Skip to content
Home › Shows › Education › Najah Dubai 2027
Dubai · DWTCEducation

Najah Dubai 2027 Exhibition Stand Design & Build (DWTC)

Full-service stands for Najah Dubai 2027 at Dubai World Trade Centre — design, in-house build, the DWTC Permit to Build and H&S paperwork, install and on-stand support. Built to help universities and colleges talk to more students and parents.

Custom exhibition stand designed and built by SOL Dubai at Dubai World Trade Centre
★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★2027 — dates TBCNext edition★EducationAudience★3 days (2026)Duration★48 hoursQuote turnaround★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★2027 — dates TBCNext edition★EducationAudience★3 days (2026)Duration★48 hoursQuote turnaround

Najah Dubai 2027 at a glance

Najah Dubai, part of the Najah Expo series, is a higher-education fair for students weighing university and study-abroad options. It is organised by Informa Connect and supported by the UAE Ministry of Education, and has been held at Dubai World Trade Centre (DWTC). The 2026 edition ran for three days, 25–27 October 2026. The organiser has not yet announced dates for 2027, so this page will be updated as soon as they are confirmed.

The 2026 edition brought together more than 100 universities from over 20 countries, with more than 30 seminar sessions on admissions, scholarships and career planning. Exhibitors include universities and colleges, embassies and education bodies, vocational training institutes, education consultants, language centres, student accommodation and service providers, and postgraduate programmes, with country pavilions for the USA, Canada, the UK, Europe and Asia. AI and robotics courses and work-study programmes also feature.

The visitors are school and university students, parents, teachers and school groups, with morning slots set aside for school groups, plus postgraduate applicants. As a Dubai-based stand builder working at DWTC as our home venue, SOL Dubai knows these halls well.

What a Najah stand has to do

Najah is a fair where the visitor is usually a teenager with a parent at their side, and both are comparing many institutions in one afternoon. The stand has to answer three questions from the aisle: who you are, where you are, and what you teach. A clear university name, the city and country, and a short list of the subject areas students care about most should be readable from several metres away.

After that, the stand has to turn interest into an application. That means enough counter space and seating for one-to-one advice, because students ask detailed questions about entry requirements, fees, scholarships and accommodation, and parents want to talk about safety and costs. It also means a fast way to capture details, such as a tablet station or a QR code linked to your enquiry form, so a busy hour does not end with a pile of unread paper forms. The seminar programme helps here too: students who have just heard a talk on scholarships or admissions often come straight to the stands with specific questions, so advisers need to be ready and visible.

Our Najah stand build process

Every Dubai project runs through our eight-stage process, handled start to finish in-house:

  1. Discovery and brief — we agree how many advisers will staff the stand, which programmes you will promote, your enquiry-capture method and budget, and confirm the stand number and dimensions once the 2027 floor plan is out.
  2. Concept and 3D design — visuals and a floor plan built around advice counters, seating and clear institutional branding.
  3. Costing and approval — a fixed, fully itemised quotation covering structure, furniture, power, screens and logistics.
  4. Venue approvals and technical drawings — structural and electrical submissions prepared for DWTC approval.
  5. Fabrication — walls, counters, joinery and graphics built and quality-checked in our own workshop.
  6. Pre-build and QA — trial assembly so fixings, screens and finishes are proven before build-up.
  7. On-site installation — supervised build at DWTC during official build-up, handed over show-ready.
  8. Show-day support and dismantling — standby team on call, then dismantling and storage of reusable elements for your next fair.

Layouts that handle school groups and family visits

Traffic at Najah comes in waves. School groups arrive together in the morning slots, so a stand can go from quiet to twenty students in a minute. We design an open front that a group can gather around without blocking the aisle, with a screen or large graphic that one adviser can talk to while colleagues take individual questions at the sides.

Later in the day the visitors are families, and the conversations are longer. A few stools at a high counter work well for quick questions, and a small table with chairs lets a parent sit down for a proper talk about fees and scholarships. We keep literature in easy reach so students can pick up a prospectus without having to ask, and place a lockable store behind the wall for bags, spare brochures and giveaways. Small stands benefit from these details as much as large ones.

