Where a vehicle maker, charging provider and energy company present one system, we design a shared stand that shows how the parts connect while keeping each brand clear, managed as one project.
Who handles the Dubai World Trade Centre permits and approvals?
We do, start to finish. Every stand at DWTC needs a Stand Permit to Build, and complex or double-deck stands need structural calculations cleared by the DWTC engineer first. We prepare the drawings, submit them and manage the approval.
Do you build double-decker stands at EV World?
Yes. A two-storey stand adds an upstairs meeting or hospitality floor above an open vehicle display. It needs certified structural calculations, a displayed maximum-occupancy figure and code-compliant staircases. We engineer, certify and build it in-house.
What’s included in a full-service EV World stand?
Custom 3D design, in-house fabrication and pre-build, full graphics, delivery to Dubai World Trade Centre, install and dismantle, the DWTC Permit to Build and H&S paperwork, electrical and rigging ordered on your behalf, and a dedicated project manager. Venue space rental is paid to the organiser and is not included.
Do you provide on-site support during EV World?
Yes. Our team is on call across all three show days for anything from a graphic touch-up to an electrical fix, and larger stands get a dedicated on-site project lead.
What happens to the stand and vehicles after the show?
We dismantle and clear the space, coordinate vehicle and equipment move-out with your logistics agent, and can store reusable stand elements for the next edition so you are not paying to rebuild from scratch.
More Shows

More automotive shows we build for

Other shows our in-house team designs and builds for, with the same full-service service and full venue handling.

See the full show calendar

Get your EV World 2026 stand quote in 48 hours

Custom 3D rendering and all-inclusive pricing, designed to Dubai World Trade Centre’s rules with structural sign-off built into the timeline. We build in-house and install on site — the stand you approve in the rendering is the stand that opens.

Request a free quote
Live now