Skip to content
Home › Shows › Energy & Sustainability › World Green Economy Summit 2027
Dubai · DWTCEnergy & Sustainability

World Green Economy Summit 2027 Stand Design & Build (DWTC)

Sponsor stands, lounges and brand activations for the World Green Economy Summit 2027 at Dubai World Trade Centre — design, in-house build, the DWTC Permit to Build and H&S paperwork, install and on-site support. Built for a summit where every conversation is with a decision-maker.

Custom exhibition stand designed and built by SOL Dubai at Dubai World Trade Centre
★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★2027 — dates TBCNext edition★Energy & SustainabilityAudience★2 days (2026)Duration★48 hoursQuote turnaround★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★2027 — dates TBCNext edition★Energy & SustainabilityAudience★2 days (2026)Duration★48 hoursQuote turnaround

World Green Economy Summit 2027 at a glance

The World Green Economy Summit (WGES) is a two-day summit in Dubai on how to finance and scale the green economy. It is organised by the Dubai Supreme Council of Energy, Dubai Electricity and Water Authority (DEWA) and the World Green Economy Organization (WGEO), under the patronage of His Highness Sheikh Mohammed bin Rashid Al Maktoum, and has been held at Dubai World Trade Centre (DWTC). The 12th edition ran on 21–22 October 2026. The organisers have not yet announced dates for 2027, so this page will be updated as soon as they are confirmed.

The 2026 theme was “From Success to Scale: Showcasing the Green Economy”, with 135 speakers across four pillars — energy technology and infrastructure, business strategy and transition, water and food, and finance — and three cross-cutting themes: artificial intelligence, governance, and system enablers such as supply chains and the circular economy. The audience is senior: ministers and government officials, project financiers, investors, developers, business leaders and academics.

In 2026 the summit ran alongside WETEX, DEWA’s water, energy, technology and environment exhibition, which took place at DWTC on 20–22 October 2026. As a Dubai-based stand builder working at DWTC as our home venue, SOL Dubai knows these halls well.

A conference-led event: what that means for exhibitors

It is worth being clear about what WGES is. It is a summit first. Most of the value sits in the plenary halls, ministerial sessions, panels and the conversations around them, not on a large exhibition floor. The organisers do not publish an exhibitor count, and the companies that take space are mostly sponsors. In 2025 the summit had 16 sponsors and supporters, led by ENOC as headline sponsor, with Dragon Oil, Emirates NBD, DUBAL Holding and National Bonds as gold sponsors and Dubai Green Fund, Etihad ESCO and Moro Hub as silver sponsors.

So the stands here are usually smaller and more focused than at a trade show: a sponsor booth near the session halls, a branded lounge or majlis where executives can sit down between sessions, or a single strong activation that tells one story. If your main goal is to show a large range of products to buyers, the exhibition next door is the better fit — see our WETEX stand page. If your goal is to be seen by policymakers and financiers and to hold a few high-value meetings, a well-designed space at WGES does that job.

What a WGES sponsor stand has to do

Delegates at a summit have very little time. They move between sessions in short breaks, so a sponsor space has a few minutes to make its point. The stand should carry one clear message linked to the summit’s pillars — a project you have delivered, a financing model, a measurable result — stated in a single line and backed by one or two hard numbers. Long lists of services get ignored.

The second job is hosting. Many of the people at WGES are the ones who sign off investment and policy, and the best outcome of a sponsorship is often a quiet 20-minute conversation with one of them. That means comfortable seating, a little acoustic privacy, somewhere to put a coffee and a screen for a short presentation. We design sponsor spaces around that meeting rather than around a counter, and keep the front open so the brand is visible to everyone walking past between sessions.

Our WGES stand build process

Every Dubai project runs through our eight-stage process, handled start to finish in-house:

  1. Discovery and brief — we review your sponsorship package and space allocation, the message you want to land, your meeting plans and budget, and confirm location and dimensions at DWTC once the 2027 floor plan is out.
  2. Concept and 3D design — visuals and a floor plan built around a clear brand statement and a comfortable meeting or lounge area.
  3. Costing and approval — a fixed, fully itemised quotation covering structure, furniture, power, AV and logistics.
  4. Venue approvals and technical drawings — structural and electrical submissions prepared for DWTC approval, coordinated with the organisers’ sponsor guidelines.
  5. Fabrication — walls, joinery, lounge furniture details and graphics built and quality-checked in our own workshop.
  6. Pre-build and QA — trial assembly so screens, lighting and finishes are proven before build-up.
  7. On-site installation — supervised build at DWTC during the official build-up window, which is short for a two-day summit.
  8. Show-day support and dismantling — standby team on call, then dismantling and storage of reusable elements for your next event.