Branding for universities and country pavilions

A university’s brand is often its campus. Large-format images of buildings, students and the city sell the experience of studying there better than slogans, so we print them at high resolution on fabric or rigid panels and light them evenly. Crests, colours and typefaces follow your brand guidelines exactly; we can work directly with your marketing office or your local representative in Dubai.

Najah also has country pavilions, where several institutions from one country exhibit together. A pavilion needs a shared identity that tells visitors which country they are in, and individual counters that give each institution its own space and name. We design and build country pavilions as one project, with a single approval package and one project manager for the organising body, and consistent counters so no member feels short-changed.

Reusing your stand across the Najah calendar

Najah runs several editions in the region. Alongside Najah Dubai, the organiser’s calendar includes Najah Al Ain at ADNEC Al Ain, Najah Doha at QNCC in Qatar and Najah Abu Dhabi at ADNEC. Many universities and consultancies recruit at more than one of them in the same season. A stand designed as a modular kit, with graphics that can be swapped and counters that can be rearranged, can be used again at other fairs in the UAE rather than built from scratch each time.

We store reusable stand elements in our Al Quoz workshop between shows, check and refresh them before each event, and update graphics when intake dates, rankings or programmes change. For institutions on a tight budget this is often the best value route: invest once in a well-made stand and pay mainly for transport, installation and fresh print for each later fair.

Booking lead times

For a custom stand at DWTC we recommend starting 8–14 weeks before the show, and earlier for a double-decker or a large pavilion, because the venue’s technical approval and permits come before any building starts. A modular stand with custom graphics needs less lead time. Send us your hall, stand size and show dates and we will set out a build timeline that fits them.

The steps are the same for every show. We agree the brief and budget, then send 3D concepts and a costed quote. Once the design is approved we prepare the structural drawings and submit them to the organiser and DWTC for approval. Fabrication runs in our workshop alongside that approval, so the stand is built and checked before move-in. On site we handle the build, power and furniture, stay on call through the open days, and take everything down and clear the space at the end.

Stand options and pricing

We build every Najah format. Modular stands suit most universities and consultancies: clean branding, a counter, seating and storage, and they can be reused at later fairs. Custom stands give larger institutions a bespoke layout with screens, consultation areas and campus imagery. Pavilion builds bring several institutions from one country together under one identity.

Indicative starting prices are from AED 950/sqm for modular, from AED 1,650/sqm for custom, from AED 2,400/sqm for premium builds and from AED 3,200/sqm for pavilion builds. The final figure depends on size, structure, screens, furniture and branding. Every quotation is fixed and itemised, so the price you approve is the price you pay.

Why education exhibitors choose SOL Dubai

We are a Dubai-based exhibition stand builder with our own workshop in Al Quoz, working at DWTC as our home venue. We handle Najah stands start to finish: design, fabrication, the venue approvals and on-site installation, with storage between fairs. Institutions that exhibit overseas can send us their brand guidelines and leave the local work to us.

Clients get workshop-built quality, a single accountable team and a price that holds from quotation to final invoice. Education suppliers selling to schools rather than students may also want to look at GESS Dubai, which we build for too.

Building at Dubai World Trade Centre: the rules that shape your Najah Dubai 2027 stand

Najah Dubai 2027 is governed by the Dubai World Trade Centre’s own technical regulations. Get them right and your stand goes up cleanly; miss a submission and you lose build time, not just money. We design to all of this from the first sketch and file the paperwork for you.

Permit to Build

Every stand needs a DWTC Stand Permit to Build (PTB) before construction. We prepare and submit it so your build is cleared to start on day one of build-up.

Height & “complex” structures

Standard custom builds work to around 4m. Taller builds and anything DWTC classes as complex — double-deckers, long spans, or stands where the travel distance to an exit exceeds 10m — trigger structural-engineer clearance through DWTC’s Organiser+ portal before the Permit to Build is released, and the engineer can halt an unsafe build on site.

Double-deckers

A two-storey stand needs certified structural calculations, a Double-Deck health-and-safety declaration, a displayed maximum-occupancy figure and code-compliant staircases — at least 1m wide with handrails, and a second staircase once an upper deck passes ~200 sqm or sits over 25m from the stairs.

Electrical power

All mains power is supplied by DWTC’s official Electrical Contractor and ordered in advance — you can’t self-wire mains. We design the scheme and order it, including 24-hour power where your stand needs it.

