Skip to content
Home › Shows › Education › GESS Dubai 2026
Dubai · DWTCEducation

GESS Dubai 2026 Exhibition Stand Design & Build (DWTC)

Full-service custom stands for GESS Dubai 2026 at Dubai World Trade Centre — design, in-house build, the DWTC Permit to Build and H&S paperwork, install and on-stand support. Built to win teachers, school leaders and education buyers.

Custom exhibition stand designed and built by SOL Dubai at Dubai World Trade Centre
★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★10–12 Nov 2026Next edition★EducationAudience★3 daysDuration★48 hoursQuote turnaround★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★10–12 Nov 2026Next edition★EducationAudience★3 daysDuration★48 hoursQuote turnaround

GESS Dubai 2026 at a glance

GESS Dubai (Global Educational Supplies & Solutions) is an education exhibition and conference for the supplies, solutions and EdTech sector, held at Dubai World Trade Centre (DWTC) in the Sheikh Saeed Halls. The 2026 edition runs for three days, 10–12 November 2026, with opening hours of 10am–6pm on 10 and 11 November and 10am–5pm on 12 November. The event carries Informa branding.

The exhibition covers EdTech including AI, AR, VR and immersive technology, school equipment and supplies, teaching aids and resources, educational software and hardware, early years, the design and build of learning spaces, and inclusion, wellbeing and sustainability. Around the show floor run a free CPD-accredited conference, workshops, the GESS Education Awards, a Startup Spotlight pitch stage, Leaders in Education and Education Investment MENA.

The visitors are teachers, principals and school leaders, EdTech leaders, education suppliers and investors. Many of them are the people who choose what a school buys, or who influence that decision strongly. As a Dubai-based stand builder working at DWTC as our home venue, SOL Dubai builds stands in these halls every season.

What a GESS stand has to do

Teachers buy what they have seen work in a classroom. A GESS stand therefore has to let visitors use the product, not just read about it: a screen they can tap, a robotics kit they can pick up, furniture they can sit on, a lab bench they can stand at. If your product is software, visitors want to see a real lesson running on it, at the size it would appear on a classroom board, with someone on hand to explain it.

The audience also arrives in two moods. Some teachers come between conference sessions for a quick look and a freebie; school leaders and procurement staff come with a list and want a proper conversation about pricing, training and support. A good GESS layout serves both: an open, hands-on front for browsing and short demos, and a quieter table further back where a principal can talk through a rollout across several schools without competing with the aisle.

Our GESS stand build process

Every Dubai project runs through our eight-stage process, handled start to finish in-house:

  1. Discovery and brief — we list the products and demos you will run, the screens and devices they need, your meeting needs and budget, and confirm hall, stand number and dimensions in the Sheikh Saeed Halls.
  2. Concept and 3D design — photorealistic visuals and a floor plan that place hands-on demo points at the front and a meeting table behind.
  3. Costing and approval — a fixed, fully itemised quotation covering structure, furniture, power, data, AV and logistics.
  4. Venue approvals and technical drawings — structural, electrical and rigging submissions prepared for DWTC approval.
  5. Fabrication — walls, counters, demo benches, joinery and graphics built and quality-checked in our own workshop.
  6. Pre-build and QA — trial assembly with screen mounts and device holders fitted, so cabling and fixings are proven before build-up.
  7. On-site installation — supervised build at DWTC during official build-up, handed over show-ready.
  8. Show-day support and dismantling — standby team on call, then careful dismantling and return or storage of your stand and products.

Designing for hands-on EdTech demos

Most GESS stands live or die on their screens. We plan each demo point around the device it carries: interactive panels mounted at the height a teacher would use them, tablets on secure but easy-to-handle holders, and VR or immersive set-ups given enough clear floor so a visitor wearing a headset does not step into the aisle. Every screen gets its own power and data run hidden under a raised floor, so there are no cables across the walkway.

Sound needs thought too. The halls are busy and several demos on one stand can drown each other out, so we separate noisy demos from meeting space, use directional speakers or headphones where a product relies on audio, and add soft finishes that take the edge off hall noise. Graphics stay short: the age range or curriculum area, what the product does in a lesson and one clear reason to stop. Teachers walk past long paragraphs.

