Skip to content
Home › Shows › Construction & Industrial › The Mining Show 2026
Dubai · DWTCConstruction & Industrial

The Mining Show 2026 Exhibition Stand Design & Build (DWTC)

Full-service custom stands for The Mining Show 2026 at Dubai World Trade Centre — design, in-house build, the DWTC Permit to Build and H&S paperwork, install and on-stand support. Built for suppliers and operators meeting mining buyers and regulators.

Custom exhibition stand designed and built by SOL Dubai at Dubai World Trade Centre
★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★16–17 Nov 2026Next edition★Construction & IndustrialAudience★2 daysDuration★48 hoursQuote turnaround★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★16–17 Nov 2026Next edition★Construction & IndustrialAudience★2 daysDuration★48 hoursQuote turnaround

The Mining Show 2026 at a glance

The Mining Show is a two-day mining conference and exhibition organised by Terrapinn at Dubai World Trade Centre (DWTC). The 2026 edition runs on 16–17 November 2026 in Sheikh Saeed Halls 2 & 3. Terrapinn bills it as “the MENA, Central Asian and the Subcontinent’s biggest mining conference and exhibition”.

The programme covers mineral exploration, mining codes and regulation, and operational development. The exhibition connects mining operators, government bodies, and equipment and service suppliers with buyers from across the Middle East and North Africa, Central Asia and South Asia. The 2026 exhibitor list includes government participation, among them the UAE Ministry of Energy & Infrastructure, alongside suppliers of equipment, drilling, explosives and blasting, processing and mining services.

The visitors are mining operators, government ministries and regulators, investors, and equipment and service suppliers. Two days is a short show, so every hour on the stand matters. As a Dubai-based stand builder working at DWTC as our home venue, SOL Dubai knows the Sheikh Saeed Halls and their build-up routines well.

What a Mining Show stand has to do

Mining is a business of large, long-term contracts, and the people at this show are often the ones who award them or regulate them. A stand has to do two jobs. First, it must show in a few seconds what you do and where you operate: a clear statement of your equipment, service or project, and the regions you serve, readable from the aisle. Second, it must give space for the serious conversations that follow, about project scope, site conditions, compliance and finance.

Government and ministry stands have a different job again. Their aim is often to present a country’s mineral potential, licensing system and investment terms to operators and investors. That calls for maps, data and clear explanations of the regulatory process, presented in a way an investor can absorb quickly, plus a meeting area where officials can sit down with interested companies. We design both kinds of stand.

Our Mining Show stand build process

Every Dubai project runs through our eight-stage process, handled start to finish in-house:

  1. Discovery and brief — we list the equipment, samples and models you will show, their sizes, weights and power needs, your meeting requirements and budget, and confirm hall, stand number and dimensions in Sheikh Saeed Halls 2 & 3.
  2. Concept and 3D design — photorealistic visuals and a floor plan with a clear product or project zone at the front and meeting space behind.
  3. Costing and approval — a fixed, fully itemised quotation covering structure, display plinths, power, AV and logistics.
  4. Venue approvals and technical drawings — structural, electrical, floor-loading and rigging submissions prepared for DWTC approval.
  5. Fabrication — walls, plinths, display cases, joinery and graphics built and quality-checked in our own workshop.
  6. Pre-build and QA — trial assembly with samples and screens fitted, so the hall build is assembly, not fabrication.
  7. On-site installation — supervised build at DWTC during official build-up, with any heavy equipment move-in scheduled.
  8. Show-day support and dismantling — standby team on call, then dismantling and return or storage of your samples and stand.

Showing heavy equipment, samples and models

Mining equipment is big, and most of it will never fit through a hall door. Exhibitors usually bring a mix of smaller real items, such as drill bits, wear parts, pumps, sensors and consumables, and scale models or video for the machines too large to ship. We build plinths and frames sized for the weight of each item and fix them mechanically, and check floor-loading limits wherever a heavy piece sits. Anything that arrives on a pallet or truck is scheduled into the build-up timetable.

Core samples, ore and mineral specimens make strong displays when they are shown properly. We build lit display cases and trays that show texture and colour, with short labels on origin and grade where you can share them. Scale models of mines, processing plants or equipment benefit from a clear case and a screen nearby showing the real site. All materials are fire-retardant to DWTC rules, and finishes are completed in our workshop.

