Skip to content
Home › Shows › Food & Beverage › World of Coffee Dubai 2027
Dubai · DWTCFood & Beverage

World of Coffee Dubai 2027 Exhibition Stand Design & Build (DWTC)

Full-service custom stands for World of Coffee Dubai 2027 at Dubai World Trade Centre — design, in-house build, the DWTC Permit to Build and H&S paperwork, power, water and drainage for working coffee bars, install and on-stand support.

Custom exhibition stand designed and built by SOL Dubai at Dubai World Trade Centre
★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★26–28 Jan 2027Next edition★Food & BeverageAudience★3 daysDuration★48 hoursQuote turnaround★From AED 950 / sqmStarting price★Dubai World Trade CentreVenue★26–28 Jan 2027Next edition★Food & BeverageAudience★3 daysDuration★48 hoursQuote turnaround

World of Coffee Dubai 2027 at a glance

World of Coffee Dubai is the Middle East’s specialty coffee trade show, run by DXB LIVE in partnership with the Specialty Coffee Association, which owns the World of Coffee brand. The 2027 edition, the sixth since the show began in 2022, runs for three days, 26–28 January 2027, at the Dubai World Trade Centre (DWTC) in Za’abeel Hall 1 and Za’abeel Halls 4–6.

The organisers position it as the gateway to the MENA coffee market: a place to show products, meet buyers and connect with the coffee community. The 2026 edition recorded 20,000+ visits from 80+ countries. For 2027 the organisers plan a floor of more than 25,000 square metres and expect 450+ exhibitors.

Alongside the exhibition there is a full programme: talks on the Unfiltered Stage, workshops, competitions, the Coffee Design Awards, Best New Product, a Brew Bar, a Cupping Room and the Cafe Network. DWTC is our home venue, and the Za’abeel Halls are halls we build in regularly.

What a World of Coffee stand has to do

The people walking this show know coffee. They are roasters, producers and origin representatives, green coffee importers and traders, café owners and operators, baristas, and equipment buyers and distributors. Most of them will judge your coffee, your machine or your service by tasting, touching and watching it work. A stand that only shows bags on a shelf or a machine that is switched off misses the point of the show.

So most coffee stands are working bars. A roaster wants to pour, a machine maker wants a barista pulling shots on the equipment, and an origin exhibitor wants to cup. Around that bar the stand has a second job: a quieter place to sit down with an importer, a café group or a distributor and talk volumes, pricing and supply. Coffee deals often start with a cup at the counter and end at a table further in, so the layout should lead people from one to the other.

Our World of Coffee stand build process

Every Dubai project runs through our eight-stage process, handled in-house from brief to dismantle:

  1. Discovery and brief — we list every machine, grinder, roaster or brew station you will run, with its power, water and drainage needs, and confirm your hall, stand number and dimensions at DWTC.
  2. Concept and 3D design — visuals and a floor plan that put the working bar where visitors can queue without blocking the aisle, and meeting space behind it.
  3. Costing and approval — a fixed, itemised quote covering structure, bar joinery, services, AV and logistics.
  4. Venue approvals and technical drawings — structural, electrical and services submissions prepared for DWTC.
  5. Fabrication — bar counters, back bars, shelving, walls and graphics built in our own workshop with wet-area finishes.
  6. Pre-build and QA — trial assembly with machine positions, pipe runs and cable routes checked before build-up.
  7. On-site installation — supervised build at DWTC, with services connected and tested before opening.
  8. Show-day support and dismantling — a standby team on call for all three days, then dismantling and return of your equipment.

Building a working coffee bar on the show floor

Espresso machines, grinders and batch brewers are hungry for power, and a busy bar may run several of them all day. Mains power at DWTC is supplied by the venue’s official electrical contractor and ordered in advance, and water and drainage are venue orders as well. We work out the total load and the number of water points with you at the design stage, so the machines are hot and running on opening morning rather than waiting for a connection.

The bar itself is built like a café counter, not a display stand. Worktops are hard-wearing and easy to clean, the back bar has space for milk fridges, cups and waste, and floors around the bar are finished to cope with spills. Pipes and cables run under a raised floor. Storage matters more than most exhibitors expect: three days of coffee, milk, cups and cleaning supplies need a proper back room, not a corner behind a curtain. All materials are fire-retardant to DWTC rules.