Materials and messages that fit a green economy summit

At a summit about sustainability, delegates notice how a stand is built. We favour reusable modular frames, panels that can be re-skinned for the next event, FSC-certified timber, LED lighting and fabric graphics that pack flat and can be reprinted rather than thrown away. We can give you a simple list of what was reused, what was new and what will go back into stock after the show, so your sustainability team can report on it honestly. All materials are fire-retardant to DWTC rules.

On the message side, plain facts work best with this audience: megawatts installed, water saved, emissions avoided, capital deployed, with the year and the project named. A short looping video of a real site does more than a montage of stock images. We keep graphics clean and readable, and plan the screen content with you so it can be understood without sound in a busy foyer.

Working with a short build window and a busy week

Two-day summits usually have tight build-up and breakdown windows, and in 2026 WGES shared DWTC with WETEX in the same week. That means the stand has to arrive finished. We complete fabrication and finishing in our Al Quoz workshop, trial-assemble it, and use the hall time only for assembly, power connection and final dressing. Furniture, AV and catering points are confirmed in advance so nothing is waiting on site.

Many organisations that sponsor WGES also exhibit at WETEX or at other energy events in the region. We can design one stand family for both, build them as a single project with one project manager, and reuse elements across events to keep cost and waste down.

Booking lead times

For a custom stand at DWTC we recommend starting 8–14 weeks before the show, and earlier for a double-decker or a large pavilion, because the venue’s technical approval and permits come before any building starts. A modular stand with custom graphics needs less lead time. Send us your hall, stand size and show dates and we will set out a build timeline that fits them.

The steps are the same for every show. We agree the brief and budget, then send 3D concepts and a costed quote. Once the design is approved we prepare the structural drawings and submit them to the organiser and DWTC for approval. Fabrication runs in our workshop alongside that approval, so the stand is built and checked before move-in. On site we handle the build, power and furniture, stay on call through the open days, and take everything down and clear the space at the end.

Stand options and pricing

We build every format a summit sponsor needs: compact custom sponsor booths, branded lounges and majlis areas, single-feature activations such as an interactive screen or a model of a project, and modular stands that can be reused across the energy calendar. Larger partners sometimes want a premium build with a private meeting room; we design and build those too.

Indicative starting prices are from AED 950/sqm for modular, from AED 1,650/sqm for custom, from AED 2,400/sqm for premium builds and from AED 3,200/sqm for double-decker and pavilion builds. The final figure depends on size, structure, AV, furniture and branding. Every quotation is fixed and itemised, so the price you approve is the price you pay.

Why energy and sustainability brands choose SOL Dubai

We are a Dubai-based exhibition stand builder with our own workshop in Al Quoz, working at DWTC as our home venue. We handle summit sponsor spaces start to finish: design, fabrication, the venue approvals and on-site installation, with storage between events. Because we own the workshop, we can keep reusable elements in stock and rebuild them for the next edition.

Clients get workshop-built quality, a single accountable team and a price that holds from quotation to final invoice.

Building at Dubai World Trade Centre: the rules that shape your World Green Economy Summit 2027 stand

World Green Economy Summit 2027 is governed by the Dubai World Trade Centre’s own technical regulations. Get them right and your stand goes up cleanly; miss a submission and you lose build time, not just money. We design to all of this from the first sketch and file the paperwork for you.

Permit to Build

Every stand needs a DWTC Stand Permit to Build (PTB) before construction. We prepare and submit it so your build is cleared to start on day one of build-up.

Height & “complex” structures

Standard custom builds work to around 4m. Taller builds and anything DWTC classes as complex — double-deckers, long spans, or stands where the travel distance to an exit exceeds 10m — trigger structural-engineer clearance through DWTC’s Organiser+ portal before the Permit to Build is released, and the engineer can halt an unsafe build on site.

Double-deckers

A two-storey stand needs certified structural calculations, a Double-Deck health-and-safety declaration, a displayed maximum-occupancy figure and code-compliant staircases — at least 1m wide with handrails, and a second staircase once an upper deck passes ~200 sqm or sits over 25m from the stairs.

