Skip to content
Home › Shows › Finance & Investment › Forex Expo Dubai 2027
Dubai · DWTCFinance & Investment

Forex Expo Dubai 2027 Exhibition Stand Design & Build (DWTC)

Custom stands for Forex Expo Dubai 2027 — design, in-house build, the venue permits, install and on-stand support. Built for brokers, liquidity providers and fintechs facing one of the busiest trading-show floors in the region.

Custom exhibition stand designed and built by SOL Dubai at Dubai World Trade Centre
★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★2027 — dates TBCNext edition★Finance & InvestmentAudience★2 days in 2026Duration★48 hoursQuote turnaround★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★2027 — dates TBCNext edition★Finance & InvestmentAudience★2 days in 2026Duration★48 hoursQuote turnaround

Forex Expo Dubai 2027 at a glance

Forex Expo Dubai describes itself as a global event for the multi-asset trading and fintech industry. It is a two-day expo covering online trading, brokerage, liquidity provision and market making, fintech and payments, trading technology, and regulation and compliance. The 9th edition took place on 22–23 September 2026 at the Dubai World Trade Centre (DWTC), using Halls 1–5. The organiser has said it will be back for a next edition but has not yet announced dates, so we list it as 2027 — dates TBC and will update this page once the dates are official.

The 2026 edition was large. According to the organiser’s release published by KT Network, it had 270 exhibitors, 150 speakers across five stages and a total attendance of 23,816, which was recognised by Guinness World Records as the largest attendance at a forex event. That is a lot of people in two days, and it shapes how a stand should be designed.

The audience mixes retail and professional: traders and investors, brokers, introducing brokers and affiliates, liquidity providers, fintech and payment leaders, technology providers, regulators and compliance specialists. SOL Dubai works at DWTC as our home venue, so we plan Forex Expo stands around the halls and approvals we deal with all year.

What a Forex Expo stand has to do

Forex Expo is a crowded, high-energy floor. Thousands of traders walk the halls alongside the professionals, and many brokers use the show to sign up new clients and recruit introducing brokers. Your stand has to handle volume at the front and still protect the quieter, higher-value conversations further in. That usually means a wide, open front with a counter and screens, and a separate meeting area where partnership and institutional deals can be discussed without shouting over the aisle.

It also has to stand out among a lot of similar offers. Many brokers advertise tight spreads, fast execution and multi-asset access, so the stand needs one clear message and a strong, simple visual identity that people recognise from a distance. Regulatory licences belong on the stand too: traders and partners look for them, and showing them clearly is part of building trust. A stand that looks solid and well finished does the rest.

Our Forex Expo stand build process

Every Dubai project runs through our eight-stage process, handled start to finish in-house:

  1. Discovery and brief — we agree your audience (retail traders, IBs and affiliates, institutions), the number of staff on the stand, meetings, demos, hospitality and budget, and confirm hall, stand number and dimensions.
  2. Concept and 3D design — visuals and a floor plan that handle crowds at the front and keep meeting areas usable behind.
  3. Costing and approval — a fixed, fully itemised quotation covering structure, LED and screens, lighting, furniture, power and logistics.
  4. Venue approvals and technical drawings — structural and electrical drawings prepared and submitted to DWTC for the Permit to Build.
  5. Fabrication — walls, counters, meeting rooms, joinery and graphics built and quality-checked in our own workshop in Al Quoz.
  6. Pre-build and QA — trial assembly with AV fitted, so finishes, screen positions and cabling are proven before build-up.
  7. On-site installation — supervised build during the official build-up window, handed over show-ready.
  8. Show-day support and dismantling — standby team on call through both days, then dismantling, clearance and storage of reusable elements.

Designing for high footfall

When a show draws more than twenty thousand people in two days, the stand has to manage queues and crowds. We size the open front so visitors can stop and watch a screen without blocking the aisle, place registration or sign-up points where staff can work tablets comfortably, and keep the route to meeting areas clear. For brokers running sign-up campaigns, we design counters with storage below for giveaways and literature, and room behind for two or three staff to work side by side.

Screens and LED walls are central. Live charts, platform demos and short video loops pull people in from the aisle, but only if they are big enough and positioned above head height so the crowd does not block them. We plan the AV with you, specify sizes for the stand depth and run all cabling under a raised floor. If you plan presentations or giveaways on the stand, we allow space for the crowd that gathers and check it against the venue’s aisle rules.