Cupping, roasting and origin stands

Not every coffee stand is an espresso bar. Green coffee traders and origin representatives often want a cupping table with good daylight-balanced lighting, space for a small group to move around it and somewhere to set out samples by farm and process. Roaster manufacturers may want a machine running on the stand, which raises questions about heat, smoke and extraction that the organiser and venue control. We check what is allowed in your hall before the design is fixed and build around those rules.

Origin and country stands also tend to carry a story: region, farm, altitude, process, certification. Short, well-placed graphics and a screen showing the farms do more than long text panels. Where several producers share one stand, we can build it as a small country pavilion with a shared cupping area and individual counters.

Standing out among the coffee programme

World of Coffee Dubai is busy. Competitions, talks and the Brew Bar all pull visitors around the halls, so your stand has a few seconds to say what you do as people pass. One clear line on what you sell and who it is for, readable from the aisle, works better than a large logo. Queues at a working bar are good, but they need space so they do not block the stand front or the aisle.

Think about what visitors take away. Sample bags, price sheets for café buyers and a simple way to scan contact details all help turn a cup into a lead. We design these touchpoints into the layout from the first sketch. If you also exhibit equipment at GulfHost, a modular bar can be built to travel between both shows.

Booking lead times

For a custom stand at DWTC we recommend starting 8–14 weeks before the show, and earlier for a double-decker or a large pavilion, because the venue’s technical approval and permits come before any building starts. A modular stand with custom graphics needs less lead time. Send us your hall, stand size and show dates and we will set out a build timeline that fits them.

The steps are the same for every show. We agree the brief and budget, then send 3D concepts and a costed quote. Once the design is approved we prepare the structural drawings and submit them to the organiser and DWTC for approval. Fabrication runs in our workshop alongside that approval, so the stand is built and checked before move-in. On site we handle the build, power and furniture, stay on call through the open days, and take everything down and clear the space at the end.

Stand options and pricing

We build every format at this show. Modular stands suit smaller roasters and first-time exhibitors who need branding, a compact bar and a meeting point. Custom single-storey stands give you a bespoke bar, cupping area and seating. Double-decker stands add a meeting or hospitality floor above a busy bar, which suits larger equipment brands and distributors hosting café groups.

Prices start from AED 950 per square metre for modular, AED 1,650 for custom, AED 2,400 for premium builds and AED 3,200 for double-decker and pavilion builds. The final figure depends on stand size, the number of working stations, services, meeting space and branding. Every quote is fixed and itemised, so the price you approve is the price you pay.

Why coffee brands choose SOL Dubai

We are a Dubai-based stand builder with our own workshop in Al Quoz, and DWTC is the venue we work in most. We handle World of Coffee stands from start to finish: design, fabrication, venue approvals, power, water and drainage, on-site installation and dismantling. Working bars, counters and hospitality areas are the kind of joinery our workshop builds every season.

Clients get workshop-built quality, one accountable team and a price that holds from quote to final invoice.

Building at Dubai World Trade Centre: the rules that shape your World of Coffee Dubai 2027 stand

World of Coffee Dubai 2027 is governed by the Dubai World Trade Centre’s own technical regulations. Get them right and your stand goes up cleanly; miss a submission and you lose build time, not just money. We design to all of this from the first sketch and file the paperwork for you.

Permit to Build

Every stand needs a DWTC Stand Permit to Build (PTB) before construction. We prepare and submit it so your build is cleared to start on day one of build-up.

Height & “complex” structures

Standard custom builds work to around 4m. Taller builds and anything DWTC classes as complex — double-deckers, long spans, or stands where the travel distance to an exit exceeds 10m — trigger structural-engineer clearance through DWTC’s Organiser+ portal before the Permit to Build is released, and the engineer can halt an unsafe build on site.

Double-deckers

A two-storey stand needs certified structural calculations, a Double-Deck health-and-safety declaration, a displayed maximum-occupancy figure and code-compliant staircases — at least 1m wide with handrails, and a second staircase once an upper deck passes ~200 sqm or sits over 25m from the stairs.

Electrical power

All mains power is supplied by DWTC’s official Electrical Contractor and ordered in advance — you can’t self-wire mains. We design the scheme and order it, including 24-hour power where your stand needs it.