Electrical power

All mains power is supplied by DWTC’s official Electrical Contractor and ordered in advance — you can’t self-wire mains. We design the scheme and order it, including 24-hour power where your stand needs it.

Rigging & suspended elements

Banners and lighting rigs hung from the hall are subject to DWTC approval and load limits and ordered ahead of tenancy. We prepare and file the rigging submission on time.

Fixings & fire-safe materials

Nothing may be fixed to the floors, walls, ceilings or structural steel, and all materials must be fire-retardant — Perspex is prohibited (Lexan and Macralon are accepted). We complete and inspect finishes in our workshop, so the on-site crew assembles an approved build.

Accreditation & deadlines

Every contractor needs a DWTC Contractor+ digital badge and PPE is mandatory. Structural, rigging and electrical submissions run weeks ahead of build-up, and late orders attract surcharges — we manage the badges and the deadlines.

Recent Builds

Recent builds from our workshop

Real stands designed and built by our in-house team. Every stand is pre-built and inspected before it ships to Dubai World Trade Centre.

SOL Dubai custom stand, built in our Dubai workshop
Custom stand · SOL Dubai
SOL Dubai island stand, built in our Dubai workshop
Island stand · SOL Dubai
SOL Dubai double-decker, built in our Dubai workshop
Double-decker · SOL Dubai
SOL Dubai feature-lit, built in our Dubai workshop
Feature-lit · SOL Dubai
SOL Dubai bespoke build, built in our Dubai workshop
Bespoke build · SOL Dubai
SOL Dubai country pavilion, built in our Dubai workshop
Country pavilion · SOL Dubai
View our full portfolio
Transparent Pricing

World Green Economy Summit 2027 stand pricing — all-inclusive

One quote covers design, in-house build, graphics, delivery, install, dismantle and venue paperwork — fixed and itemised, with a free 3D concept before you commit.

Modular
9–18 sqm
From
AED 950 / sqm
Best for: first-time and value-focused exhibitors
  • Reusable system structure
  • Custom-printed graphics
  • LED lighting & furniture
  • Delivery, install & dismantle
  • Venue paperwork handled
Get a quote
Premium
50–100 sqm
From
AED 2,400 / sqm
Best for: large, high-impact stands with demo space
  • Everything in Custom, plus:
  • Large-scale custom build
  • Double-height feature elements
  • Full AV & feature lighting
  • Demo / hospitality area
  • Priority in-house build slot
Get a quote
Double-Decker / Pavilion
100+ sqm
From
AED 3,200 / sqm
Best for: flagship presence and country pavilions
  • Everything in Premium, plus:
  • Two-storey engineered build
  • VIP lounge & meeting rooms
  • Certified structural sign-off
  • Country-pavilion capable to 1,500 sqm
Get a quote

Not included: venue space rental (paid to the organiser), and venue electrical & rigging orders (we place these at the advance rate on your behalf and bill at cost). Bespoke add-ons are quoted line by line, so the number you sign is the number you pay.

Case Studies

Real briefs. Real results.

See how brands turn raw floor space into a working show presence — every project handed over to a documented client sign-off.

Explore all case studies →
Field Notes

Build notes for Dubai World Trade Centre

The detail that isn’t in the exhibitor manual — from the people who build here.

CD
Carlos Dalè
General Manager, SOL Dubai · oversees stand design and build to venue rules across Dubai, Abu Dhabi and Riyadh
01

Permit to Build gates everything — file the structural calcs early

At DWTC nothing gets built without a Permit to Build, and for any complex or double-deck stand that permit depends on structural calculations clearing the DWTC engineer. We submit on Organiser+ the week the design is signed off — a late structural file, not the build, is what most often delays a stand.

02

Mains power is DWTC’s to supply — order it, don’t wire it

All mains electrical comes from DWTC’s official contractor and is ordered in advance. We book power — including 24-hour supply where a stand needs it — at the advance rate so nothing is sitting dead on opening morning.

03

Finish in the workshop — Perspex won’t pass

Only fire-retardant materials are allowed and Perspex is specifically prohibited (we use Lexan or Macralon). We complete and inspect every finish at our workshop, so the on-site crew assembles an approved build instead of fabricating in the hall.

04

Lock the slot early

DWTC’s calendar is packed, so build-up slots, rigging and power book out and late orders cost more. We secure your space-only window and order services at the advance rate.