Learning-space, furniture and early-years exhibitors

GESS also covers the design and build of learning spaces, school furniture, equipment and early-years products. For these exhibitors the stand itself is the showroom. We often build a section of the stand as a sample classroom, library corner or early-years zone, with flooring, wall finishes and lighting chosen to show the product in the setting it is made for. Visitors understand a reading nook or a flexible classroom much faster when they can stand inside one.

Products for young children need extra care on the stand: rounded edges, stable fixings and no small loose parts at floor level, because visitors handle everything. Furniture brands usually want a range on show, so we plan floor space and sightlines to show several configurations without the stand feeling like a warehouse. All materials are fire-retardant to DWTC rules and finishes are completed in our workshop, so build-up is assembly rather than fabrication.

Working with the conference, awards and Startup Spotlight

GESS is as much a conference as an exhibition, and that shapes traffic. The free CPD-accredited sessions bring teachers into the halls in waves, with the busiest stand time just after sessions finish. We position the most eye-catching element of your stand so it faces the main flow from the conference areas, and keep the front open so a group of teachers can gather without blocking the aisle.

If you are a speaker, a GESS Education Awards entrant or a startup pitching in the Startup Spotlight, plan the stand around that moment. A screen looping your session topic, a clear place to meet people who saw your talk, and enough literature or QR-linked resources to hand out make the difference between a good session and real follow-up. Exhibitors interested in Education Investment MENA often need a small private corner for investor conversations, which we can build into even a mid-sized stand.

Booking lead times

For a custom stand at DWTC we recommend starting 8–14 weeks before the show, and earlier for a double-decker or a large pavilion, because the venue’s technical approval and permits come before any building starts. A modular stand with custom graphics needs less lead time. Send us your hall, stand size and show dates and we will set out a build timeline that fits them.

The steps are the same for every show. We agree the brief and budget, then send 3D concepts and a costed quote. Once the design is approved we prepare the structural drawings and submit them to the organiser and DWTC for approval. Fabrication runs in our workshop alongside that approval, so the stand is built and checked before move-in. On site we handle the build, power and furniture, stay on call through the open days, and take everything down and clear the space at the end.

Stand options and pricing

We build every GESS format. Modular stands suit startups, first-time exhibitors and resellers who need clean branding, a couple of demo points and a counter. Custom single-storey stands give you a bespoke layout with sample classrooms, demo zones and meeting space. Larger suppliers and distributors with several product lines can use a double-decker to add an upstairs meeting floor above an open demo area, or a pavilion for a group of education companies exhibiting together.

Indicative starting prices are from AED 950/sqm for modular, from AED 1,650/sqm for custom, from AED 2,400/sqm for premium builds and from AED 3,200/sqm for double-decker and pavilion builds. The final figure depends on size, the number of screens and demo points, furniture, structure and branding. Every quotation is fixed and itemised, so the price you approve is the price you pay.

Why education brands choose SOL Dubai

We are a Dubai-based exhibition stand builder with our own workshop in Al Quoz, working at DWTC as our home venue. We handle GESS stands start to finish: design, fabrication, the venue approvals, AV and device integration, and on-site installation. Demo-heavy stands with meeting space are exactly the kind of work our in-house team is set up for.

Clients get workshop-built quality, a single accountable team and a price that holds from quotation to final invoice. If your company also exhibits to universities and students, we can carry your design across to a stand at Najah Dubai as well.

Building at Dubai World Trade Centre: the rules that shape your GESS Dubai 2026 stand

GESS Dubai 2026 is governed by the Dubai World Trade Centre’s own technical regulations. Get them right and your stand goes up cleanly; miss a submission and you lose build time, not just money. We design to all of this from the first sketch and file the paperwork for you.

Permit to Build

Every stand needs a DWTC Stand Permit to Build (PTB) before construction. We prepare and submit it so your build is cleared to start on day one of build-up.

Height & “complex” structures

Standard custom builds work to around 4m. Taller builds and anything DWTC classes as complex — double-deckers, long spans, or stands where the travel distance to an exit exceeds 10m — trigger structural-engineer clearance through DWTC’s Organiser+ portal before the Permit to Build is released, and the engineer can halt an unsafe build on site.

Double-deckers

A two-storey stand needs certified structural calculations, a Double-Deck health-and-safety declaration, a displayed maximum-occupancy figure and code-compliant staircases — at least 1m wide with handrails, and a second staircase once an upper deck passes ~200 sqm or sits over 25m from the stairs.