Presenting services, explosives and processing

Many exhibitors sell services rather than machines: exploration, drilling contracts, blasting, processing, logistics, consulting or digital tools. For them, the stand has to make capability visible. We build around large screens or an LED wall showing site footage, project maps and results, with a demo counter for software and a meeting table for technical discussion.

Explosives and blasting suppliers usually present their products through inert samples, cutaway products, models and video rather than the real thing. We agree with you early what will be on the stand, plan the display around it and keep it factual. Processing and consumables suppliers often benefit from a simple flow diagram on the back wall, showing where each product fits in the process from pit to plant, which helps a visitor see the full offer at a glance.

Making two show days count

With only two days, The Mining Show leaves little time to recover from a slow start. We hand stands over show-ready before opening so your team can focus on visitors from the first hour. A small lockable store for samples, literature and personal items, charging points for tablets and phones, and enough seating for longer meetings all help the team work through both days without interruptions.

Plan the visitor journey in advance. Many operators and investors will arrive with meetings already booked, so a clearly signed meeting area and a visible greeter at the front make sure scheduled guests are not lost among walk-in traffic. A screen with a short loop on your key projects gives people something to watch while they wait. Follow-up material, whether printed sheets or a QR code to technical data, should be easy to take away.

Booking lead times

For a custom stand at DWTC we recommend starting 8–14 weeks before the show, and earlier for a double-decker or a large pavilion, because the venue’s technical approval and permits come before any building starts. A modular stand with custom graphics needs less lead time. Send us your hall, stand size and show dates and we will set out a build timeline that fits them.

The steps are the same for every show. We agree the brief and budget, then send 3D concepts and a costed quote. Once the design is approved we prepare the structural drawings and submit them to the organiser and DWTC for approval. Fabrication runs in our workshop alongside that approval, so the stand is built and checked before move-in. On site we handle the build, power and furniture, stay on call through the open days, and take everything down and clear the space at the end.

Stand options and pricing

We build every Mining Show format. Modular stands suit service companies and first-time exhibitors who need clean branding, a screen and a meeting point. Custom stands give equipment suppliers and operators a bespoke layout with plinths, display cases and meeting space. Country pavilions suit ministries and national groups presenting a country’s mining sector under one identity.

Indicative starting prices are from AED 950/sqm for modular, from AED 1,650/sqm for custom, from AED 2,400/sqm for premium builds and from AED 3,200/sqm for double-decker and pavilion builds. The final figure depends on size, structure, the weight of items on display, AV and branding. Every quotation is fixed and itemised, so the price you approve is the price you pay.

Why mining and industrial brands choose SOL Dubai

We are a Dubai-based exhibition stand builder with our own workshop in Al Quoz, working at DWTC as our home venue. We handle Mining Show stands start to finish: design, fabrication, the venue approvals, equipment logistics and on-site installation. Heavy, product-led stands with meeting space are exactly the kind of work our in-house team is set up for.

Clients get workshop-built quality, a single accountable team and a price that holds from quotation to final invoice. If you also exhibit at industrial or construction shows in the Gulf, we can carry your stand design across them.

Building at Dubai World Trade Centre: the rules that shape your The Mining Show 2026 stand

The Mining Show 2026 is governed by the Dubai World Trade Centre’s own technical regulations. Get them right and your stand goes up cleanly; miss a submission and you lose build time, not just money. We design to all of this from the first sketch and file the paperwork for you.

Permit to Build

Every stand needs a DWTC Stand Permit to Build (PTB) before construction. We prepare and submit it so your build is cleared to start on day one of build-up.

Height & “complex” structures

Standard custom builds work to around 4m. Taller builds and anything DWTC classes as complex — double-deckers, long spans, or stands where the travel distance to an exit exceeds 10m — trigger structural-engineer clearance through DWTC’s Organiser+ portal before the Permit to Build is released, and the engineer can halt an unsafe build on site.

Double-deckers

A two-storey stand needs certified structural calculations, a Double-Deck health-and-safety declaration, a displayed maximum-occupancy figure and code-compliant staircases — at least 1m wide with handrails, and a second staircase once an upper deck passes ~200 sqm or sits over 25m from the stairs.