Meeting space for partners and institutions

The traders are the crowd, but much of the commercial value at Forex Expo comes from meetings with introducing brokers, affiliates, liquidity providers and technology partners. These conversations cover rebates, rates and contract terms, and need privacy. We build closed or semi-closed meeting rooms with good sound separation, comfortable seating and a screen for presentations, plus a small hospitality point so you can offer coffee and water without leaving the stand.

On larger stands, a double-decker puts these meetings upstairs, away from the noise of the main floor, while the ground floor stays fully open for visitors. Where a second floor is not possible, we use layout and materials — solid walls, acoustic panels and controlled entrances — to give meeting rooms enough quiet to work. Back-of-house storage and a staff area with power for charging devices keep the stand running across two long days.

Staffing shapes the layout too. A broker running a sign-up drive may have eight or ten people on the stand at peak times, split between greeting, onboarding and partner meetings, while a liquidity provider may only need three or four senior staff. We ask how many people will work the stand, what each of them does and where they need to stand, and design counters, meeting seats and storage to match. Getting this right avoids the common problem of a stand that looks good in a render but feels cramped by mid-morning on day one.

Booking lead times

For a custom stand at DWTC we recommend starting 8–14 weeks before the show, and earlier for a double-decker or a large pavilion, because the venue’s technical approval and permits come before any building starts. A modular stand with custom graphics needs less lead time. Send us your hall, stand size and show dates and we will set out a build timeline that fits them.

The steps are the same for every show. We agree the brief and budget, then send 3D concepts and a costed quote. Once the design is approved we prepare the structural drawings and submit them to the organiser and DWTC for approval. Fabrication runs in our workshop alongside that approval, so the stand is built and checked before move-in. On site we handle the build, power and furniture, stay on call through the open days, and take everything down and clear the space at the end.

Stand options and pricing

We build every Forex Expo format. Modular stands from AED 950 per square metre suit smaller brokers and first-time exhibitors who need strong branding, a screen and a counter. Custom single-storey stands from AED 1,650 per square metre give you a bespoke layout with LED walls, branded counters and meeting rooms. Premium builds from AED 2,400 per square metre suit larger brokers who want feature ceilings, large LED installations and lounges. Double-decker stands from AED 3,200 per square metre add an upstairs floor for private partner meetings.

All prices are approximate starting points. The final figure depends on size, structure, AV, meeting space and branding. Every quotation is fixed and itemised, so the price you approve is the price you pay.

Why trading brands choose SOL Dubai

We are a Dubai-based exhibition stand builder with our own workshop in Al Quoz, working at DWTC as our home venue. We handle Forex Expo stands start to finish: design, fabrication, venue approvals, AV and on-site installation. Screen-heavy, high-footfall stands with private meeting space are exactly what our in-house team is set up to build.

Clients get workshop-built quality, one accountable team and a price that holds from quotation to final invoice. If you also exhibit at iFX EXPO Dubai, we can design one stand system that is reconfigured for both shows, which keeps your branding consistent and lowers the cost of the second build.

Building at Dubai World Trade Centre: the rules that shape your Forex Expo Dubai 2027 stand

Forex Expo Dubai 2027 is governed by the Dubai World Trade Centre’s own technical regulations. Get them right and your stand goes up cleanly; miss a submission and you lose build time, not just money. We design to all of this from the first sketch and file the paperwork for you.

Permit to Build

Every stand needs a DWTC Stand Permit to Build (PTB) before construction. We prepare and submit it so your build is cleared to start on day one of build-up.

Height & “complex” structures

Standard custom builds work to around 4m. Taller builds and anything DWTC classes as complex — double-deckers, long spans, or stands where the travel distance to an exit exceeds 10m — trigger structural-engineer clearance through DWTC’s Organiser+ portal before the Permit to Build is released, and the engineer can halt an unsafe build on site.

Double-deckers

A two-storey stand needs certified structural calculations, a Double-Deck health-and-safety declaration, a displayed maximum-occupancy figure and code-compliant staircases — at least 1m wide with handrails, and a second staircase once an upper deck passes ~200 sqm or sits over 25m from the stairs.

Electrical power

All mains power is supplied by DWTC’s official Electrical Contractor and ordered in advance — you can’t self-wire mains. We design the scheme and order it, including 24-hour power where your stand needs it.