Electrical power

All mains power is supplied by DWTC’s official Electrical Contractor and ordered in advance — you can’t self-wire mains. We design the scheme and order it, including 24-hour power where your stand needs it.

Rigging & suspended elements

Banners and lighting rigs hung from the hall are subject to DWTC approval and load limits and ordered ahead of tenancy. We prepare and file the rigging submission on time.

Fixings & fire-safe materials

Nothing may be fixed to the floors, walls, ceilings or structural steel, and all materials must be fire-retardant — Perspex is prohibited (Lexan and Macralon are accepted). We complete and inspect finishes in our workshop, so the on-site crew assembles an approved build.

Accreditation & deadlines

Every contractor needs a DWTC Contractor+ digital badge and PPE is mandatory. Structural, rigging and electrical submissions run weeks ahead of build-up, and late orders attract surcharges — we manage the badges and the deadlines.

Recent Builds

Recent builds from our workshop

Real stands designed and built by our in-house team. Every stand is pre-built and inspected before it ships to Dubai World Trade Centre.

SOL Dubai custom stand, built in our Dubai workshop
Custom stand · SOL Dubai
SOL Dubai island stand, built in our Dubai workshop
Island stand · SOL Dubai
SOL Dubai double-decker, built in our Dubai workshop
Double-decker · SOL Dubai
SOL Dubai feature-lit, built in our Dubai workshop
Feature-lit · SOL Dubai
SOL Dubai bespoke build, built in our Dubai workshop
Bespoke build · SOL Dubai
SOL Dubai country pavilion, built in our Dubai workshop
Country pavilion · SOL Dubai
View our full portfolio
Transparent Pricing

GESS Dubai 2026 stand pricing — all-inclusive

One quote covers design, in-house build, graphics, delivery, install, dismantle and venue paperwork — fixed and itemised, with a free 3D concept before you commit.

Modular
9–18 sqm
From
AED 950 / sqm
Best for: first-time and value-focused exhibitors
  • Reusable system structure
  • Custom-printed graphics
  • LED lighting & furniture
  • Delivery, install & dismantle
  • Venue paperwork handled
Get a quote
Premium
50–100 sqm
From
AED 2,400 / sqm
Best for: large, high-impact stands with demo space
  • Everything in Custom, plus:
  • Large-scale custom build
  • Double-height feature elements
  • Full AV & feature lighting
  • Demo / hospitality area
  • Priority in-house build slot
Get a quote
Double-Decker / Pavilion
100+ sqm
From
AED 3,200 / sqm
Best for: flagship presence and country pavilions
  • Everything in Premium, plus:
  • Two-storey engineered build
  • VIP lounge & meeting rooms
  • Certified structural sign-off
  • Country-pavilion capable to 1,500 sqm
Get a quote

Not included: venue space rental (paid to the organiser), and venue electrical & rigging orders (we place these at the advance rate on your behalf and bill at cost). Bespoke add-ons are quoted line by line, so the number you sign is the number you pay.

Case Studies

Real briefs. Real results.

See how brands turn raw floor space into a working show presence — every project handed over to a documented client sign-off.

Explore all case studies →
Field Notes

Build notes for Dubai World Trade Centre

The detail that isn’t in the exhibitor manual — from the people who build here.

CD
Carlos Dalè
General Manager, SOL Dubai · oversees stand design and build to venue rules across Dubai, Abu Dhabi and Riyadh
01

Permit to Build gates everything — file the structural calcs early

At DWTC nothing gets built without a Permit to Build, and for any complex or double-deck stand that permit depends on structural calculations clearing the DWTC engineer. We submit on Organiser+ the week the design is signed off — a late structural file, not the build, is what most often delays a stand.

02

Mains power is DWTC’s to supply — order it, don’t wire it

All mains electrical comes from DWTC’s official contractor and is ordered in advance. We book power — including 24-hour supply where a stand needs it — at the advance rate so nothing is sitting dead on opening morning.

03

Finish in the workshop — Perspex won’t pass

Only fire-retardant materials are allowed and Perspex is specifically prohibited (we use Lexan or Macralon). We complete and inspect every finish at our workshop, so the on-site crew assembles an approved build instead of fabricating in the hall.

04

Lock the slot early

DWTC’s calendar is packed, so build-up slots, rigging and power book out and late orders cost more. We secure your space-only window and order services at the advance rate.