Electrical power

All mains power is supplied by DWTC’s official Electrical Contractor and ordered in advance — you can’t self-wire mains. We design the scheme and order it, including 24-hour power where your stand needs it.

Rigging & suspended elements

Banners and lighting rigs hung from the hall are subject to DWTC approval and load limits and ordered ahead of tenancy. We prepare and file the rigging submission on time.

Fixings & fire-safe materials

Nothing may be fixed to the floors, walls, ceilings or structural steel, and all materials must be fire-retardant — Perspex is prohibited (Lexan and Macralon are accepted). We complete and inspect finishes in our workshop, so the on-site crew assembles an approved build.

Accreditation & deadlines

Every contractor needs a DWTC Contractor+ digital badge and PPE is mandatory. Structural, rigging and electrical submissions run weeks ahead of build-up, and late orders attract surcharges — we manage the badges and the deadlines.

Recent Builds

Recent builds from our workshop

Real stands designed and built by our in-house team. Every stand is pre-built and inspected before it ships to Dubai World Trade Centre.

SOL Dubai custom stand, built in our Dubai workshop
Custom stand · SOL Dubai
SOL Dubai island stand, built in our Dubai workshop
Island stand · SOL Dubai
SOL Dubai double-decker, built in our Dubai workshop
Double-decker · SOL Dubai
SOL Dubai feature-lit, built in our Dubai workshop
Feature-lit · SOL Dubai
SOL Dubai bespoke build, built in our Dubai workshop
Bespoke build · SOL Dubai
SOL Dubai country pavilion, built in our Dubai workshop
Country pavilion · SOL Dubai
View our full portfolio
Transparent Pricing

The Mining Show 2026 stand pricing — all-inclusive

One quote covers design, in-house build, graphics, delivery, install, dismantle and venue paperwork — fixed and itemised, with a free 3D concept before you commit.

Modular
9–18 sqm
From
AED 950 / sqm
Best for: first-time and value-focused exhibitors
  • Reusable system structure
  • Custom-printed graphics
  • LED lighting & furniture
  • Delivery, install & dismantle
  • Venue paperwork handled
Get a quote
Premium
50–100 sqm
From
AED 2,400 / sqm
Best for: large, high-impact stands with demo space
  • Everything in Custom, plus:
  • Large-scale custom build
  • Double-height feature elements
  • Full AV & feature lighting
  • Demo / hospitality area
  • Priority in-house build slot
Get a quote
Double-Decker / Pavilion
100+ sqm
From
AED 3,200 / sqm
Best for: flagship presence and country pavilions
  • Everything in Premium, plus:
  • Two-storey engineered build
  • VIP lounge & meeting rooms
  • Certified structural sign-off
  • Country-pavilion capable to 1,500 sqm
Get a quote

Not included: venue space rental (paid to the organiser), and venue electrical & rigging orders (we place these at the advance rate on your behalf and bill at cost). Bespoke add-ons are quoted line by line, so the number you sign is the number you pay.

Case Studies

Real briefs. Real results.

See how brands turn raw floor space into a working show presence — every project handed over to a documented client sign-off.

Explore all case studies →
Field Notes

Build notes for Dubai World Trade Centre

The detail that isn’t in the exhibitor manual — from the people who build here.

CD
Carlos Dalè
General Manager, SOL Dubai · oversees stand design and build to venue rules across Dubai, Abu Dhabi and Riyadh
01

Permit to Build gates everything — file the structural calcs early

At DWTC nothing gets built without a Permit to Build, and for any complex or double-deck stand that permit depends on structural calculations clearing the DWTC engineer. We submit on Organiser+ the week the design is signed off — a late structural file, not the build, is what most often delays a stand.

02

Mains power is DWTC’s to supply — order it, don’t wire it

All mains electrical comes from DWTC’s official contractor and is ordered in advance. We book power — including 24-hour supply where a stand needs it — at the advance rate so nothing is sitting dead on opening morning.

03

Finish in the workshop — Perspex won’t pass

Only fire-retardant materials are allowed and Perspex is specifically prohibited (we use Lexan or Macralon). We complete and inspect every finish at our workshop, so the on-site crew assembles an approved build instead of fabricating in the hall.

04

Lock the slot early

DWTC’s calendar is packed, so build-up slots, rigging and power book out and late orders cost more. We secure your space-only window and order services at the advance rate.