Common mistakes, in order of frequency

  1. An oversized logo on the back wall that crowds out the one-line proposition a buyer reads in three seconds.
  2. The same graphic on the front and side panels of an inline stand — the aisle-facing side panel is your most wasted surface.
  3. A counter or sign at the very front that blocks the sightline into the stand and stops buyers stepping in.
  4. Under-ordering power — no 24-hour supply for fridges, screens or live demos, so the stand isn’t ready on opening morning.
  5. Leaving structural, rigging and electrical orders until after the venue deadlines and paying avoidable surcharges.
FAQ

World Green Economy Summit 2027 stand questions, answered

Real answers with real numbers — including the venue’s build rules. Click any question to expand.

When and where is the World Green Economy Summit 2027?
The organisers have not yet announced the 2027 dates. The 12th edition ran on 21–22 October 2026 at Dubai World Trade Centre, organised by the Dubai Supreme Council of Energy, DEWA and the World Green Economy Organization. We will update this page when the 2027 dates are confirmed.
How big is the World Green Economy Summit?
The 2026 edition had 135 speakers. The organisers did not publish attendance or exhibitor totals. In 2025 the summit had 16 sponsors and supporters, led by ENOC as headline sponsor.
Is there an exhibition at WGES?
WGES is a conference-led summit, and the companies that take space are mostly sponsors with booths, lounges or activations. In 2026 it ran in the same week as WETEX at DWTC, which is the larger exhibition for products and solutions.
Who attends the World Green Economy Summit?
Ministers and government officials, project financiers, investors, developers, business leaders, infrastructure experts and academics working on the green economy.
How much does a WGES sponsor stand cost?
A full-service WGES stand starts from AED 950/sqm for a modular build, AED 1,650/sqm for a bespoke custom stand, AED 2,400/sqm for large premium builds and AED 3,200/sqm for double-decker and pavilion builds. Prices are approximate starting points; every quote is fixed and itemised with a free 3D concept.
How far ahead should we book a stand for World Green Economy Summit?
We recommend starting 8–14 weeks before the show for a custom stand, and earlier for a double-decker or pavilion, because the venue’s structural approval and permits come first. A modular stand with custom graphics needs less lead time. Send us your hall and stand size and we will set out a timeline that fits your dates.
Can you build a branded lounge or majlis instead of a booth?
Yes. Many summit sponsors get more value from a comfortable seating area where executives can meet between sessions. We design and build lounges with branding, screens, acoustic panels and furniture to suit the space allocated.
Can you make our stand more sustainable?
Yes. We use reusable modular frames, re-skinnable panels, FSC-certified timber, LED lighting and fabric graphics, and can give you a simple note of what was reused and what goes back into stock after the show.
Can you build stands for both WGES and WETEX?
Yes. Where a company sponsors the summit and exhibits at WETEX, we design one stand family, build both as one project with one project manager, and reuse elements to keep cost and waste down.
Who handles the Dubai World Trade Centre permits and approvals?
We do, start to finish. Every stand at DWTC needs a Stand Permit to Build, and complex structures need structural calculations cleared by the DWTC engineer first. We prepare the drawings, submit them and manage the approval.
How is power arranged for screens and lighting?
Mains power at DWTC is supplied by the venue’s official electrical contractor and ordered in advance. We design what your stand needs and place the orders at the advance rate.
Do you build double-decker stands at WGES?
We can, but a summit sponsor space rarely needs one. A two-storey stand needs certified structural calculations, a displayed maximum-occupancy figure and code-compliant staircases, and we engineer and build it in-house when a partner has the space and wants a private upper floor.
What’s included in a full-service WGES stand?
Custom 3D design, in-house fabrication and pre-build, full graphics, delivery to Dubai World Trade Centre, install and dismantle, the DWTC Permit to Build and H&S paperwork, electrical ordered on your behalf, and a dedicated project manager. Sponsorship fees and space are paid to the organisers and are not included. Our team is on call across both summit days for any fixes.
What happens to the stand after the summit?
We dismantle and clear the space, and can store reusable stand elements in our Al Quoz workshop for your next event, so you are not paying to rebuild from scratch.
More Shows

More energy & sustainability shows we build for

Other shows our in-house team designs and builds for, with the same full-service service and full venue handling.

See the full show calendar

Get your World Green Economy Summit 2027 stand quote in 48 hours

Custom 3D rendering and all-inclusive pricing, designed to Dubai World Trade Centre’s rules with structural sign-off built into the timeline. We build in-house and install on site — the stand you approve in the rendering is the stand that opens.

Request a free quote
Live now