Rigging & suspended elements

Banners and lighting rigs hung from the hall are subject to DWTC approval and load limits and ordered ahead of tenancy. We prepare and file the rigging submission on time.

Fixings & fire-safe materials

Nothing may be fixed to the floors, walls, ceilings or structural steel, and all materials must be fire-retardant — Perspex is prohibited (Lexan and Macralon are accepted). We complete and inspect finishes in our workshop, so the on-site crew assembles an approved build.

Accreditation & deadlines

Every contractor needs a DWTC Contractor+ digital badge and PPE is mandatory. Structural, rigging and electrical submissions run weeks ahead of build-up, and late orders attract surcharges — we manage the badges and the deadlines.

Recent Builds

Recent builds from our workshop

Real stands designed and built by our in-house team. Every stand is pre-built and inspected before it ships to Dubai World Trade Centre.

SOL Dubai custom stand, built in our Dubai workshop
Custom stand · SOL Dubai
SOL Dubai island stand, built in our Dubai workshop
Island stand · SOL Dubai
SOL Dubai double-decker, built in our Dubai workshop
Double-decker · SOL Dubai
SOL Dubai feature-lit, built in our Dubai workshop
Feature-lit · SOL Dubai
SOL Dubai bespoke build, built in our Dubai workshop
Bespoke build · SOL Dubai
SOL Dubai country pavilion, built in our Dubai workshop
Country pavilion · SOL Dubai
View our full portfolio
Transparent Pricing

Forex Expo Dubai 2027 stand pricing — all-inclusive

One quote covers design, in-house build, graphics, delivery, install, dismantle and venue paperwork — fixed and itemised, with a free 3D concept before you commit.

Modular
9–18 sqm
From
AED 950 / sqm
Best for: first-time and value-focused exhibitors
  • Reusable system structure
  • Custom-printed graphics
  • LED lighting & furniture
  • Delivery, install & dismantle
  • Venue paperwork handled
Get a quote
Premium
50–100 sqm
From
AED 2,400 / sqm
Best for: large, high-impact stands with demo space
  • Everything in Custom, plus:
  • Large-scale custom build
  • Double-height feature elements
  • Full AV & feature lighting
  • Demo / hospitality area
  • Priority in-house build slot
Get a quote
Double-Decker / Pavilion
100+ sqm
From
AED 3,200 / sqm
Best for: flagship presence and country pavilions
  • Everything in Premium, plus:
  • Two-storey engineered build
  • VIP lounge & meeting rooms
  • Certified structural sign-off
  • Country-pavilion capable to 1,500 sqm
Get a quote

Not included: venue space rental (paid to the organiser), and venue electrical & rigging orders (we place these at the advance rate on your behalf and bill at cost). Bespoke add-ons are quoted line by line, so the number you sign is the number you pay.

Case Studies

Real briefs. Real results.

See how brands turn raw floor space into a working show presence — every project handed over to a documented client sign-off.

Explore all case studies →
Field Notes

Build notes for Dubai World Trade Centre

The detail that isn’t in the exhibitor manual — from the people who build here.

CD
Carlos Dalè
General Manager, SOL Dubai · oversees stand design and build to venue rules across Dubai, Abu Dhabi and Riyadh
01

Permit to Build gates everything — file the structural calcs early

At DWTC nothing gets built without a Permit to Build, and for any complex or double-deck stand that permit depends on structural calculations clearing the DWTC engineer. We submit on Organiser+ the week the design is signed off — a late structural file, not the build, is what most often delays a stand.

02

Mains power is DWTC’s to supply — order it, don’t wire it

All mains electrical comes from DWTC’s official contractor and is ordered in advance. We book power — including 24-hour supply where a stand needs it — at the advance rate so nothing is sitting dead on opening morning.

03

Finish in the workshop — Perspex won’t pass

Only fire-retardant materials are allowed and Perspex is specifically prohibited (we use Lexan or Macralon). We complete and inspect every finish at our workshop, so the on-site crew assembles an approved build instead of fabricating in the hall.

04

Lock the slot early

DWTC’s calendar is packed, so build-up slots, rigging and power book out and late orders cost more. We secure your space-only window and order services at the advance rate.