Rigging & suspended elements

Banners and lighting rigs hung from the hall are subject to DWTC approval and load limits and ordered ahead of tenancy. We prepare and file the rigging submission on time.

Fixings & fire-safe materials

Nothing may be fixed to the floors, walls, ceilings or structural steel, and all materials must be fire-retardant — Perspex is prohibited (Lexan and Macralon are accepted). We complete and inspect finishes in our workshop, so the on-site crew assembles an approved build.

Accreditation & deadlines

Every contractor needs a DWTC Contractor+ digital badge and PPE is mandatory. Structural, rigging and electrical submissions run weeks ahead of build-up, and late orders attract surcharges — we manage the badges and the deadlines.

Recent Builds

Recent builds from our workshop

Real stands designed and built by our in-house team. Every stand is pre-built and inspected before it ships to Dubai World Trade Centre.

SOL Dubai custom stand, built in our Dubai workshop
Custom stand · SOL Dubai
SOL Dubai island stand, built in our Dubai workshop
Island stand · SOL Dubai
SOL Dubai double-decker, built in our Dubai workshop
Double-decker · SOL Dubai
SOL Dubai feature-lit, built in our Dubai workshop
Feature-lit · SOL Dubai
SOL Dubai bespoke build, built in our Dubai workshop
Bespoke build · SOL Dubai
SOL Dubai country pavilion, built in our Dubai workshop
Country pavilion · SOL Dubai
View our full portfolio
Transparent Pricing

Najah Dubai 2027 stand pricing — all-inclusive

One quote covers design, in-house build, graphics, delivery, install, dismantle and venue paperwork — fixed and itemised, with a free 3D concept before you commit.

Modular
9–18 sqm
From
AED 950 / sqm
Best for: first-time and value-focused exhibitors
  • Reusable system structure
  • Custom-printed graphics
  • LED lighting & furniture
  • Delivery, install & dismantle
  • Venue paperwork handled
Get a quote
Premium
50–100 sqm
From
AED 2,400 / sqm
Best for: large, high-impact stands with demo space
  • Everything in Custom, plus:
  • Large-scale custom build
  • Double-height feature elements
  • Full AV & feature lighting
  • Demo / hospitality area
  • Priority in-house build slot
Get a quote
Double-Decker / Pavilion
100+ sqm
From
AED 3,200 / sqm
Best for: flagship presence and country pavilions
  • Everything in Premium, plus:
  • Two-storey engineered build
  • VIP lounge & meeting rooms
  • Certified structural sign-off
  • Country-pavilion capable to 1,500 sqm
Get a quote

Not included: venue space rental (paid to the organiser), and venue electrical & rigging orders (we place these at the advance rate on your behalf and bill at cost). Bespoke add-ons are quoted line by line, so the number you sign is the number you pay.

Case Studies

Real briefs. Real results.

See how brands turn raw floor space into a working show presence — every project handed over to a documented client sign-off.

Explore all case studies →
Field Notes

Build notes for Dubai World Trade Centre

The detail that isn’t in the exhibitor manual — from the people who build here.

CD
Carlos Dalè
General Manager, SOL Dubai · oversees stand design and build to venue rules across Dubai, Abu Dhabi and Riyadh
01

Permit to Build gates everything — file the structural calcs early

At DWTC nothing gets built without a Permit to Build, and for any complex or double-deck stand that permit depends on structural calculations clearing the DWTC engineer. We submit on Organiser+ the week the design is signed off — a late structural file, not the build, is what most often delays a stand.

02

Mains power is DWTC’s to supply — order it, don’t wire it

All mains electrical comes from DWTC’s official contractor and is ordered in advance. We book power — including 24-hour supply where a stand needs it — at the advance rate so nothing is sitting dead on opening morning.

03

Finish in the workshop — Perspex won’t pass

Only fire-retardant materials are allowed and Perspex is specifically prohibited (we use Lexan or Macralon). We complete and inspect every finish at our workshop, so the on-site crew assembles an approved build instead of fabricating in the hall.

04

Lock the slot early

DWTC’s calendar is packed, so build-up slots, rigging and power book out and late orders cost more. We secure your space-only window and order services at the advance rate.