Common mistakes, in order of frequency

  1. An oversized logo on the back wall that crowds out the one-line proposition a buyer reads in three seconds.
  2. The same graphic on the front and side panels of an inline stand — the aisle-facing side panel is your most wasted surface.
  3. A counter or sign at the very front that blocks the sightline into the stand and stops buyers stepping in.
  4. Under-ordering power — no 24-hour supply for fridges, screens or live demos, so the stand isn’t ready on opening morning.
  5. Leaving structural, rigging and electrical orders until after the venue deadlines and paying avoidable surcharges.
FAQ

The Mining Show 2026 stand questions, answered

Real answers with real numbers — including the venue’s build rules. Click any question to expand.

When and where is The Mining Show 2026?
The Mining Show 2026 takes place on 16 and 17 November 2026 at Dubai World Trade Centre, in Sheikh Saeed Halls 2 & 3. It is organised by Terrapinn.
Who visits The Mining Show?
Mining operators, government ministries and regulators, investors, and equipment and service suppliers from the Middle East and North Africa, Central Asia and South Asia.
What does the show cover?
Mineral exploration, mining codes and regulation, and operational development, with exhibitors in equipment, drilling, explosives and blasting, processing and mining services, plus government participation.
How much does a Mining Show stand cost?
A full-service Mining Show stand starts from AED 950/sqm for a modular build, AED 1,650/sqm for a bespoke custom stand, AED 2,400/sqm for large premium builds and AED 3,200/sqm for double-decker and pavilion builds. Prices are approximate starting points; every quote is fixed and itemised with a free 3D concept.
How far ahead should we book a stand for The Mining Show?
We recommend starting 8–14 weeks before the show for a custom stand, and earlier for a double-decker or pavilion, because the venue’s structural approval and permits come first. A modular stand with custom graphics needs less lead time. Send us your hall and stand size and we will set out a timeline that fits your dates.
Can you display heavy equipment and parts?
Yes. We build plinths and frames sized for each item’s weight, fix them mechanically, check floor-loading limits and schedule any heavy deliveries into the build-up timetable. Machines too large for the hall are best shown as scale models or video.
How should we show core samples and minerals?
In lit display cases or trays that show texture and colour, with short labels on origin and grade where you can share them. We build these in our workshop.
Can you build a stand for a ministry or national mining authority?
Yes. We design government and country stands that present mineral potential, licensing and investment terms clearly, with maps, data screens and a meeting area for investor discussions.
Who handles the Dubai World Trade Centre permits and approvals?
We do, start to finish. Every stand at DWTC needs a Stand Permit to Build, and complex or double-deck stands need structural calculations cleared by the DWTC engineer first. We prepare the drawings, submit them and manage the approval.
How is power arranged for screens and equipment?
Mains power at DWTC is supplied by the venue’s official electrical contractor and ordered in advance. We design what your stand needs and place the orders at the advance rate.
Do you build double-decker stands at The Mining Show?
Yes. A two-storey stand adds an upstairs meeting floor above an open display. It needs certified structural calculations, a displayed maximum-occupancy figure and code-compliant staircases. We engineer, certify and build it in-house.
What’s included in a full-service Mining Show stand?
Custom 3D design, in-house fabrication and pre-build, full graphics, delivery to Dubai World Trade Centre, install and dismantle, the DWTC Permit to Build and H&S paperwork, electrical and rigging ordered on your behalf, and a dedicated project manager. Venue space rental is paid to the organiser and is not included.
Do you provide on-site support during The Mining Show?
Yes. Our team is on call across both show days for anything from a graphic touch-up to an electrical fix, and larger stands get a dedicated on-site project lead.
What happens to the stand and samples after the show?
We dismantle and clear the space, return your samples or hand them to your logistics agent, and can store reusable stand elements for your next edition so you are not paying to rebuild from scratch.
More Shows

More construction & industrial shows we build for

Other shows our in-house team designs and builds for, with the same full-service service and full venue handling.

See the full show calendar

Get your The Mining Show 2026 stand quote in 48 hours

Custom 3D rendering and all-inclusive pricing, designed to Dubai World Trade Centre’s rules with structural sign-off built into the timeline. We build in-house and install on site — the stand you approve in the rendering is the stand that opens.

Request a free quote
Live now