Common mistakes, in order of frequency

  1. An oversized logo on the back wall that crowds out the one-line proposition a buyer reads in three seconds.
  2. The same graphic on the front and side panels of an inline stand — the aisle-facing side panel is your most wasted surface.
  3. A counter or sign at the very front that blocks the sightline into the stand and stops buyers stepping in.
  4. Under-ordering power — no 24-hour supply for fridges, screens or live demos, so the stand isn’t ready on opening morning.
  5. Leaving structural, rigging and electrical orders until after the venue deadlines and paying avoidable surcharges.
FAQ

GESS Dubai 2026 stand questions, answered

Real answers with real numbers — including the venue’s build rules. Click any question to expand.

When and where is GESS Dubai 2026?
GESS Dubai 2026 takes place from 10 to 12 November 2026 at Dubai World Trade Centre, in the Sheikh Saeed Halls. Opening hours are 10am–6pm on 10 and 11 November and 10am–5pm on 12 November.
Who visits GESS Dubai?
Teachers, principals and school leaders, EdTech leaders, education suppliers and investors. Many visitors also attend the free CPD-accredited conference running alongside the exhibition.
How much does a GESS Dubai stand cost?
A full-service GESS Dubai stand starts from AED 950/sqm for a modular build, AED 1,650/sqm for a bespoke custom stand, AED 2,400/sqm for large premium builds and AED 3,200/sqm for double-decker and pavilion builds. Prices are approximate starting points; every quote is fixed and itemised with a free 3D concept.
How far ahead should we book a stand for GESS Dubai?
We recommend starting 8–14 weeks before the show for a custom stand, and earlier for a double-decker or pavilion, because the venue’s structural approval and permits come first. A modular stand with custom graphics needs less lead time. Send us your hall and stand size and we will set out a timeline that fits your dates.
Can you build hands-on EdTech demo points?
Yes. We plan each demo point around its device — interactive panels at classroom height, secure tablet holders, clear floor for VR — with power and data run under a raised floor so no cables cross the aisle.
Can you build a sample classroom or early-years zone on our stand?
Yes. Learning-space, furniture and early-years exhibitors often show their products in a built setting. We choose flooring, finishes and lighting to suit, with rounded edges and stable fixings where children’s products are handled.
How do we keep demos from drowning each other out?
We separate audio-heavy demos from meeting space, use directional speakers or headphones where needed, and add soft finishes that reduce hall noise.
We are speaking at the conference or pitching at Startup Spotlight. Should the stand reflect that?
It should. We can add a screen for your session topic, a clear meeting point for people who saw your talk and space for literature or QR-linked resources, so the session turns into follow-up conversations.
Who handles the Dubai World Trade Centre permits and approvals?
We do, start to finish. Every stand at DWTC needs a Stand Permit to Build, and complex or double-deck stands need structural calculations cleared by the DWTC engineer first. We prepare the drawings, submit them and manage the approval.
How is power and internet arranged for screens and devices?
Mains power at DWTC is supplied by the venue’s official electrical contractor and ordered in advance. We design the power and data scheme for every screen and device on your stand and place the orders at the advance rate.
Do you build double-decker stands at GESS Dubai?
Yes. A two-storey stand adds an upstairs meeting floor above an open demo area. It needs certified structural calculations, a displayed maximum-occupancy figure and code-compliant staircases. We engineer, certify and build it in-house.
What’s included in a full-service GESS Dubai stand?
Custom 3D design, in-house fabrication and pre-build, full graphics, delivery to Dubai World Trade Centre, install and dismantle, the DWTC Permit to Build and H&S paperwork, electrical and rigging ordered on your behalf, and a dedicated project manager. Venue space rental is paid to the organiser and is not included.
Do you provide on-site support during GESS Dubai?
Yes. Our team is on call across all three show days for anything from a graphic touch-up to a screen or electrical fix, and larger stands get a dedicated on-site project lead.
What happens to the stand after the show?
We dismantle and clear the space, return your products and devices or hand them to your logistics agent, and can store reusable stand elements for your next edition so you are not paying to rebuild from scratch.
More Shows

More education shows we build for

Other shows our in-house team designs and builds for, with the same full-service service and full venue handling.

See the full show calendar

Get your GESS Dubai 2026 stand quote in 48 hours

Custom 3D rendering and all-inclusive pricing, designed to Dubai World Trade Centre’s rules with structural sign-off built into the timeline. We build in-house and install on site — the stand you approve in the rendering is the stand that opens.

Request a free quote
Live now