Rigging & suspended elements

Banners and lighting rigs hung from the hall are subject to DWTC approval and load limits and ordered ahead of tenancy. We prepare and file the rigging submission on time.

Fixings & fire-safe materials

Nothing may be fixed to the floors, walls, ceilings or structural steel, and all materials must be fire-retardant — Perspex is prohibited (Lexan and Macralon are accepted). We complete and inspect finishes in our workshop, so the on-site crew assembles an approved build.

Accreditation & deadlines

Every contractor needs a DWTC Contractor+ digital badge and PPE is mandatory. Structural, rigging and electrical submissions run weeks ahead of build-up, and late orders attract surcharges — we manage the badges and the deadlines.

Recent Builds

Recent builds from our workshop

Real stands designed and built by our in-house team. Every stand is pre-built and inspected before it ships to Dubai World Trade Centre.

SOL Dubai custom stand, built in our Dubai workshop
Custom stand · SOL Dubai
SOL Dubai island stand, built in our Dubai workshop
Island stand · SOL Dubai
SOL Dubai double-decker, built in our Dubai workshop
Double-decker · SOL Dubai
SOL Dubai feature-lit, built in our Dubai workshop
Feature-lit · SOL Dubai
SOL Dubai bespoke build, built in our Dubai workshop
Bespoke build · SOL Dubai
SOL Dubai country pavilion, built in our Dubai workshop
Country pavilion · SOL Dubai
View our full portfolio
Transparent Pricing

World of Coffee Dubai 2027 stand pricing — all-inclusive

One quote covers design, in-house build, graphics, delivery, install, dismantle and venue paperwork — fixed and itemised, with a free 3D concept before you commit.

Modular
9–18 sqm
From
AED 950 / sqm
Best for: first-time and value-focused exhibitors
  • Reusable system structure
  • Custom-printed graphics
  • LED lighting & furniture
  • Delivery, install & dismantle
  • Venue paperwork handled
Get a quote
Premium
50–100 sqm
From
AED 2,400 / sqm
Best for: large, high-impact stands with demo space
  • Everything in Custom, plus:
  • Large-scale custom build
  • Double-height feature elements
  • Full AV & feature lighting
  • Demo / hospitality area
  • Priority in-house build slot
Get a quote
Double-Decker / Pavilion
100+ sqm
From
AED 3,200 / sqm
Best for: flagship presence and country pavilions
  • Everything in Premium, plus:
  • Two-storey engineered build
  • VIP lounge & meeting rooms
  • Certified structural sign-off
  • Country-pavilion capable to 1,500 sqm
Get a quote

Not included: venue space rental (paid to the organiser), and venue electrical & rigging orders (we place these at the advance rate on your behalf and bill at cost). Bespoke add-ons are quoted line by line, so the number you sign is the number you pay.

Case Studies

Real briefs. Real results.

See how brands turn raw floor space into a working show presence — every project handed over to a documented client sign-off.

Explore all case studies →
Field Notes

Build notes for Dubai World Trade Centre

The detail that isn’t in the exhibitor manual — from the people who build here.

CD
Carlos Dalè
General Manager, SOL Dubai · oversees stand design and build to venue rules across Dubai, Abu Dhabi and Riyadh
01

Permit to Build gates everything — file the structural calcs early

At DWTC nothing gets built without a Permit to Build, and for any complex or double-deck stand that permit depends on structural calculations clearing the DWTC engineer. We submit on Organiser+ the week the design is signed off — a late structural file, not the build, is what most often delays a stand.

02

Mains power is DWTC’s to supply — order it, don’t wire it

All mains electrical comes from DWTC’s official contractor and is ordered in advance. We book power — including 24-hour supply where a stand needs it — at the advance rate so nothing is sitting dead on opening morning.

03

Finish in the workshop — Perspex won’t pass

Only fire-retardant materials are allowed and Perspex is specifically prohibited (we use Lexan or Macralon). We complete and inspect every finish at our workshop, so the on-site crew assembles an approved build instead of fabricating in the hall.

04

Lock the slot early

DWTC’s calendar is packed, so build-up slots, rigging and power book out and late orders cost more. We secure your space-only window and order services at the advance rate.