Common mistakes, in order of frequency

  1. An oversized logo on the back wall that crowds out the one-line proposition a buyer reads in three seconds.
  2. The same graphic on the front and side panels of an inline stand — the aisle-facing side panel is your most wasted surface.
  3. A counter or sign at the very front that blocks the sightline into the stand and stops buyers stepping in.
  4. Under-ordering power — no 24-hour supply for fridges, screens or live demos, so the stand isn’t ready on opening morning.
  5. Leaving structural, rigging and electrical orders until after the venue deadlines and paying avoidable surcharges.
FAQ

Najah Dubai 2027 stand questions, answered

Real answers with real numbers — including the venue’s build rules. Click any question to expand.

When and where is Najah Dubai 2027?
The organiser has not yet announced the 2027 dates. The 2026 edition ran from 25 to 27 October 2026 at Dubai World Trade Centre, organised by Informa Connect with the support of the UAE Ministry of Education. We will update this page when the 2027 dates are confirmed.
How big is Najah Dubai?
The 2026 edition had more than 100 universities from over 20 countries and more than 30 seminar sessions. The organiser did not publish a visitor total.
Who visits Najah Dubai?
School and university students, parents, teachers and school groups — morning slots are reserved for school groups — and postgraduate applicants.
How much does a Najah Dubai stand cost?
A full-service Najah Dubai stand starts from AED 950/sqm for a modular build, AED 1,650/sqm for a bespoke custom stand, AED 2,400/sqm for large premium builds and AED 3,200/sqm for pavilion builds. Prices are approximate starting points; every quote is fixed and itemised with a free 3D concept.
How far ahead should we book a stand for Najah Dubai?
We recommend starting 8–14 weeks before the show for a custom stand, and earlier for a double-decker or pavilion, because the venue’s structural approval and permits come first. A modular stand with custom graphics needs less lead time. Send us your hall and stand size and we will set out a timeline that fits your dates.
Can you build a country pavilion for several universities?
Yes. We design a shared national identity with individual counters for each institution, and run approvals and logistics as one project with one project manager.
Can we reuse our stand at other Najah fairs?
Yes. We can design your stand as a modular kit with swappable graphics, store it in our Al Quoz workshop and set it up again at other UAE fairs, so later events cost mainly transport, install and new print.
How do we handle school groups arriving all at once?
We design an open front a group can gather around, with a screen or large graphic for one adviser to present, while colleagues take individual questions at side counters.
How should we capture student enquiries on the stand?
Most institutions use tablet stations or QR codes linked to their enquiry form. We build in tablet holders, charging points and clear signage so details are captured quickly at busy times.
Who handles the Dubai World Trade Centre permits and approvals?
We do, start to finish. Every stand at DWTC needs a Stand Permit to Build, and complex structures need structural calculations cleared by the DWTC engineer first. We prepare the drawings, submit them and manage the approval.
How is power arranged for screens and tablets?
Mains power at DWTC is supplied by the venue’s official electrical contractor and ordered in advance. We design what your stand needs and place the orders at the advance rate.
Do you build double-decker stands at Najah Dubai?
We can, but most Najah stands do not need one. A two-storey stand needs certified structural calculations, a displayed maximum-occupancy figure and code-compliant staircases, and we engineer and build it in-house when a large institution or pavilion wants the extra space.
What’s included in a full-service Najah Dubai stand?
Custom 3D design, in-house fabrication and pre-build, full graphics, delivery to Dubai World Trade Centre, install and dismantle, the DWTC Permit to Build and H&S paperwork, electrical ordered on your behalf, and a dedicated project manager. Venue space rental is paid to the organiser and is not included. Our team is on call across the show days for any fixes.
What happens to the stand after the show?
We dismantle and clear the space, and can store reusable stand elements in our workshop for your next fair so you are not paying to rebuild from scratch.
More Shows

More education shows we build for

Other shows our in-house team designs and builds for, with the same full-service service and full venue handling.

See the full show calendar

Get your Najah Dubai 2027 stand quote in 48 hours

Custom 3D rendering and all-inclusive pricing, designed to Dubai World Trade Centre’s rules with structural sign-off built into the timeline. We build in-house and install on site — the stand you approve in the rendering is the stand that opens.

Request a free quote
Live now