Common mistakes, in order of frequency

  1. An oversized logo on the back wall that crowds out the one-line proposition a buyer reads in three seconds.
  2. The same graphic on the front and side panels of an inline stand — the aisle-facing side panel is your most wasted surface.
  3. A counter or sign at the very front that blocks the sightline into the stand and stops buyers stepping in.
  4. Under-ordering power — no 24-hour supply for fridges, screens or live demos, so the stand isn’t ready on opening morning.
  5. Leaving structural, rigging and electrical orders until after the venue deadlines and paying avoidable surcharges.
FAQ

Forex Expo Dubai 2027 stand questions, answered

Real answers with real numbers — including the venue’s build rules. Click any question to expand.

When and where is the next Forex Expo Dubai?
The organiser has not yet announced dates for the next edition. The 9th edition took place on 22–23 September 2026 at the Dubai World Trade Centre, in Halls 1–5. We will update this page as soon as the new dates are official.
How big is Forex Expo Dubai?
According to the organiser’s release for the 2026 edition, the show had 270 exhibitors, 150 speakers on five stages and a total attendance of 23,816, recognised by Guinness World Records as the largest attendance at a forex event.
Who visits Forex Expo Dubai?
Traders and investors, brokers, introducing brokers and affiliates, liquidity providers, fintech and payment companies, technology providers, and regulators and compliance specialists.
How much does a Forex Expo Dubai stand cost?
A full-service stand starts from about AED 950/sqm for a modular build, AED 1,650/sqm for a bespoke custom stand, AED 2,400/sqm for premium builds and AED 3,200/sqm for double-decker builds. Prices are approximate starting points; every quote is fixed and itemised with a free 3D concept.
How far ahead should we book a stand for Forex Expo Dubai?
We recommend starting 8–14 weeks before the show for a custom stand, and earlier for a double-decker or pavilion, because the venue’s structural approval and permits come first. A modular stand with custom graphics needs less lead time. Send us your hall and stand size and we will set out a timeline that fits your dates.
How do you design a stand for very high footfall?
We size the open front so crowds can gather without blocking the aisle, put screens above head height, place sign-up points where staff can work comfortably and keep a clear route to the meeting areas.
Can you build private meeting rooms for partner meetings?
Yes. We build closed or semi-closed rooms with solid walls or acoustic panels, seating and a presentation screen, so IB, affiliate and liquidity meetings can happen away from the noise of the floor.
Can you supply LED walls and screens?
Yes. We plan LED walls and screens with you, size them for the stand depth, mount them safely, run cabling under a raised floor and test everything before opening.
Who handles the DWTC permits and approvals?
We do, start to finish. Every stand at DWTC needs a Stand Permit to Build, and complex or double-deck stands need structural calculations cleared by the DWTC engineer first. We prepare the drawings, submit them and manage the approval.
How is power supplied to the stand?
Mains power at DWTC is supplied by the venue’s official electrical contractor and ordered in advance. LED walls draw a lot of power, so we calculate the full load and place the order on your behalf at the advance rate.
Do you build double-decker stands at Forex Expo Dubai?
Yes, where the organiser allows it for your space. An upper floor is useful for private partner meetings. It needs certified structural calculations, a displayed maximum-occupancy figure and code-compliant staircases, all prepared and built in-house.
What’s included in a full-service Forex Expo stand?
Custom 3D design, in-house fabrication and pre-build, graphics, AV, furniture, delivery to the venue, install and dismantle, the Permit to Build and H&S paperwork, electrical and rigging ordered on your behalf, and a dedicated project manager. Space rental is paid to the organiser and is not included.
Do you provide on-site support during the show?
Yes. Our team is on call across both show days for graphic touch-ups, screen issues or electrical fixes, and larger stands get a dedicated on-site project lead.
What happens to the stand after the show?
We dismantle and clear the space and can store reusable elements such as counters, meeting-room walls and graphic frames, so your next trading-show stand costs less to build.
More Shows

More finance & investment shows we build for

Other shows our in-house team designs and builds for, with the same full-service service and full venue handling.

See the full show calendar

Get your Forex Expo Dubai 2027 stand quote in 48 hours

Custom 3D rendering and all-inclusive pricing, designed to Dubai World Trade Centre’s rules with structural sign-off built into the timeline. We build in-house and install on site — the stand you approve in the rendering is the stand that opens.

Request a free quote
Live now