Common mistakes, in order of frequency

  1. An oversized logo on the back wall that crowds out the one-line proposition a buyer reads in three seconds.
  2. The same graphic on the front and side panels of an inline stand — the aisle-facing side panel is your most wasted surface.
  3. A counter or sign at the very front that blocks the sightline into the stand and stops buyers stepping in.
  4. Under-ordering power — no 24-hour supply for fridges, screens or live demos, so the stand isn’t ready on opening morning.
  5. Leaving structural, rigging and electrical orders until after the venue deadlines and paying avoidable surcharges.
FAQ

World of Coffee Dubai 2027 stand questions, answered

Real answers with real numbers — including the venue’s build rules. Click any question to expand.

When and where is World of Coffee Dubai 2027?
World of Coffee Dubai 2027 takes place from 26 to 28 January 2027 at the Dubai World Trade Centre (DWTC), in Za’abeel Hall 1 and Za’abeel Halls 4–6. It is run by DXB LIVE in partnership with the Specialty Coffee Association.
How much does a World of Coffee Dubai stand cost?
A full-service stand starts from about AED 950/sqm for a modular build, AED 1,650/sqm for a custom stand, AED 2,400/sqm for large premium builds and AED 3,200/sqm for double-decker and pavilion builds. These are approximate starting points; every quote is fixed and itemised, with a free 3D concept.
How far ahead should we book a stand for World of Coffee Dubai?
We recommend starting 8–14 weeks before the show for a custom stand, and earlier for a double-decker or pavilion, because the venue’s structural approval and permits come first. A modular stand with custom graphics needs less lead time. Send us your hall and stand size and we will set out a timeline that fits your dates.
Who handles the Dubai World Trade Centre permits and approvals?
We do. Every stand at DWTC needs a Stand Permit to Build, and complex or double-deck stands need structural calculations cleared by the DWTC engineer through the Organiser+ portal first. We prepare the drawings, submit them and manage the approval.
Can I get power, water and drainage for espresso machines?
Yes, ordered through the venue. Mains power at DWTC is supplied by the venue’s official electrical contractor and ordered in advance, and water and drainage are also venue orders. We work out the load and number of water points with you and place the orders at the advance rate.
Do you build double-decker stands at World of Coffee Dubai?
Yes. A two-storey stand adds a meeting or hospitality floor above an open bar area. It needs certified structural calculations, a displayed maximum-occupancy figure and code-compliant staircases. We engineer, certify and build it in-house.
What’s included in a full-service World of Coffee stand?
Custom 3D design, in-house fabrication and pre-build, full graphics, delivery to Dubai World Trade Centre, install and dismantle, the DWTC Permit to Build and H&S paperwork, electrical and rigging ordered on your behalf, and a dedicated project manager. Venue space rental is paid to the organiser and is not included.
Do you provide on-site support during the show?
Yes. Our team is on call across all three show days for anything from a graphic touch-up to an electrical or water fault, and larger stands get a dedicated on-site project lead.
What happens to the stand and equipment after the show?
We dismantle and clear the space, return your machines and stock or hand them to your logistics agent, and can store the bar and other reusable elements for the next edition.
How big is World of Coffee Dubai?
The 2026 edition recorded 20,000+ visits from 80+ countries. For 2027 the organisers plan more than 25,000 square metres of space and expect 450+ exhibitors.
Can you build a working coffee bar?
Yes. We build bars like café counters, with hard-wearing worktops, a back bar for fridges and cups, spill-proof floors, pipes and cables under a raised floor, and a back room for stock.
Can we run a roaster on the stand?
Heat, smoke and extraction are controlled by the venue and the organiser. We check what is allowed in your hall before the design is fixed and build the roasting area around those rules.
Can several producers share one stand?
Yes. We build shared origin stands and small country pavilions with a common cupping area and individual counters, managed as one project with one set of approvals.
What else happens at World of Coffee Dubai?
The programme includes talks on the Unfiltered Stage, workshops, competitions, the Coffee Design Awards, Best New Product, a Brew Bar, a Cupping Room and the Cafe Network.
More Shows

More food & beverage shows we build for

Other shows our in-house team designs and builds for, with the same full-service service and full venue handling.

See the full show calendar

Get your World of Coffee Dubai 2027 stand quote in 48 hours

Custom 3D rendering and all-inclusive pricing, designed to Dubai World Trade Centre’s rules with structural sign-off built into the timeline. We build in-house and install on site — the stand you approve in the rendering is the stand that opens.

Request a free quote
Live now